F Romanelli 1 (19)2 December 2010 Overview of JET experiments and EFDA plans Francesco Romanelli EFDA Leader and JET Leader 2 December 2010.

Slides:



Advertisements
Similar presentations
EFDA during FP7 and the PWI TF J.Pamela EFDA Leader PWI Task Force meeting 13 November 2006.
Advertisements

Jerome Pamela PWI meeting, 31 October New Horizons for EFDA PWI meeting, October 2007 Jerome Pamela EFDA Leader.
Where are we in Integrated modeling? S. Jardin Mature 1½ D evolution code packages exist with reduced modules for most processes –Japan: BPSI: (TASK, TOPICS)
1 Nuclear Fission and Radiation Protection In FP6 Towards a new way of working Hans Forsström European Commission DG Research Directorate J, Unit 4: Nuclear.
Extension of IEA Implementing Agreement on Large Tokamak Facilities Presented to Committee on Energy Research Technologies October 18-19, 2005 Paris, France.
ASSOCIATION EURATOM HELLENIC REPUBLIC (and CYPRUS) (HELLAS) FOUNDATION FOR RESEARCH AND TECHNOLOGY-HELLAS NATIONAL CENTRE FOR SCIENTIFIC RESEARCH “DEMOKRITOS”
The Swiss Association vision for the period Presented by M. Q. Tran on behalf of the CRPP.
The Physics Base for ITER and DEMO Hartmut Zohm Max-Planck-Institut für Plasmaphysik, Garching, Germany EURATOM Association Hauptvortrag given at AKE DPG.
EFDA Fusion Roadmap Status of implementation Francesco Romanelli EFDA Leader.
A Roadmap to the realization of fusion energy Francesco Romanelli European Fusion Development Agreement EFDA Leader and JET Leader 17 May 2013 Acknoledgments:
1 st ITPA T&C Meeting, Milan, October WAHPage 1 ITER R&D Needs for Transport & Confinement W.A. Houlberg ITER Organization 1st ITPA Transport.
Summary and Closing Remarks Farrokh Najmabadi University of California San Diego Presentation to: ARIES Program Peer Review August 18, 2000 UC San Diego.
Burning Plasma Gap Between ITER and DEMO Dale Meade Fusion Innovation Research and Energy US-Japan Workshop Fusion Power Plants and Related Advanced Technologies.
Overview of Advanced Design White Paper Farrokh Najmabadi Virtual Laboratory for Technology Meeting June 23, 1998 OFES Headquarters, Germantown.
The current overall EU policy framework: Europe 2020 strategy, Innovation Union and Energy 2020 Strategy On March 2010, the Commission presented a Communication.
Broader Approach Activities toward Fusion DEMO Reactors IT/E-2 IAEA 21 st Fusion Energy Conference (Chengdu 17 th October, 2006 ) Shinzaburo Matsuda Japan.
EURATOM RESEARCH AND TRAINING ON NUCLEAR ENERGY 1.
Y. Sakamoto JAEA Japan-US Workshop on Fusion Power Plants and Related Technologies with participations from China and Korea February 26-28, 2013 at Kyoto.
Recent JET Experiments and Science Issues Jim Strachan PPPL Students seminar Feb. 14, 2005 JET is presently world’s largest tokamak, being ½ linear dimension.
Prof. F.Troyon“JET: A major scientific contribution...”25th JET Anniversary 20 May 2004 JET: A major scientific contribution to the conception and design.
M.E. Fenstermacher - Summary of Progress and Outlook for Work Plan in PEP ITPA WG on RMP ELM Control 4/23/09 11:15 PM 1 PEP ITPA Working Group on RMP ELM.
