Min Hydro-Egypt 1 Tunis, Sept 22-24, 2004 TIMS/EEAA Jerba-CDM-Investment-Forum UNEP RISOE / APEX EGYPT : Damietta Barrage Small Hydropower Project Eng.

Slides:



Advertisements
Similar presentations
Guatemala: El Canada Hydroelectric Project
Advertisements

Tel MW Wind Farm 100X850kW Wind Turbine 9 m/s Average Wind Speed 45% capacity factor 335 GWh/year Egypt / Spain Cooperation.
Fundamentals of PDD Analysis Recap of Theory and presentation of an illustrative PDD by Steve Thorne Maputo second SSA regional workshop 17 August 2004.
Capacity Development for CDM - National Workshop on PDD, Cairo June Capacity Development for CDM Fourth National Workshop Cairo, June.
PDD Preparation Cairo, June 14-15, 2004 TIMS/EEAA CD4CDM- Third National Workshop (Phase II) UNEP RISO / APEXVega Bahia Landfill Project Design Document.
Glenn S. Hodes UNEP Risø Center CDM Project Screening & PIN Development.
ww.neprisoe.org CDM Methodologies Carbon Markets – CDM project development 8. August 2011 Jørgen Fenhann.
Donors’ Conference on Sustainable Energy for Kosovo
SMALL UTILITY-SCALE RESOURCES (DISTRIBUTED GENERATION) 1.
Eng Rafik G. M. of Economic and Environment Studies NREA Baseline For Japanese Wind Power Plant Project in Zafarana (Arab Republic of Egypt)
POWER GRIDS AND CDM METHODOLOGIES Workshop for CDM stakeholders The World Bank Buenos Aires December 8, 2004.
EE535: Renewable Energy: Systems, Technology & Economics
Andrew Scanlon Environment and Sustainability Manager Hydro Tasmania Drought and Climate Change.
Baseline methodologies for grid- connected electricity – Context and Introduction to the Combined Margin Baseline Calculation Martina Bosi, World Bank.
Capacity Development for Clean Development Mechanism Project Idea Note (PIN) Preparation by Kofi Asante.
World Bank Experience with Power Sector Baselines Workshop on CDM Methodologies for Grid-Connected Power Projects Buenos Aires, 8 December 2004 Fernando.
EMPIRE- modelling the future European power system under different climate policies Asgeir Tomasgard, Christian Skar, Gerard Doorman, Bjørn H. Bakken,
PDD Preparation Cairo, June 14 th -15 th, 2004 TIMS/EEAA CD4CDM- Third National Workshop (Phase II) UNEP RISO / APEXPDD Preparation Process and Format.
Case Study: Jepirachi Wind Power Project Northeastern Atlantic Coast Colombia Charles Cormier, PCF Team Tel:
Simplified Financial Analysis for Landfill Gas Capture Projects Presented By: Dr. M. K. Elewa TIMS - Egypt Approved Baseline and Monitoring Methodology.
Carboncredits.nl Baseline Methodologies Dispatch Analysis Gerhard Mulder Project Officer.
UNIDO Vietnam Support for CDM projects in the Industrial sector: Pilot Project in Co-operation with the Austrian Industry Training Sessions on the Kyoto.
World Bank Water Week – 2004 Jerson Kelman. Hydroelectric power accounts for more than 90% of the total electric energy produced in Brazil.
CD4CDMCD4CDM Estimating CO 2 Emissions Reduction by example.
Reliable Power Reliable Markets Reliable People Performance Targets for the Customer Interconnection Process January, 2008.
AFREPREN/FWD Cogen Centre Training Workshop on Cogeneration in Africa
TIMS/EEAA CD4CDM- Fourth Regional Workshop (Phase II) UNEP RISO / APEX Egypt-CDM Projects Ranking Criteria Tunis, Aug 27-29, 2004.
Module 6: PINs M6. M6. PINs Contents: Project Identification Notes – how to structure them (including eligibility, baselines and additionality) Two projects.
Additionality and Project Cycle Tunis, August 27-29, 2004 TIMS/EEAA CD4CDM- Fourth Regional Workshop (Phase II) UNEP RISOE / APEXAdditionality in NovaGerar.
RECP AND ENTREPRENEUR DEVELOPMENT (FINANCING RECP IN EL SALVADOR) Yolanda Salazar de Tobar Executive Director NCPC EL SALVADOR.
The CDM Project Cycle. The first step -- submit a PIN (template on Description of Project Proponent Type of Project Location of.
Capacity Development for CDM Project Presentation of Selected PDD Methane capture and combustion from swine treatment for Peralilo By Kwaku Wiafe Senior.
CDM Projects: Renewable Energy and Energy Efficiency Projects Project cycles and Technical Issues.
Financing Structures and CDM Project Risks Cairo, April 4 th –April 5 th, 2005 TIMS/EEAA Fertilizers Workshop UNEP RISOE / APEXFinancing Structures and.
COMMUNITY CHOICE AGGREGATION: TECHNICAL STUDY RESULTS Peninsula Clean Energy September 24,2015.
Djerba Carbon Exhibition Djerba, September 22-24, 2004 Egyptian CDM ProjectsCDM Project Portfolio Egypt Amr Abdel-Aziz, Ph.D. Egypt.
