Rocky Mountain Ranger District. A Brief History Current bridge was built in 1964, after floods washed out the previous bridge. Trail 110 has been recorded.

Slides:



Advertisements
Similar presentations
Note to presenters - This file is part of the FS Resources section at: This presentation should.
Advertisements

Buffalo Lake Dam Project Update date Meeting June 30, 2012.
Tour of Five Small Flood Control Dams in Iowa and Nebraska Rehabilitation Needs of Aging Small Flood Control Dams.
Supervision and Administration
South Canal Hydro Project Electric Fish Barrier 01 March 2013 by Jim Heneghan Renewable Energy Engineer Delta-Montrose Electric Association.
Facilities Management and Design Chapter 11 Building Structure, Finishes and Site.
Watershed Dams in Georgia 1. –357 Total –195 High Hazard (NRCS) –NRCS constructed – owned by local sponsors –Most built between 1950s-1970s for flood.
Bridge No over the Spokane River at State Line (looking south) 1 of 19.
Mordecai Lincoln Dam & Hunters Pond, Scituate, MA
U.S. 421 Bridge DES# Thursday, July 17, :30 p.m. Frankfort Community Public Library 208 West Clinton Street, Frankfort, IN.
Clinton Street Bridge over the Maumee River ODOT Project DEF December 2, 2014 Stakeholder’s Meeting.
Lessons Learned from Guy Wire and Anchor Replacement at Sequoyah Nuclear Plant by Doyle Pittman 12th NUMUG Meeting
 Project Delivery  Design Considerations  Lessons Learned.
1. 2 Briefing Purpose To provide an update of the existing condition of the Portsmouth Seawall and to indicate the status of future projects.
Environmental Considerations Location –Quarter mile stretch along the banks of the Mississippi river –Approximately 50 yards from the river bank.
Arch 04 UNIVERSITY OF MINHO 0 Daniel Oliveira & Paulo Lourenço U N I V E R S I T Y O F M I N H O Barcelona, November REPAIR OF STONE MASONRY.
Gauges and well logging
Temporary Works – What Needs to be Done
Spring 2013 Section Engineers Conference March 5, 2013 Guardrail Items Terry Chism, Div of Const.
I-Web Documentation Part VI – Work Items FACILITY CONDITION SURVEY TEAM Steve Oravetz PE, R1 (Team Leader) Bruce Crockett, R1 Randy Warbington PE, R8 Jim.
Avoiding a Dam Midlife Crisis 2011 NWHA Annual Conference Scott Larrondo—Idaho Power Company Manager, Power Plant Engineering & Construction.
Public Information Meeting Rehabilitation of Bridge No Flat Rock Hill Road over I-95 Old Lyme, Connecticut Rehabilitation of Bridge No Flat.
S.R. 49 Bridge Rehabilitation over Kankakee River Thursday, September 12, :30 p.m. Presentation Wheatfield Public Library Wheatfield, Indiana.
Lake Park North Lion Bridge Rehabilitation Milwaukee, Wisconsin Darrell Berry, PE, SE Approaches to Historic Bridge Rehabilitation Case Study #2 1.
EDMUND FINLEY TRISHA LOWE NICK MENCHEL ANNA SLEETER BOLIVIA BRIDGE: FINAL DESIGN.
Department of Natural Resources and Conservation, Water Resources Division State Water Projects Bureau Kevin B. Smith, P.E., Chief
Enosburg BRO 1448(40) Bridge 48 on TH 2 Over the Tyler Branch Alternatives Presentation.
1 Ministry of Transport, Public Works and Water Management.
St Johnsbury BF 7000(20) Bridge 6 on VT Route 2B over the Lamoille Valley Rail Trail Presenter: John Byatt, PE Consultant Project Manager.
STATE ROUTE 1 ALAMITOS BAY BRIDGE IMPROVEMENT PROJECT SCOPING MEETING AUGUST 5, :00 p.m.Open House 6:30 p.m.Presentation 7:00 p.m.Public Comment.
CALIFORNIA DEPARTMENT OF WATER RESOURCES Preparations for Flood Season DFM Flood Maintenance Office Presented By: Noel Lerner, Former Chief Flood.
Elmwood School Forest Property Recommendations Presented By Forestry and Wildlife Class
Beaver Dam Wash Bridge Project Introduction Nick Hont, P.E. Mohave County Flood Control District Engineer.
Standardizing Transportation Project Submittals to DNR Team Jim Doperalski WDNR Mike Halsted WDNR Janet Smith WisDOT Troy Stapelmann WisDOT Standard Submittal.
1 Four Proposals from Oconee County. 2 We are all unique and have different experiences and perspectives. **** Opportunities And Challenges.
State Road 5 over Eel River Bridge Rehabilitation DES# South Whitley Community Public Library Thursday, February 5, :30 p.m. Please silence.
Enosburg BRO 1448(40) Bridge 48 on TH 2 Over the Tyler Branch Public Information Meeting.
One Team: Relevant, Ready, Responsive, Reliable 1 Hannibal L/D Ohio River - Quoin Block Failure 110-ft x 1200-ft Main Lock Sep & Nov 2005 Pittsburgh District.
Capital Reserves. What are Capital Reserves? A separate account set up by the Association to fund large, non-annual repairs – Stormwater pond repair,
Cabrillo Boulevard Bridge Over Mission Creek Replacement COASTAL DEVELOPMENT PERMIT HEARING May 14, 2014 Agenda Item W 22B.
Our Trail Journey So Far and The Adventure Ahead.
There are 2 Types of Bridge Inspectors – Class B and Class A.
Prevention and Cure. Contents Introduction to Reservoirs Preventing Siltation Cure Cost Benefit Analysis Conclusion.
Maintenance of Structures Training of Trainer Personnel on Environmentally Sound Design and Implementation of Public Works- Community Roads of the Productive.
Kaufman-Van Zandt Soil and Water Conservation District Roy Deen Chairman.
FTA Real Estate March 26, 2014 Christopher S. Van Wyk Director FTA Environmental Office.
Conceptual Approaches for Short- and Long- Term Erosion and Sediment Control Big River State Park At Big River State Park, DPR and the State of California.
PRESENTED AND PREPARED BY CITY OF MISSOULA PUBLIC WORKS DEPARTMENT.
Documenting Self Inspections The City of Hendersonville Department of Public Works Erosion Control Self Inspection Form Power Point Presentation.
Four Mile Run Restoration Pre-Bid Meeting April 25, 2016.
SOUTH LAGUNA TUNNEL STABILIZATION & SEWER PIPELINE REPLACEMENT PROJECT Providing Quality Water & Wastewater Services To the Coastal Communities.
Rivanna Water & Sewer Authority Presentation to City of Charlottesville Workshop South Fork Rivanna Reservoir (SFRR) Dredging Concept Review May 6, 2008.
Brookeville Bypass Final Design Presentation Initech May 6, 2004.
8 th Grade Applied Technology Mr. Giannone. In this unit we will study structures and the forces that affect them.
Overview of USDA - PL-566 Small Watershed Program - EWP Program Mahoning County FRM Informational Meeting August 16, 2016 Natural Resources Conservation.
TITLE PAGE: Project Title
CIVI 6061-Strengthening of bridges using FRP
Replacement of Vehicle Bridge over Spring Creek
Seismic Design Impact to
Blatnik Bridge Management Study
Scoping for Performance-Based Solutions; CR E2 ACEC Conference March 5, 2012 Tom O’Keefe Metro District Program Delivery.
Transportation Alternatives (TA) Set-aside
Board of Commissioners Meeting
Toolbox talk on fire risk assessment by Marc Cork
Local Bridge Hydraulics 101 Planning & Funding Considerations
CIVIL WORKS CONSTRUCTION TECHNOLOGY 2017/18
Illinois Waterway 2020 Consolidated Closure
Monterey County Project Report for Measure X Expenditures
2013 Preconstruction Managers Meeting
Brunswick Maine Street Bridge Feasibility Study Preliminary Alternative Evaluation September 12, 2019.
Presentation transcript:

Rocky Mountain Ranger District

A Brief History Current bridge was built in 1964, after floods washed out the previous bridge. Trail 110 has been recorded as a linear historic site. The current bridge is not eligible as a historic structure.

What’s Wrong With The Bridge? Under designed for potential snow loads Sill beams are crushing Concrete abutments deteriorating Needle beams (deck supports) listing Deadmans (cable anchors) could mobilize

Needle Beams Concrete Abutments Sill Beams Deadman Anchors Cap Beams

What The USFS Has Been Doing For The Bridge In 2000 the caps were replaced. Annual inspections to ensure public safety. Water bars and check dams installed to prevent erosion around the deadmans. Fill hauled and deposited on approaches and over the deadmans. Surveyed and benchmarks set to determine listing. Started MRDG for the NEPA process.

The Process Minimum Required Decision Guide completed Public scoping E.A. or C.E selected based on comment content Alternative development and effects analysis Alternative selection

The Alternatives Repair the existing bridge Replace the current bridge with similarly designed bridge Replace the current bridge with modern design and materials Remove current bridge and construct ford No action

Repair Existing Bridge Rebuild to increase snow load tolerances and fix current deficiencies Likely would require the use of helicopter and onsite generator Bridge would need additional work in approximately 17 years ~ $130,000 initially, $75,000 additional after 17 years

Replace Current Bridge With Similarly Designed Bridge New structure of same style as the current bridge with increased snow load tolerances Likely would require helicopter transport and onsite generator ~ $266,000 with a 50 year lifespan

Replace Current Bridge With Modern Design And Materials New design chosen with consideration for matching the bridge with the natural surroundings Would require helicopter transport and onsite generator ~ $204,000 with 75 year lifespan

Remove Current Bridge And Construct Ford Removal of the current bridge without motorized assistance Ford constructed approximately 1/8 th mile downstream from bridge site. ~ $70,000 with minimum future maintenance

No Action Status quo, required Alternative for the analysis process Would require closing the bridge when it becomes unsafe for travel Constructing a nearby ford ~ $15,000

Ian Bardwell Rocky MTN R.D. P.O. Box 340 Choteau MT