Toward a Credible EU Roadmap for Fusion International Workshop on MFE Roadmapping in the ITER Era Princeton University, September 2011 D. Maisonnier.
Nils P. Basse Plasma Science and Fusion Center Massachusetts Institute of Technology Cambridge, MA USA ABB seminar November 7th, 2005 Measurements.
Advanced Tokamak Plasmas and the Fusion Ignition Research Experiment Charles Kessel Princeton Plasma Physics Laboratory Spring APS, Philadelphia, 4/5/2003.
Status and Prospects of Nuclear Fusion Using Magnetic Confinement Hartmut Zohm Max-Planck-Institut für Plasmaphysik, Garching, Germany Invited Talk given.
Association EURATOM-Belgian State LPP-ERM/KMS SCK-CEN ULB M.Van Schoor, V.Massaut, D.Carati.
Page 1 of 11 An approach for the analysis of R&D needs and facilities for fusion energy ARIES “Next Step” Planning Meeting 3 April 2007 M. S. Tillack ?
Managed by UT-Battelle for the Department of Energy Stan Milora, ORNL Director Virtual Laboratory for Technology 20 th ANS Topical Meeting on the Technology.
Status of the ASDEX Upgrade Tokamak Programme Hartmut Zohm MPI für Plasmaphysik, EURATOM Association Joint Executive Committee session of IEA-IAs on Pol.
US ITER UFA Meeting APS-DPP Savannah, GA Ned Sauthoff (presented by Dale Meade) November 15, 2004 US In-kind Contributions and Starting Burning Plasma.
AES, ANL, Boeing, Columbia U., CTD, GA, GIT, LLNL, INEEL, MIT, ORNL, PPPL, SNL, SRS, UCLA, UCSD, UIIC, UWisc FIRE Collaboration FIRE.
EFDA EUROPEAN FUSION DEVELOPMENT AGREEMENT 16th TOFE Madison, Sept , EUROPEAN TECHNOLOGICAL EFFORT IN PREPARATION OF ITER CONSTRUCTION ROBERTO.
Discussions and Summary for Session 1 ‘Transport and Confinement in Burning Plasmas’ Yukitoshi MIURA JAERI Naka IEA Large Tokamak Workshop (W60) Burning.
1 Subprojects of IFERC K.Lackner (as Chair of IFERC Project Committee) Garching – 14 Apr 2011.
H. Bolt, Fast Track Concept in the European Fusion Programme Harald Bolt Max-Planck Institute for Plasma Physics, Garching EURATOM Association.
Workshop on EU fusion roadmap for FP8, Garching, April C. Cesarsky CCE-FU 1 Preparing the European fusion roadmap for FP8 and beyond.
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
1 1 by Dr. John Parmentola Senior Vice President Energy and Advanced Concepts Presented at the American Security Project Fusion Event June 5, 2012 The.
Integrated Modeling for Burning Plasmas Workshop (W60) on “Burning Plasma Physics and Simulation 4-5 July 2005, University Campus, Tarragona, Spain Under.
Programmatic issues to be studied in advance for the DEMO planning Date: February 2013 Place:Uji-campus, Kyoto Univ. Shinzaburo MATSUDA Kyoto Univ.
KIT Objectives in Fusion by 2020 Workshop on the European Fusion Roadmap for FP8 and beyond April 13 – 14, 2011; IPP Garching.
Introduction of 9th ITPA Meeting, Divertor & SOL and PEDESTAL Jiansheng Hu
FOM - Institute for Plasma Physics Rijnhuizen Association Euratom-FOM Diagnostics and Control for Burning Plasmas Discussion All of you.
Compact Stellarator Approach to DEMO J.F. Lyon for the US stellarator community FESAC Subcommittee Aug. 7, 2007.
