WISDOM WP7 Dissemination & Exploitation Start M0, End M42 WP leader is CIP Objectives –Identification of potential groups of users of the developed technologies.

Slides:



Advertisements
Similar presentations
IEEE/FIPA WG Mobile Agents Ulrich Pinsdorf Fraunhofer-Institute IGD, Germany Dept. Security Technology
Advertisements

CIRAS PROJECT OVERVIEW
Sociedade Portuguesa de Inovação ChinaFrontier: China’s Realities from a Frontier Research Perspective Overall Objectives of the Project and a Summary.
Final Review Meeting – Brussels 22-April FP6 IST “Broadband for all” Network of Excellence Project e-Photon/ONe+ “Optical Networks: Towards.
INGAS General Assembly, Oulu, 25&26 May 2011 INGAS INtegrated GAS Powertrain 1 INGAS 30 months meeting Oulu, 25&26 of May 2011 General Assembly Coordinator.
Review Meeting – INSEAD, Fontainebleau – 30 March L 2 C Learning to Collaborate D5.1 Exploitation & Dissemination Plan (WP 5) Thanos Giamas, Metis.
1 Bertelsmann Foundation New ways of transferring knowledge to the library community New Ways Of Transferring Knowledge To The Library Scene Internet Librarian.
Errol Close Decarbonisation Policy and Co-ordination IWFA May Conference.
Network of Excellence “Dissemination & Awareness Strategy” meeting, Luxembourg February 2006 Dr Nozha Boujemaa INRIA Imedia, Paris MUSCLE NoE.
Virtual Collaborative Social Living Community for Elderly Kick Off Event WP 7 Plan 1 st period Inova+
All Hands Meeting DORII Deployment of Remote Instrumentation Infrastructure Norbert Meyer PSNC October 20, 2009, Garching.
TF-PR in Zagreb, Feb PR activities in the year 2007 Gabriela Krcmarova.
ANCIT WORKSHOP Torino March Access Network in EURESCOM Projects, and the P614 Project Umberto Ferrero CSELT (P614 Project Leader) Participants.
Network of Excellence in Internet Science 1 st Review meeting Brussels, 12th April 2013 FP7-ICT EINS WP13 Dissemination and Cooperation.
Workpackage 3 New security algorithm design ICS-FORTH Paris, 30 th June 2008.
ADAMANTIUM WP1 Project Management. ADAMANTIUM ICT – Started on March of 2008 Duration 30 Months Partners:  NCSR Demokritos, Greece  University.
Co-ordination & Harmonisation of Advanced e-Infrastructures Research Infrastructures – Grant Agreement n Regional progress report: Mediterranean.
Agenda TopicSpeaker Wednesday Coffee and welcome Project update over last 6 monthsGDM (general stuff, financials etc) Workpackage reviews, updates and.
1 INFRA : INFRA : Scientific Information Repository supporting FP7 “The views expressed in this presentation are those of the author.
CHINA’S PROJECTS PROPOSALS FOR SESSION 2 Sun Yang Department of International Cooperation National Energy Administration, China
WISDOM WP7 Dissemination & Exploitation Start M0, End M36 WP leader is CIP Objectives –Identification of potential groups of users of the developed technologies.
Network of Excellence in Internet Science Network of Excellence in Internet Science (EINS) 1 st REVIEW Brussels, 12th April 2013 FP7-ICT
National Workshop on ANSN Capacity Building IT modules OAP, Thailand 25 th – 27 th June 2013 KUNJEER Sameer B Briefing on centralized ANSN website.
Andrew McGettrick ACM Education Council Meeting Denver, CO March 2013 The Education Board and Education Council – an update on activity.
Overview BT’s contribution to WISDOM in 2 nd semester Dr Carla Di Cairano-Gilfedder BT GCTO Office, Research Department 4 th June 2006, Crete.
International Society for Photogrammetry and Remote Sensing ISPRS STUDENT CONSORTIUM -ISPRS SC- “Your Name, Relation with ISPRS SC, goes here:Exmple: Cemal.
Safety and health at work is everyone’s concern. It’s good for you. It’s good for business. CAMPAIGN PARTNERSHIP OFFER Healthy Workplaces Campaign
FP OntoGrid: Paving the way for Knowledgeable Grid Services and Systems Communication in the consortium Review meeting Delft,
WISDOM WP7 Dissemination & Exploitation Start M0, End M36 WP leader is CIP Objectives –Identification of potential groups of users of the developed technologies.
WP4 Progress Photonic Systems Group. 2Tyndall, Photonic Systems Group 3-Gate pattern recognition system SOA1 SOA2 Repeated data 10-40Gb/s Target pattern.
EU Project TEAM Communication Dr. Adam Jeff On behalf of Prof. Carsten Welsch and the Team.
Education...Discovery...Innovation...Achievement Fast Forward Growing Brand Identity and Global Recognition for the CPMT Society Potomac Communications.