1 Second Regional Workshop Capacity Development for the Clean Development Mechanism (CD4CDM) 23 March 2004 Siem Reap, Cambodia A.T. Biopower Rice Husk.
Capacity Development for CDM - RW4 Tunis, August Capacity Development for CDM General Description of the Project Cycle Tunis, August.
OVERVIEW OF CDM GUIDELINES ON UNEP CDM Guidebook/E7 Guide Dr. Bahaa Mansour TIMS Dr. Mohamed Elewa TIMS Presented by: CDM Guidelines Cairo, January 12-13,
Ainārs Meņģelsons Public Utilities Commission Latvia 11th Baltic Energy Regional Initiative October 1, 2010 Jūrmala, Latvia ELECTRICITY REGIONAL INITIATIVE.
ENDA TM / CDM-PDD1 Analysis of a CDM-PDD illustrated by the El Gallo project Second Regional Workshop on CD4CDM August 2004 Maputo, Mozambique Dr.
CDM Project Cycle & Project Design Document Project Design Document First Extended & Regional Workshops CD4CDM Project Siem Reap, Cambodia March.
1 | Program Name or Ancillary Texteere.energy.gov Percheron Power, LLC’s Proof of Power Project on Potholes East Canal (POP ‐ PEC) 2011 Water Power project.
Phare 2003 Sector: Economic and Social Cohesion Title: Water Supply and sewerage in tourism and resort settlements.
Renewables Integration Development Project North West of the Island of Ireland Louis Fisher, EirGrid.
UPDATES ON THE LATEST DEVELOPMENTS IN LITHUANIA Aistija Zubaviciute National Control Commission for Prices and Energy 3 April 2007, Riga.
September 17, 2002 Van Jamison, POWAIR and Global Environment and Technology Foundation POLLUTION PREVENTION TEMPLATES WESTAR Technical Conference Snowbird,
UNEP Collaborating Centre on Energy and Environment Capacity Development for CDM - Egypt, Second National Workshop - Phase II - Cairo, January 2004.
El Gallo Hydroelectricity Project PDD Analysis
Guatemala: El Canada Hydroelectric Project Meth Panel decision on its proposed baseline methodologies May 2003.
1 PDD and PIN preparation Technical Workshop on CDM Paramaribo, 18 June 2008 Adriaan Korthuis.
ARK NET METERING LAW ALLOWS ELECTRIC CUSTOMERS TO INSTALL RENEWABLE ENERGY GENERATION EQUIP, CONNECT IT TO THE GRID, AND USE THE ELECTRICITY GENERATED.
Energy Scenario for the UK: NBS M016. A hydro scheme comprises a system for extracting energy from water as it moves, normally dropping from one elevation.
1 19 th World Energy Congress – 2004 Round Table 1 – Non Fossil Fuels: Will They Deliver? Jerson Kelman President, Brazilian Water Agency - ANA.
ACCESS TO THE GRID Vaida Tamašauskaitė Power System Planning Division Power System Development Department Lietuvos energija AB Ryga, 3 July, 2006.
1 Case study: Sofia District Heating Dr. Venkata R. Putti Team Leader, Carbon Finance Assist The World Bank Minsk / Belarus, March 2007.
Environmental Benefits of Renewable Portfolio Standards in an Age of Coal Plant Retirements September 10 th, 2015 Energy Policy Research Conference Denver,
CD for CDM - Second National Workshop on Baselines (Phase II) Cairo, March 31 & April 1, Capacity Development for CDM Cairo, March 31 & April 1,
Economic Assessment of Implementing the 10/20 Goals and Energy Efficiency Recommendations – Preliminary Results Prepared for : WRAP, AP2 Forum Prepared.
The Iowa Stored Energy Plant A Project Review and Update May 2005 Bob Haug, Executive Director Iowa Association of Municipal Utilities.
What’s happening in Spain? Access to the grid request of STE projects by Oct MW.
Update on the North Carolina Transmission Planning Collaborative January 30, 2007 For the North Carolina Utilities Commission and the North Carolina Public.
Introduction to the Project Cycle Jane Ebinger Senior Energy Specialist Sustainable Development Department The World Bank.
UNEP Collaborating Centre on Energy and Environment Use and Conceptualization of Power Sector Baselines: Methodology and Case Study from El Salvador Lasse.
1 SYMPOSIUM: U G A N D A A F T E R I D I A M I N A N D M I L T O N O B O T E Hamburg, Germany 29 th September 2008 INVESTMENT OPPORTUNITIES IN POWER GENERATION.
CDM Project Design Document CDM Project Design Document Training Course May 22, 2003 CCIC Conference Room Manila Observatory Ateneo de Manila University.
Challenges for Wind Farm Development in Bulgaria: The Environmental Aspect Case study: Saint Nikola Wind Farm, Kavarna April 2009.
sHPP VRŠUMA Draga, KO Draga, Tutin, SRBIJA -Business Plan-
OVERVIEW OF CDM GUIDELINES ON UNEP CDM Guidebook/E7 Guide
HPP USTIKOLINA Sarajevo, May 2017.
Presentation transcript:

Min Hydro-Egypt 1 Tunis, Sept 22-24, 2004 TIMS/EEAA Jerba-CDM-Investment-Forum UNEP RISOE / APEX EGYPT : Damietta Barrage Small Hydropower Project Eng. Maher Aziz Energy & Environmental Consultant

Min Hydro-Egypt 2 Tunis, Sept 22-24, 2004 TIMS/EEAA Jerba-CDM-Investment-Forum UNEP RISOE / APEXBackground Host Country:Egypt Host Country:Egypt Project Proponent:Hydro-Power Plants Executive Authority Project Sponsors:Ministry of Electricity & Energy (MOEE) Project Proponent:Hydro-Power Plants Executive Authority Project Sponsors:Ministry of Electricity & Energy (MOEE) Ministry of Irrigation & Water Resource Other Project Participants: (KfW) Ministry of Irrigation & Water Resource Other Project Participants: (KfW)

Min Hydro-Egypt 3 Tunis, Sept 22-24, 2004 TIMS/EEAA Jerba-CDM-Investment-Forum UNEP RISOE / APEX Technical description of the project activity The project’s purpose : it is the generation of electrical energy. The project would have a total investment cost (excluding customs and duties) of approximately € 28.6 to 29.8 million, depending on foundation conditions. Construction would take about two and a half years (30 months). The project’s purpose : it is the generation of electrical energy. The project would have a total investment cost (excluding customs and duties) of approximately € 28.6 to 29.8 million, depending on foundation conditions. Construction would take about two and a half years (30 months).

