I n t e g r i t y - S e r v i c e - E x c e l l e n c e Headquarters U.S. Air Force 1 The FY12 Environmental Restoration Program and Draft Restoration.

Slides:



Advertisements
Similar presentations
Integrating an EMS Framework into the Pollution Prevention Program at Tinker AFB 30th Environmental & Energy Symposium & Exhibition April 8, 2004 San Diego,
Advertisements

1 U.S. Army Corps of Engineers – Environmental Community 4/27/2015 USACE PERSPECTIVES ON CONTRACTING PROGRAMS FUDS FOCUS Robert F. Lubbert, P.E. 14 April.
Army Implementation of Performance-Based Contracting 29 Jun 05 Mr. Jim Daniel Chief, Cleanup Division, USAEC.
1 Bruce Lowrey Office of the Assistant Secretary of the Navy (RD&A) Deputy Asst. Secretary for Acquisition Eric Ferraro WAWF Program Manager Program Executive.
1 1 5/8/2015 3:22 AM UNCLASSIFIED Joint Basing Impact to Navy Joint Basing Impact to Navy W. RICK McKUTCHIN CNIC, HQ N80 Regional Support Joaella Lane,
Financial Accountability: Audit Committees & Internal Audit Update Financial Analysis & Accountability Branch Finance Committee Workshop March 2010.
Provide and support mission ready Arctic Warriors from America’s premier Joint Base community 673d Air Base Wing Leadership Update JBER-Richardson Housing.
Naval Facilities Engineering Command Southwest
Civil Works Baltimore District River and Harbor Projects.
Event Location Event Date and Location ADC WINTER FORUM | PAGE 2 The Power of EUL Air Force Enhanced Use Lease Program Update Brian Brown, Air Force.
Permanent Joint Headquarters Strategies for Sharing Best Practices Lt Col Mark Payne PJHQ-J7 Lessons OKX Scott R. Smith DIA-D2X-ES-C.
State Milestones Subsidized Insurance Workgroup High Level Timeline 2011 Jan 2011 Feb 2011 Mar 2011 Apr 2011 May 2011 Jun 2011 Jul 2011 Aug 2011 Sept 2011.
United States Air Force I n t e g r i t y - S e r v i c e - E x c e l l e n c e Moody Water and Wastewater Plant Initiative Lt Col Patrick Albritton, 23.
I n t e g r i t y - S e r v i c e - E x c e l l e n c e Headquarters U.S. Air Force 25 August Air Force EUL Enhanced Use Lease Program Charleston.
Society of American Military Engineers San Antonio Post, Industry Day Dezso Linbrunner Environmental Remediation Branch U.S. Army Corps of Engineers Omaha.
This Briefing is: UNCLASSIFIED Headquarters Air Combat Command Air Combat Command’s Transformation of Environmental Remediation Margaret C. Patterson HQ.
BUILDING STRONG ® US Army Corps of Engineers – Norfolk District SAME Industry Day Richard Klein Chief, Programs Branch Norfolk District 21 October 2010.
United States Air Force Reserve Fly, Fight and Win… I n t e g r i t y - S e r v i c e - E x c e l l e n c e 1 Lt Col Gregory Ottoman Programs Division.
I n t e g r i t y - S e r v i c e - E x c e l l e n c e Headquarters U.S. Air Force Base Conversion Directorate Presented by Lt. Col. Daniel Welch AFCEE/BC.
Environmental Programs Update SAME Northern Virginia Post Monthly Meeting Rob Sadorra, MBA, M.Eng., P.E. Director, Environmental Restoration Division NAVFAC.
BUILDING STRONG ® Fort Worth District Carolyn Staten USACE-SWF-Fort Worth, Texas Deputy Office of Small Business Programs 5 th Annual Business Conference.
I n t e g r i t y - S e r v i c e - E x c e l l e n c e 1 Air Force Center for Environmental Excellence Dale Clark, AFCEE/ICC Air Force Center for Environmental.
I n t e g r i t y - S e r v i c e - E x c e l l e n c e Headquarters U.S. Air Force Renewable Energy Challenges -an Air Force view 1 Ken Gray Energy Rates.