European Commission DG Enterprise VIRTUAL ENVIRONMENT FOR INNOVATION MANAGEMENT TECHNIQUES VERITE Kick-off meeting Thessaloniki November 2001.
EMI INFSO-RI NA2 – Outreach and collaborations Status Report Emidio Giorgio (INFN Catania) Work Package Leader EMI First EC Review 22 June 2011,
LEONARDO TRANSFER OF INNOVATION PROJECT “MEDIA TECH: The future of media industry using innovative technologies ” No. LLP-LdV-ToI-11-CY Kick-off.
-1- Elias Athanasopoulos, ICS-FORTH Software Modeling WP3 Software Modelling WISDOM Simulator Elias Athanasopoulos*, Antonis Krithinakis, George Kopidakis.
Agenda TopicSpeaker Coffee and welcome Project update over last 6 monthsGDM (general stuff, financials etc) Workpackage updatesWorkpackage leaders Demonstrator.
INFSO-RI NA2 Status Update ETICS2 third AHM Isabel Matranga Engineering Ingegneria Informatica SpA Budapest, June 2009.
Why a co-ordination action about Enhanced Geothermal Systems ? P. Ledru & A. Genter Engine Launching Conference February 2006 Orléans, France Opening.
EuroRoadS A pan-European Road Data Solution Project within the eContent programme.
Progress Meeting WP4 status review Teleconference with GMV, GSA Konstandinos Diamandouros 16/12/2010 GNSS for INnovative road Applications.
Project planning for the last reporting period Presentation at 2nd COPRAS annual review, 15 March 2006, CEN/CENELEC meeting centre, Brussels John Ketchell.
Virtual Collaborative Social Living Community for Elderly Kick Off Event WP 7 – Dissemination, Exploitation Strategy and Standardization Inova+ Co-Living.
DataGrid is a project funded by the European Commission under contract IST rd EU Review – 19-20/02/2004 Work Package 11 Dissemination and.
WP5 – Wirespeed Photonic Firewall Validation Start M27, finish M35 Avanex lead Description of Work –Establish test bed suitable to validated the optical.
WP1- Management EuroVO-DCA 1 st PCT Meeting – 3&4 May 2007 Mathias DEPRETZ – EuroVO-DCA Project Manager 1 st PCT meeting 3&4 May 2007 Strasbourg EuroVO.
FP7-Infra : Design studies for European Research Infrastrutures 1st October 2011 – 31st December 2014 Duration 39 months – Periods : 2 (month.
G É ANT2 Development Support Activity and the Republic of Moldova 1st RENAM User Conference Chisinau, Republic of Moldova 14-May-2007 Valentino Cavalli.
IEEE Computer Society Nita Patel VP, Membership and Geographic Activities The community for technology leaders.
WISDOM meeting 29/01/07 Photonic Systems Group Tyndall National Institute R.J. Manning R.P. Webb, X.Yang, R. Giller Tyndall National Institute/University.
WP3 WISDOM SOFTWARE PACKAGE Elias Athanasopoulos FORTH Cork, Ireland, January 2009.
Enabling Networked Multimedia Group Communication TCT meeting - June 20-21st, Thessaloniki, Greece COST 264 Serge FDIDA
WISDOM WP6 Manufacturability, Scalability and Functionality Study Start M0, End M35 WP leader is CIP Objectives –Assessment of manufacturability of the.
Steering Committee Meeting, Bologna, 10th February 2006 e-PRODAT European Data Protection Best Practices in e-Government Services e-PRODAT European Data.
SciencePAD Open Software for Open Science Alberto Di Meglio – CERN.
WP5 – Wirespeed Photonic Firewall Validation Start M27, finish M41(tbc) CIP now lead Description of Work –Establish test bed suitable to validated the.
This project has received funding from the European Union’s Seventh Framework Programme for research, technological development and demonstration under.
Task Stakeholder engagement and communication Presentation of the task.
WISDOM Project (WP5/6) Martin Koyabe FORTH, Crete June 4-5 th 2009.
Review 1 st Periodic Report Project Overview – Administrative Issues 22 nd of June 2012 Miguel Seisdedos FOTsis Coordinator & WP5000 Leader Konstandinos.
CARPE DIEM 2 nd meeting Critical Assessment of available Radar Precipitation Estimation techniques and Development of Innovative approaches for Environmental.
WP 6: Analysis and evaluation Hans H. K. Andersen Cogain Kick-Off Tampere, Finland.
CRITICAL INFRASTRUCTURE RISK ASSESSMENT SUPPORT CIRAS PROJECT OVERVIEW 2nd Stakeholders’ Workshop Aschaffenburg, November, 26th, 2015 Jaime Martín, Project.
WP7 - Dissemination of Results & Exploitation
WP15- Dissemination & Exploitation INMARK
Year One: Project implementation overview
Dissemination Activities Report
Calliope-Louisa Sotiropoulou
8th Coordination Meeting th February, Heidelberg, Germany
Presentation transcript:

WISDOM WP7 Dissemination & Exploitation Start M0, End M42 WP leader is CIP Objectives –Identification of potential groups of users of the developed technologies and devices: target users groups. –Promote the WISDOM concept through the participation in the technical exhibition of major optical conferences and symposiums. –Prepare and distribute technical brochures. –Disseminate the scientific results by means of publications and presentations. –Establish a Web site

WISDOM WP7 Year 3 Overview to date –10 publications 9 conference (6 invited), 1 journal accepted –2 workshops –1 magazine article (Fibre Systems) –7 online articles –CIP exhibit at ECOC08 (Brussels), OFC09 (San Diego) & customer discussions –Audioconference with Crossbeam, meeting with Endace –Webpage hits ~ 30/day

Journal Publications R.P. Webb, X. Yang, R.J. Manning, G.D. Maxwell, A.J. Poustie, S. Lardenois and D. Cotter “All-Optical Binary Pattern Recognition at 42 Gb/s” Accepted for publication by IEEE J Lightwave Technol.

Conference Publications X. Yang, R.P. Webb, R.J. Manning, G. Maxwell, A. Poustie, S. Lardenois, “Demonstration of All-Optical Pattern Recognition at 42Gb/s” Invited paper We.2.C.1, ECOC 2008, September 2008 X. Yang, R.P. Webb, R.J. Manning, D. Cotter, G. Maxwell, A. Poustie, S. Lardenois “Application of Semiconductor Optical Amplifier Logic Gates in High-Speed All-Optical Pattern Recognition” Invited paper Tu.D1.3, ICTON 2008 (International Conference on Transparent Optical Networks), June 22-26, Athens, Greece A. Poustie “Hybrid Integration for Advanced Photonic Devices” Invited paper WeB1, ECIO 2008 (European Conference on Integrated Optics), Eindhoven, June 2008 A. Poustie “Hybrid Integration for Advanced Optical Processing Devices” Invited paper , APOC 2008 (Asia-Pacific Optical Communications), Hangzhou, China, October 2008 G. Maxwell “Hybrid Integration Technology for High Speed Optical Processing Devices” Invited paper C-16-AM2-2, COINS 2008 (7th Conference on Optical Internet), Tokyo, Japan, October 2008 A. Krithinakis, L. Stroetmann, E. Athanasopoulos, G. Kopidakis and E. P. Markatos “WSIM: A software platform to simulate all-optical security operations” Accepted for the 2nd European Conference on Computer Network Defence (EC2ND 2008,

Conference Publications R.P. Webb, X. Yang, R.J. Manning, G.D. Maxwell, A.J. Poustie, S. Lardenois and D. Cotter, “All optical header processing using semiconductor optical amplifiers” Invited paper, Frontiers in Optics 2009, San Jose, USA (2009). E. Athanasopoulos, A. Krithinakis, G. Kopidakis, G. Maxwell, A. Poustie, R. Manning, R. Webb, M. Koyabe, C. Di Cairano-Gilfedder, “WISDOM: Security-Aware Fibres” In Proceedings of the 2nd ACM European Workshop on System Security (EUROSEC). March 2009, Nuremberg, Germany. M.Koyabe and F. A. El-Moussa, “Steps towards a Clean-Slate Secure Internet Infrastructure”, Critical Infrastructure Conference (CRIS 2009) held at Linkoping University, Sweden, April 2009.

WISDOM Website Retaining # of hits Average hits ~30-40/day

WISDOM Statistics Large hit count correlated to online articles (zdnet on 2/11/08)

User Discussions BT/CIP audioconference with Crossbeam –October 1 st 2008 –Interested in seeing demonstrator –Martin to co-ordinate and keep in touch BT discussions with Endace –Jan 2009

IP Status Tyndall lapsed ‘pattern match’ patent as ongoing filing costs too expensive

Year 3 - Remaining Plans CIP exhibit booth at ECOC09 Further papers from continuing experimental work (UCC pattern match, CIP hybrid devices), from security algorithm perspective Continue to contact potential user groups as results become available/significant End of project demonstrator