Min Hydro-Egypt 4 Tunis, Sept 22-24, 2004 TIMS/EEAA Jerba-CDM-Investment-Forum UNEP RISOE / APEX Technical description of the project activity (contd.) The project involves construction of a power plant within the river channel immediately downstream of the existing Damietta Barrage The project involves construction of a power plant within the river channel immediately downstream of the existing Damietta Barrage The installed capacity would be 13.0 MW, with actual hydropower generation rising from 81 GWh in 2010 to 84 GWh in 2017, as river flows increase. The installed capacity would be 13.0 MW, with actual hydropower generation rising from 81 GWh in 2010 to 84 GWh in 2017, as river flows increase.

Min Hydro-Egypt 5 Tunis, Sept 22-24, 2004 TIMS/EEAA Jerba-CDM-Investment-Forum UNEP RISOE / APEX Technical description of the project activity (contd.) The power generated would be supplied to the local grid by a 66 kV double circuit overhead transmission line running for about 450 m to a new 66 kV substation north of the WRC campus, and from there by a new 66 kV overhead line for some 300 m to an existing overhead 66 kV transmission line. The power generated would be supplied to the local grid by a 66 kV double circuit overhead transmission line running for about 450 m to a new 66 kV substation north of the WRC campus, and from there by a new 66 kV overhead line for some 300 m to an existing overhead 66 kV transmission line.

Min Hydro-Egypt 6 Tunis, Sept 22-24, 2004 TIMS/EEAA Jerba-CDM-Investment-Forum UNEP RISOE / APEX Estimated Annual Generation (year 2017)

Min Hydro-Egypt 7 Tunis, Sept 22-24, 2004 TIMS/EEAA Jerba-CDM-Investment-Forum UNEP RISOE / APEX Cost of Damietta Barrage Small Hydropower Project (1) Cost level 1st quarter 2003 (2) Excluding customs and duties

Min Hydro-Egypt 8 Tunis, Sept 22-24, 2004 TIMS/EEAA Jerba-CDM-Investment-Forum UNEP RISOE / APEX Technical description of the project activity (contd.) The construction time for the project is about 2.5 years, and the earliest year of construction is expected to be The earliest year of commissioning and operation of the project will be The construction time for the project is about 2.5 years, and the earliest year of construction is expected to be The earliest year of commissioning and operation of the project will be The environmental assessment carried our during the study considers that the project is regarded as addition to the existing barrage and its head pond, and no re-location of people is involved. The environmental assessment carried our during the study considers that the project is regarded as addition to the existing barrage and its head pond, and no re-location of people is involved.

Min Hydro-Egypt 9 Tunis, Sept 22-24, 2004 TIMS/EEAA Jerba-CDM-Investment-Forum UNEP RISOE / APEX Location of the project activity: Host country party(ies) :Egypt Host country party(ies) :Egypt Region:Qalyoubia Governorate Region:Qalyoubia Governorate City:Al-Qanater Al-Khairyy City:Al-Qanater Al-Khairyy The Damietta Barrage small hydropower project is located on the Nile river branche namely: Damitta branch at Qalyoubia Governorate The Damietta Barrage small hydropower project is located on the Nile river branche namely: Damitta branch at Qalyoubia Governorate

Min Hydro-Egypt 10 Tunis, Sept 22-24, 2004 TIMS/EEAA Jerba-CDM-Investment-Forum UNEP RISOE / APEX

Min Hydro-Egypt 11 Tunis, Sept 22-24, 2004 TIMS/EEAA Jerba-CDM-Investment-Forum UNEP RISOE / APEX Category: Category: “Renewable electricity generation in grid connected applications”. Technology: Technology: Bulb, directly coupled generator.