EFDA EUROPEAN FUSION DEVELOPMENT AGREEMENT Task Force S1 J.Ongena 19th IAEA Fusion Energy Conference, Lyon Towards the realization on JET of an.
Robert Aymar’s 75th birthday celebration colloquium at CERN A. Grosman 1/ 25 1 Tore Supra : Physics, Technology… and Strategy André Grosman Institut de.
Workshop EU Fusion Roadmap April 13-15, 2011, Garching, Objective 1 STAC AHG Report on Objective 1: ITER construction Workshop EU Fusion Roadmap, April.
B WEYSSOW 2009 Coordinated research activities under European Fusion Development Agreement (addressing fuelling) Boris Weyssow EFDA-CSU Garching ITPA 2009.
Summary CDBM IMAGE meeting, 07 IMAGE SUMMARY IMAGE set up to provide a venue for discussion between the different Integrated Modelling (IM) activities.
PERSISTENT SURVEILLANCE FOR PIPELINE PROTECTION AND THREAT INTERDICTION International Plan for ELM Control Studies Presented by M.R. Wade (for A. Leonard)
VTT TECHNICAL RESEARCH CENTRE OF FINLAND VTT PROCESSES Tekes Contribution to European Fusion Roadmap Seppo Karttunen and Tuomas Tala VTT / Association.
EIROforumSchool on Instrumentation A. Murari May 2013, CERN. JET: the European Fusion Device Andrea Murari EFDA-JET Close Support Unit EIRO School.
Steady State Discharge Modeling for KSTAR C. Kessel Princeton Plasma Physics Laboratory US-Korea Workshop - KSTAR Collaborations, 5/19-20/2004.
Physics Analysis and Flexibility Issues for FIRE NSO PAC-2 Meeting January 17-18, 2001 S. C. Jardin with input from C.Kessel, J.Mandrekas, D.Meade, and.
Approach for a High Performance Fusion Power Source Pathway Dale Meade Fusion Innovation Research and Energy ARIES Team Meeting March 3-4, 2008 UCSD, San.
Comments on Fusion Development Strategy for the US S. Prager Princeton Plasma Physics Laboratory FPA Symposium.
045-05/rs PERSISTENT SURVEILLANCE FOR PIPELINE PROTECTION AND THREAT INTERDICTION Taming The Physics For Commercial Fusion Power Plants ARIES Team Meeting.
MCZ MCZ NCSX Mission Acquire the physics data needed to assess the attractiveness of compact stellarators; advance understanding.
Moving fast in fusion reactors: ASCOT – race track for fast ions
Integrated Modeling for Burning Plasmas Workshop (W60) on “Burning Plasma Physics and Simulation 4-5 July 2005, University Campus, Tarragona, Spain Under.
ITPA CDB&M and TP Topical Group Meetings, Lausanne, 7-10 May D Campbell ITER International Organization Acknowledgements: W Houlberg, V Mukhovatov,
Boundary Physics Breakout Session was a Good Start Breadth of topics: many issues pointed out in three plenary talks: pedestal, SOL/div/PFC, and technology,
JET Programme in preparation of ITER
FUSION IN THE EUROPEAN UNION
The European Power Plant Conceptual Study Overview
J. Menard for the MHD Science Focus Group Tuesday, November 22, 2005
L-H power threshold and ELM control techniques: experiments on MAST and JET Carlos Hidalgo EURATOM-CIEMAT Acknowledgments to: A. Kirk (MAST) European.
VLT Meeting, Washington DC, August 25, 2005
TWG goals, approach and outputs
Presentation transcript:

F Romanelli 1 (19)2 December 2010 Overview of JET experiments and EFDA plans Francesco Romanelli EFDA Leader and JET Leader 2 December 2010

F Romanelli 2 (19)2 December 2010 Outline Challenges of the ITER era Organization of the European Fusion programme Overall strategy EFDA activities and plans –JET –ITER Physics –Power Plant Physics and Technology Conclusions

F Romanelli 3 (19)2 December 2010 Challenges of the ITER era ITER preparation –A full scientific return must be obtained out of the investment in ITER. This requires an adequate preparation through the accompanying programme. The collaboration with the other ITER parties is sought. Power plant –The foundation for the Power Plant must be laid down now to make full use of the expertise arising from the ITER construction and allow a fast realization of fusion as energy source. Optimization of resources –Resources directed towards ITER construction mobilize between 450 and 700 ppy/y. Large impact on the individual Associations programme. This calls for an increased integrations of the EU Associations.

F Romanelli 4 (19)2 December 2010 European Fusion Development Agreement (EFDA) Agreement between all EU fusion labs and Euratom Coordinated research (physics in support to ITER, longer term technology) and JET Garching (D) and Culham(UK) Associations: European Fusion Laboratories associated to Euratom through “Contracts of Association” The overall fusion programme is coordinated in the frame of EURATOM Joint Undertaking for ITER “Fusion for Energy” (F4E) Domestic Agency to provide and manage EU contribution to ITER EU Contribution to Broader Approach Located in Spain (Barcelona) Organization of EU programme

F Romanelli 5 (19)2 December 2010 Collective use of JET (~60M€/y operation + ~5M€/y exploitation + enhancements) Coordination of focussed physics and technology activities (~5M€/y priority support mobilizing ~25M€/y) Training (goal ~ new trainee/y) EU contributions to international collaborations outside F4E All EU Laboratories/Institutions working on Fusion are parties to EFDA EFDA

F Romanelli 6 (19)2 December 2010 Overall research strategy Report of the CCE-FU Working Group on JET and the Accompanying Programm

F Romanelli 7 (19)2 December years objectives Secure ITER operations –Several robust, low risk, high performance operating scenarios for ITER that meet and in some cases exceed baseline requirements. At least some scenarios should be capable of long pulse operation, allowing an extrapolation to DEMO. –Capability/tools for accurate predictive modelling of ITER performance. These tools must integrate models of confinement, stability, energetic particle physics and wall interaction. Their validation should be prime programmatic objectives of the accompanying facilities. –Any satellite facilities that are necessary to support ITER operations. Prepare “Generation ITER” –A cadre of experienced machine operators and fusion scientists to form the core European presence on ITER. Lay the foundations for Fusion Power Plants –A conceptual DEMO design taking into account tokamak and stellarator options, including viable solutions for the physics questions that are vital for DEMO. –Proven concepts for power plant enabling and availability technologies, along with the appropriate test facilities for the qualification of these technologies and the materials needed for DEMO. –Understanding of stellarator stability, energy and fast particle confinement in view of reactor-relevant plasmas 10 years objectives achieved through the implementation of three EFDA activities –JET –ITER Physics –Power Plant Physics and Technologies (3PT)

F Romanelli 8 (19)2 December 2010 JET The JET programme is strongly focussed on the consolidation of the ITER design choices and the preparation of ITER operations. ITER-like Ion Cyclotron antenna ITER-like wall project High frequency pellet injector pellet

F Romanelli 9 (19)2 December 2010 JET capital investments A large investment (60M€ of industrial contracts) has been made to enhance JET capabilities that will fully come to fruition at the beginning of 2011 Original investment in and subsequent upgrades of the JET Facilities (M€ of year) Number of JET discharges with beam power >22MW I p [MA] Time [s] m -3 Joint Undertaking EFDA

F Romanelli 10 (19)2 December 2010 JET recent results Effect on confinement of toroidal magnetic field ripple assessed (unique JET capability). Normalized energy confinement time ρ* (inverse size) Ripple (%) Normalized energy confinement time High confinement in “hybrid” regimes extended towards ITER normalized Larmor radius Fractional ELM losses (%) Frequency (Hz) Different mitigation of Edge Localized Modes investigated and heat loads characterized in ITER relevant conditions

F Romanelli 11 (19)2 December 2010 ITER-like-wall ITER plans to install a Beryllium first wall and Tungsten divertor for the Tritium phase –This material mix has not been tested so far JET is the only machine that can use Beryllium and that can fully characterize plasma scenarios with ITER plasma facing materials. Can we install in ITER a W divertor from the beginning? ITER needs an answer by An ITER-like wall is being inserted in JET in 2010 In addition –Increase NB heating power from 20MW short pulse to 30MW long pulse (routine) –Improve control capability –Improve diagnostics ITER W CFC JET

F Romanelli 12 (19)2 December 2010 Reference Scenario Coherent approach in a multi-annual “JET programme in support of ITER” based on the full exploitation of the ITER –like-Wall 1. Experimentation with an ITER-like-Wall ( ) 2. Develop plasma scenarios approaching ITER relevant conditions (2013) 3. Integrated experimentation in deuterium-tritium ( ) J. Paméla, Fusion Engineering Design, 2007 Fusion Facilities Review, 2008

