Matt Disselkoen Amy Newland Jamison Vande Ree. Presentation Outline  Team Introduction  Project Background  Project Description  Project Constraints.

Slides:



Advertisements
Similar presentations
A method for addressing any large problem. Carefully consider the problem. Define the problem. Ask yourself the following questions: What is it that I.
Advertisements

Handover.
Corner Rounder Capstone Team Melissa Anders Andrew Dillon Joshua Schmidt Matt Kirtley Team Members: Faculty Advisor: Huafen Hu.
Team 3: TRIumph. TRIumph Team Members Matt Disselkoen, Amy Newland, Jamison Vande Ree.
Matt Disselkoen Amy Newland Jamison Vande Ree
Copyright 2006 Prentice-Hall, Inc. Essentials of Systems Analysis and Design Third Edition Joseph S. Valacich Joey F. George Jeffrey A. Hoffer Chapter.
Walker Renovation. Team Keen: Walker Renovation ME 493: Final Presentation 2006 Team Members: Natashia Baer Chelsea Stogsdill Sara Jennings Adam Abshire.
Professional Learning and Leadership Development Directorate Induction for School administrative and support staff and general assistants.
MARK BECKMAN JON BROCK ERIK VAN KAMPEN TYLER WIERS ATLAS|LIFT Team 8.
Preliminary Design Presentation CellSync Team 7. Who is Team 7? Phil Overbeeke Keith Conrad Jeffrey Enahoro Andrew Stutzman Matt Gardner Team 7 → Outline.
Brooke Buikema Stephen Gabbadon Hwok-Chuen Lee Mike Workman.
Modern Systems Analysis and Design Third Edition Chapter 11 Selecting the Best Alternative Design Strategy 11.1.
Academic Advisor: Prof. Ronen Brafman Team Members: Ran Isenberg Mirit Markovich Noa Aharon Alon Furman.
Copyright 2004 Prentice-Hall, Inc. Essentials of Systems Analysis and Design Second Edition Joseph S. Valacich Joey F. George Jeffrey A. Hoffer Chapter.
Starting a project 1 Starting a Project Where do we now start? Where are we going? Will we know when we arrive?
IE Job Description Steve Snelling Industrial Engineer/Process Engineer
The Outlook Help Desk System A very quick introduction.
Update on Palliative Care and POLST (Practitioner Orders for Life Sustaining Treatment) Amy Frieman, MD Medical Director, Palliative Care Services Meridian.
Optimization of the Microelectronics Fabrication Lab Process Abstract The laboratory component of the microelectronics fabrication class is an important.
Recommender Systems. >1,000,000,000 Finding Trusted Information How many cows in Texas?
Chapter 16 Structured Systems Analysis. Learning Objectives Know goals, plans, tasks, tools, & results of systems analysis Understand/appreciate costs.
The Financial Close Process: Implications for Future Research Discussant Remarks Elaine Mauldin UM 2013.
Ro-Mow Team 3. Team Members Nathan Terschak (EE), Dustin Brouwer (ME), Jordan Newhof (ME), Andy Frandsen (ME)
Objective Read World Uncertainty Analysis CMSC 2003 July Tim Nielsen Scott Sandwith.
Writing Report For The Industrial Project
CHAPTERS 2&3 Engineering Majors 1 ELEC 104, Fall 2010 Dr. McKinney.
Nameplate Inspection System May03-07 Team MemberEstimated Effort Ben Weatherman175 hours Jacob Powell175 hours Paul Slifka185 hours Dejan Leginovic190.
BredApp FIRST Delft Breda 3. Outline Background scenario What is BredApp First steps Tracking advancement Menu presentation Conclusions.
MDIC 1 George Serafin Deloitte & Touche LLP MDIC Open Forum Quality System Maturity Model Update.
TECHNICAL WRITING November 2 nd, Today Instruction style Procedures for Policy.
Options Analysis/ Selection & Combination Team 5.
Introduction to Engineering Camera Lab #4 – 3 Task #2 Agenda Review Task #2 procedure Conduct Task #2 Work on lab report.
11 ES1050 – Introductory Engineering Design and Innovation Studio Introduction to Design Process Customers’ Needs Product Design Specifications Sept. 23,
PARTS The train that never stop at station. Project Features Avoid the accident 100% Available technology For the traveling time consumption is less.
This is a personal evaluation that was carried out after the completion of my project one and two. The next slide shows the summary of the key points.
Goals/ Objectives Safe PortableAffordableEasy to use Reliabl e Score Safe***11114 Portable0***1001 Affordable00***000 Easy to use011***13 Reliable0110***2.
INNOVATION PODIUM. 12: :00 NEXT SESSION BAG FACTORY UNCOVERED BEUMER GROUP MIDDLE EAST Dirk Fransen, Director of BEUMER Innovation and Automation.
Copyright 2002 Prentice-Hall, Inc. Modern Systems Analysis and Design Third Edition Jeffrey A. Hoffer Joey F. George Joseph S. Valacich Chapter 11 Selecting.
Safety Seminar By Tom Warren. Presentation Outline  Introduction –About Tom –Presentation Overview  Basic Safety –Seat Belts/Liability  Vehicle Safety.
Likus Engineering Group Georgia Institute of Technology ME June 2000 Gwyneth Smith Philip Reale Matthew Berrell Justin Disney Lisa Smith Anthony.
EDGE™ Final Project Plan Presentation P09001 – RFID Reader & Active Tag Philip Davenport (Industrial and Systems Engineering)
Outline The quality imperative TQM Manufacturing perspectives Manufacturing strategy Lean and Six Sigma Summary 双语 PPT 2.
ME 4182 Mid-Term Presentation The Likus Group 6/21/00 Philip Reale, Group Leader Matt Berrell Justin Disney Anthony Godfrey Gwyneth Smith Lisa Smith The.
SIP6 Platform Updates Based on CNGI-CERNET2 Network Research Center Tsinghua University.
We make life safer Working towards Partnership Eddie Burrows Geoff Howsego FBU Brigade Chair HR Director Hampshire Fire & Rescue Service.
Profile of a Marketing Leader Tel.: (310)
1 SUMS Requirements Spot universal mote system Team Awesome.