Min Hydro-Egypt 12 Tunis, Sept 22-24, 2004 TIMS/EEAA Jerba-CDM-Investment-Forum UNEP RISOE / APEX How GHGs are reduced : Applying the methodology described in section B.2, the project will generate an annual reduction of 47,058 tCO2 and a total reduction of 988,218 tCO2 over 21 years. Applying the methodology described in section B.2, the project will generate an annual reduction of 47,058 tCO2 and a total reduction of 988,218 tCO2 over 21 years.

Min Hydro-Egypt 13 Tunis, Sept 22-24, 2004 TIMS/EEAA Jerba-CDM-Investment-Forum UNEP RISOE / APEX Damietta Barrage Small Hydro-Power Project ERs Public funding of the project activity No public funding is provided for this Project.

Min Hydro-Egypt 14 Tunis, Sept 22-24, 2004 TIMS/EEAA Jerba-CDM-Investment-Forum UNEP RISOE / APEX Baseline methodology Methodology for ex post monitoring of electricity generation from the project and its impacts on emission from the operation and expansion of electric sector”. Methodology for ex post monitoring of electricity generation from the project and its impacts on emission from the operation and expansion of electric sector”.

Min Hydro-Egypt 15 Tunis, Sept 22-24, 2004 TIMS/EEAA Jerba-CDM-Investment-Forum UNEP RISOE / APEX Justification of Baseline Scenario The project type is not a common practice. The project type is not a common practice. The project type lacks priority within the planning scheme of the country. The project type lacks priority within the planning scheme of the country. Perceived technology risk. Perceived technology risk.

Min Hydro-Egypt 16 Tunis, Sept 22-24, 2004 TIMS/EEAA Jerba-CDM-Investment-Forum UNEP RISOE / APEX The outline of the method to calculate the ERs is as follows: Determination of baseline emission rate (as per section B3) (tCO 2 /MWh) Monitoring generation output from the Project (MWh) Calculation of ERs generated by the Project using the formula: Periodic annual electricity dispatched to the grid X baseline emission rate for this period (tCO 2 )

Min Hydro-Egypt 17 Tunis, Sept 22-24, 2004 TIMS/EEAA Jerba-CDM-Investment-Forum UNEP RISOE / APEX The net annual generation is estimated to be: 86,663 MWh The net annual generation is estimated to be: 86,663 MWh The baseline emission rate is: tCO2/MWh The baseline emission rate is: tCO2/MWh The net annual reductions are estimated to be: 47,058 tCO2 The net annual reductions are estimated to be: 47,058 tCO2 The net reductions over a 21-year crediting lifetime are estimated to be: 988,218 tCO2 The net reductions over a 21-year crediting lifetime are estimated to be: 988,218 tCO2

Min Hydro-Egypt 18 Tunis, Sept 22-24, 2004 TIMS/EEAA Jerba-CDM-Investment-Forum UNEP RISOE / APEX Environmental impacts The environmental assessment has concentrated on identifying environmental and social factors which might affect the project layout, design and cost. The environmental assessment has concentrated on identifying environmental and social factors which might affect the project layout, design and cost. A limited consultation process was carried out, appropriate to the level of detail of the study. Persons and organizations consulted are listed in the main documents. A limited consultation process was carried out, appropriate to the level of detail of the study. Persons and organizations consulted are listed in the main documents. The screening process carried out in this IEE has not identified any significant negative environmental impacts likely to be caused by the project. The screening process carried out in this IEE has not identified any significant negative environmental impacts likely to be caused by the project.

Min Hydro-Egypt 19 Tunis, Sept 22-24, 2004 TIMS/EEAA Jerba-CDM-Investment-Forum UNEP RISOE / APEX Stakeholders comments There have been consultations with the farmers downstream from the irrigation district who use the water stored in the Barrage. There have also been consultations with affected landowners along the route of the transmission line. There have been consultations with the farmers downstream from the irrigation district who use the water stored in the Barrage. There have also been consultations with affected landowners along the route of the transmission line. Most of the comments appreciate and welcome the project. Most of the comments appreciate and welcome the project.