F Romanelli 13 (19)2 December 2010 Fusion power has been produced on JET 25MW of auxiliary power to heat the plasma

F Romanelli 14 (19)2 December 2010 Alternative scenario operation beyond 2015 After the test of the ITER-like wall and in parallel with DT operations JET can develop the ITER preparation by further enhancing its capabilities This scenario has been recommended by the 2008 Facility Review Panel. Two feasibility studies have been completed –A 10MW ECRH system for central H&CD and NTM control (in collaboration with Russia). –A set of Resonant Magnetic Perturbation coils for ELM control (in collaboration with US) Alternative scenario requires prolongation by at least three years of JET and substantial capital investment (~20M€ for RMP and ~ 50-55M€ for ECRH) This scenario is possible only with substantial contributions from International Collaborators.

F Romanelli 15 (19)2 December 2010 ITER Physics Integrated Tokamak Modelling –Aiming at achieving the 2011 project milestone corresponding to whole device modelling capability including comprehensive core- edge coupling and first principles elements. –Longer term aim is to produce a complete modelling platform and integrated modelling structure for fusion plasmas capable of full range whole device modelling as well as detailed physics studies employing a comprehensive range of validated physics models. –8 different projects: MHD equilibrium, stability&disruption, transport&discharge evolution, transport processes&microinstabilities, HCD&fast particles, ITER scenario modelling, atomic,molecular,nuclear&surface data, experimentalists&diagnosticians resource group, infrastructure and SW integration –Modelling effort presently receiving about 700k€ Priority Support (mobilizing resources for about 3.5M€) –High Performance Computing Facilities (100Tflop/s in Julich). New computer (1Pflop/s in Rokkasho) under Broader Approach to become available in 2012.

F Romanelli 16 (19)2 December 2010 ITER Physics Plasma Wall Interaction –6 Special Expert Working Groups: Fuel retention, fuel removal methods, dusts, erosion/transport and deposition, liquid PFCs, disruption mitigation and transient heat loads. –750M€ PS mobilizing about 3.8M€ resources Physics Topical Activities –Coordinated experiments in the area of MHD, Transport, HCD&F and Diagnostics MHD (MHD RT control, 3D fields and flows, fast particles) Transport (LH transition, turbulent electron/impurity transport, rotation, edge transport) HCD&F (reliability of ICRH, LHCD,ECRH/ECCD, rotation, fuelling) Diagnostics (burning plasma, PFCs protection, edge, new concepts, data analysis) –1100M€ PS mobilizing about 5.5M€ resources Satellite machine(s) –Preparation of the exploitation of JT60-SA –Assessment/design of a EU satellite machine following the outcome of the gap analysis for the Power Plant activities

F Romanelli 17 (19)2 December 2010 Power Plant Physics & Technology Definition of the design requirements, standards, design inputs, design rules including the physics basis for the design of a fusion power plant; Development of pre-conceptual design options for a fusion power plant including those associated with the stellarator line; Identification of the priorities for the R&D activities needed for the design of a fusion power plant and of the gaps in the programme (material development facilities, CTF, etc.); Execution of the R&D activities needed for the qualification of the relevant technologies for the construction of a fusion power plant; Conceptual design of a demonstration fusion power plant. The European obligations arising from the participation to the BA-IFERC project will remain responsibility of F4E.

F Romanelli 18 (19)2 December 2010 Power Plant Physics & Technology Workprogramme for 2011 under review by the EU Fusion Committees Material development (ODS, W&W alloys and SiC/SiC) and modelling mobilize about 3M€ of resources) The period will be mainly devoted to the selection and assessment of the system codes, the pre- conceptual design and the review of the R&D needs and the gaps in the programme. Sustained investment will be required on the time scale of FP8.

F Romanelli 19 (19)2 December 2010 Conclusions EFDA is supporting the EU fusion system to face the challenges of the ITER era. Two programmatic priorities –ITER preparation –Power Plant foundation Three areas of implementation –JET –ITER Physics –Power Plant Physics and Technology EFDA welcomes an increased collaboration with US laboratories

F Romanelli 20 (19)2 December 2010 Fusion Facility Review