PRR Activation Meeting
oyorooms-ixigo-clone-script/
Matt Disselkoen Amy Newland Jamison Vande Ree
Come and be a member of our website.
Team #5 - HotJac Problem Hardware Design Software Design Results
Manufacture of Hot Water and heating hire trailers
Exploring Family Studies
MAP-Works #allaboutYOU.
[insert Name of team here] [insert name of project here]
Improving Therapeutic Management of Huntington's Disease in Long-Term Care.
FEATURED TEAM: Food and Nutrition, Panorama City Medical Center How a contest can lead to safety WHAT THEY DO The department randomly divided into two.
Chapter 7 Selecting the Best Alternative Design Strategy
CEN 5035, Software Engineering
Building Capacity on Protected Areas Law & Governance
<Project Title>
The Design Team National 4/5 Design and Manufacture
Production Preparation Process (3P)
Wireless technologies on patient safety
TSS Data Documentation
Project Name TEAM MEMBER 1 NAME TEAM MEMBER 2 NAME TEAM MEMBER 3 NAME
Copyright 2005 Prentice- Hall, Inc.
Preparing for the future …
Presentation transcript:

Matt Disselkoen Amy Newland Jamison Vande Ree

Presentation Outline  Team Introduction  Project Background  Project Description  Project Constraints  Completed Tasks  Christian Perspective  Work Planned  Q & A

TRIumph Group Members Matt Disselkoen M.E., Amy Newland M.E., Jamison Vande Ree M.E.

Project Background  myTEAM TRIUMPH Angels and Captains  Two separate units Assembly issues Bulky  Triathlon transfer station

Current Designs Running ChairBike Trailer

Project Description  Combine ride-behind and push units  Aerodynamic and smooth  Improve connection joints  Improve weight capacity

Project Constraints  Safety – ADA standards  Lightweight  Collapsibility  Braking

Completed Tasks  Met with Lisa Staples, Logistics Director of myTEAM TRIUMPH Current design flaws Desired design improvements  Met with Glenn Remelts  Acquired and tested current design  Set up team website  Wrote PPFS Outline  Discussed various design alternatives

Christian Perspective  Caring myTEAM TRIUMPH  Justice Improve design for all persons involved  Trustworthy Reliable design features  Integrity Easy to use, performs intended functions

Planned Work  Meet with Terence Reuben, Medical & Equipment Director  Meet with industrial consultant  Update team website  Continue PPFS Report  Narrow down design alternatives

Questions?