Compatible Development Around Military Installations Joint Land Use Study Program Office of Economic Adjustment David MacKinnon Associate Director Joint.
Spatial Pattern of PM2.5 over the US PM2.5 FRM Network Analysis for the First Year: July 1999-June 2000 Prepared for EPA OAQPS Richard Scheffe by Rudolf.
Comparison of Arithmetic Mean Stage vs. Weighted Mean Stage in Refuge Compliance Calculations Cheol Mo, PhD Lead Environmental Scientist South Florida.
February’s Accomplishments Met extensively with FTA staff and received the Record of Decision from FTA Finalized Negotiations with the top ranked Design.
Seattle District MILITARY CONSTRUCTION PROGRAM
Department of the Navy DoN WAWF 14 December 2005.
Name/Office Symbol/(703) XXX-XXX (DSN XXX) / addressDate-Time-Group 19 September 2008 Fort Monroe Closure Environmental Planning.
The SaTH Foundation Trust Programme Deborah Shaw March 29th 2007.
The World Bank’s Business Warehouse (BW): Interpreting and Analyzing Procurement Data Marcelo Donolo, OPCPR May 10, 2005.
Josh Metz, Associate Planner Regional Urban Design Guidelines Update to FORA Board September 19, 2014.
I n t e g r i t y - S e r v i c e - E x c e l l e n c e Headquarters U.S. Air Force Integrating Air Force Environmental Programs into Core Business Practices.
ESPLOST Update Savannah-Chatham County Public Schools January 9, 2008.
Report to the SSC Jan 10, Report to the SSC-Jan 10/02Page 2 Key Dates Nov 13-14/01Preship Review Jan 4/02Final review before disassembly Jan 7Start.
2011 Senior Leaders Seminar CARAT Cooperation Afloat Readiness and Training 30 March 2011 Bangkok, Thailand CDR Troy Amundson COMLOG WESTPAC CTF 73 CARAT.
1 DoD-VA Partnership Status 1 September, DoD/VA Partnership How does MEPRS relate to this? Let’s see……
Baseline The baseline at July Previously there was a lack of consistency for: Pathways into specialist clinics; Policies, procedures and guidelines.
Industry Assistance Office (IAO) What we do * Focal point for the Goddard Contractor community regarding business opportunities at the Center * Critical.
AFPC Civilian HR Service Delivery
2016 SAME Jacksonville Post Industry Day 8 Dec 2016
Warrior Care Support Programs AFW2 Program – Care Beyond Duty
Evaluation of FY12 Tracking and FY13 Planning Process
Jan 2016 Solar Lunar Data.
SAME Industry Day Richard Klein BUILDING STRONG®
Air Force Construction Management
AAFES/Wal-Mart - Major Locations, USA
Briefing for Oklahoma Airport Operators Association
Missions Sustained: The Sikes Act in Action
DeCA Central & East Areas
Iowa College Aid Processing System (ICAPS)
Q1 Q2 Q3 Q4 PRODUCT ROADMAP TITLE Roadmap Tagline MILESTONE MILESTONE
Proposed Strategic Planning Process for FY 2013/14 thru FY 2015/16
GOMACTech-04 Technical Program Committee Timeline
Performance Based Contracts
Electricity Cost and Use – FY 2016 and FY 2017
CYCLE 2019 Application Process & Timeline
Back-End Payor Sub-Group
Agricultural Marketing
Revised Tender Timescale for DN Interruption Arrangements
Agricultural Marketing
Agricultural Marketing
Omnibus IV Contract Overview Elieen Emond Contract Specialist
Agricultural Marketing
Task 7: Green Procurement from Local Sources
Q1 Q2 Q3 Q4 PRODUCT ROADMAP TITLE Roadmap Tagline MILESTONE MILESTONE
XRN Feb 19 Minor Release - Status Update
XRN 4927 – MiR Drop 4 - Status Update
Q1 Q2 Q3 Q4 PRODUCT ROADMAP TITLE Roadmap Tagline MILESTONE MILESTONE
Presentation transcript:

I n t e g r i t y - S e r v i c e - E x c e l l e n c e Headquarters U.S. Air Force 1 The FY12 Environmental Restoration Program and Draft Restoration Master Plan Col Knippel AFCEE/ER 28 July 11

I n t e g r i t y - S e r v i c e - E x c e l l e n c e Overview New PBR Paradigm FY11 Program Status FY12 Program Update Way Ahead 2

I n t e g r i t y - S e r v i c e - E x c e l l e n c e XYZ AFB JAN JUN PBC Award Date BRIDGE FY10 FY11 FY12 FY13 FY14 FY15 FY16 LTM RA-O RD/RA ROD MORE DATA RI/FS PA/SI Objective based Contract Contract Payment: When you meet the objective One contract across the spectrum Goal site acceleration/closure or lowest life cycle cost Proposal not part of the contract Diversify risk by inclusion of many sites or bases Measure of success = the achievement of objectives PA/SI RI/FS ROD RD/RA RA-O MORE DATA LTM New PBR Paradigm OLD NEW

I n t e g r i t y - S e r v i c e - E x c e l l e n c e 4 FY11 PBRs ROM by InstallationMap of FY11 Installations Installation/Group Total ROM ($M) # SITES CAPTURED Shaw AFB (USACE)16 Andrews AFB (USACE)36 Barksdale18 Pt Lay1 Texas Group 47 Tinker AFB29 FE Warren Group 54 Robins AFB 19 Midwest Region 162 Tyndall AFB 43 Vandenberg AFB 310 Totals $

I n t e g r i t y - S e r v i c e - E x c e l l e n c e FY11 EOY Program Strategy Awarding FY11 PBCs. On track to award: 9 via AFCEE 2 via USACE Buying down future year risk Focusing on ASC Goals by buying down future year CRP and establishing bridge contracts for future PBCs FY12 Mid-Western Regional CRP Vandenberg CRP 611 th and Wake Island CRP MMRP surface clearance 5

I n t e g r i t y - S e r v i c e - E x c e l l e n c e FY12 Program 6 M+O $62.1M FY11 PBR $52M FY12 PBR $100M Bridge $177.1M Legal Requirements $61.6M Policy Requirements $71.3M TOA $525M Execution Totals:  $33M ANG  $245M AFCEE  $167M USACE

I n t e g r i t y - S e r v i c e - E x c e l l e n c e FY12 Program 7

I n t e g r i t y - S e r v i c e - E x c e l l e n c e 8 FY12 PBRs ROM by InstallationMap of FY12 Installations Installation/Group Total ROM ($M) FY12-20 # SITES CAPTURED Proposed SB Set Aside Anticipated RFP Release Date First Quarter Hawaii Group11XSept 30, 2011 Beale33 Sept 8, 2011 Second Quarter Alaska Group64 Nov 21, 2011 Oklahoma-Arkansas Group57 Nov 21, 2011 JBSA30XDec 12, 2011 New England Group26XDec 12, 2011 Third Quarter Upper Mid-West Group71 Feb 22, 2012 South West Group 39 Mar 13, 2012 California Group10XJan 22, 2012 March AFB11XFeb 21, 2012 Hill AFB50 Jan 28, 2012 Fourth Quarter South East Group72XApr 23, 2012 Great Lakes Group106XApr 23, 2012 Moody AFB13 Apr 23, 2012 FE Warren Group Follow on75XApr 23, 2012 Tyndall Follow on43 To Be Determined Andrews Follow on36 Jun 1, 2012 Total$ $128.43

I n t e g r i t y - S e r v i c e - E x c e l l e n c e *Note: Sites projecting to achieve ASC by the end of each FY Baseline 7577 SitesFY12FY13FY14FY15FY16FY17 Sites Closed per Year Cumulative Closed % Closed69.67%71.44%72.50%73.10%73.99%75.00% SAF/IE Goal50%75% Restoration Investment Plan M+O FY 11 PBC FY 12 PBC Bridge FY 13 PBC FY 14 PBC FY 15 PBC Legal Reqs Policy Reqs SC Buy Down $525M $523M $434M $408M $370M $376M Constrained-Leveled Data 9

I n t e g r i t y - S e r v i c e - E x c e l l e n c e FY13 PBRs Installation/Group Total ROM ($M) # SITES CAPTURED Charleston Air71 Atlantic Group104 Florida Group119 Florida Panhandle59 Kirtland35 McConnell27 MS-AL Group43 NM-AZ Group109 Eielson23 611th82 Fairchild33 Scott20 Travis32 Vandenberg311 Totals$ ROM by InstallationMap of FY13 Installations 10

I n t e g r i t y - S e r v i c e - E x c e l l e n c e FY 14/15 PBRs Installation/Group Total ROM ($M) # SITES CAPTURED Air Force Plant #59 1 Arnold AFB 15 Charleston Naval Wpns 70 Edwards AFB 64 Fort Dix 7 Lakehurst NAWCAD 15 McGuire AFB 63 Pt Lonely Dome (BD/DR) 2 Totals $ ROM by InstallationMap of FY14/15 Installations 11

I n t e g r i t y - S e r v i c e - E x c e l l e n c e 12 Questions? 12