Drift River Terminal - Emergency Flood Protection.

Slides:



Advertisements
Similar presentations
Ocean City Beachfill Ocean City, NJ Bureau of Coastal Engineering New Jersey Dept. of Environmental Protection Office of Engineering & Construction.
Advertisements

The pipeline stretches right across ALASKA from Prudhoe Bay in the north Passing Fairbanks in the middle and Valdez in the south.
Kenai Industry Outlook Forum
City of Fargo Mickelson Field Area Flood Risk Management – Project 5902 Public Information Meeting November 19, 2012.
2014 Industry Outlook Forum Cook Inlet Energy, LLC Operational Update.
Twin Cities Army Ammunition Plant 2007 Remedial Actions at TCAAP Site C Excavation/Stabilization/Disposal of Contaminated Soils, Placement of Soil Covers,
John H. Kerr Dam and Reservoir John H. Kerr Dam and Reservoir U.S. Army Corps of Engineers Wilmington District.
South Canal Hydro Project Electric Fish Barrier 01 March 2013 by Jim Heneghan Renewable Energy Engineer Delta-Montrose Electric Association.
Human- Environment Interaction North Africa and the Middle East.
Cameron Meadows Marsh Creation and Terracing (CS-66) Julia Wall, E.I. Engineering Division May 6, 2014 committed to our coast Coastal Protection and Restoration.
City of Fargo Mickelson Field Area Flood Risk Management – Project 5902 Public Information Meeting July 12, 2012.
Alaska Industrial Development and Export Authority Investing in Alaskans Alaska Broadband Taskforce Presentation| August 2012.
Composite Wrap for Non-leaking Pipeline Defects Lessons Learned from Natural Gas STAR Transmission Technology Transfer Workshop Duke Energy Gas Transmission,
Public Information Meeting #6 City of Fargo Flood Risk Reduction Projects Rose Creek Coulee October 9, 2012.
Industry Day May 6, Acres Semi-confined placement Pipe will be moved frequently No dewatering structures Marsh will be at different elevations.
Presentation to Barclay Owners November 21, 2013 Window Replacement Project Information Session.
Shell Island West NRDA Restoration
60°29’N 152°44’W 60°29’N 152°44’W 177 km SW of Anchorage 177 km SW of Anchorage few hundred kilometers from ½ of Alaska’s population) few hundred kilometers.
IMPROVING THE PERFORMANCE OF DIESEL ENGINE BASED EQUIPMENT IN ORDER TO DRAMATICALLY LOWER THE LIFE CYCLE COST OF OWNERSHIP Our company has many years experience.
Nunavut Water Board Public Meeting Water Licence Amendment Rankin Inlet 3AM-GRA-1015 January
Physical Flow: From Oil Field to Gas Pump. To obtain the oil we use, hundreds of billions of dollars worth of infrastructure are necessary.
OCEN 201 Introduction to Ocean & Coastal Engineering Introduction Jun Zhang
Potential Financial and Employment Impact from the Development of Oil & Gas in the North Aleutian Basin Shell Offshore Inc. Anchorage, Alaska October,
Drilling for Oil.
John Miller.  Purpose of Erosion/ Sediment Control Codes ◦ Promote Safety ◦ Preserve Property values ◦ Lessen burden on taxpayers for flood control ◦
Serving Builders and Homeowners. OVERVIEW Home Finishes (HF) is the evolution of a service concept launched in 1991 to help new homebuilders with late.
Bridge Building Timelines Presented by The Richland County Engineers Office Thomas E. Beck, PE, PS 77 North Mulberry Street Mansfield, Ohio Jan.
SELECTING THE BEST FOR SUPPLYING FROM WEST. Who we are TRANS ARK GROUP Trans Ark Procurement Design Service Training Offshore Expert Bureau Consulting.
Modeling Lahar Inundation With the Aid of Seismic Data at Redoubt Volcano, Alaska Alex Iezzi, Douglas Thompson, and Beverly Chomiak Connecticut College.
UK Offshore Wind April April UK Offshore Wind 2002 James May Director-General UKOOA.
Crude Oil and Ethanol by Rail: Reducing Risk and Improving Emergency Response.
Pipeline Projects October 24 th, 2006 Joey Purdy, Vice President Crude Oil Supply.
Kathleen Cole Sea Ice Program Leader National Weather Service Anchorage, Alaska for Sea Ice Workshop 19 September 2011 The “other” stuff we do…
Former DuPont Barksdale Works Project Update December 14, 2004 DuPont Corporate Remediation Group Great Lakes Visitors Center.
Heath Delzell – Engineering Bureau IDNR Engineering Progress to Date and Timeline for Project Completion Design and Construction Obstacles.
Riverside County Flood Control and Water Conservation District Murrieta Creek Flood Control, Environmental Restoration and Recreation Project June 2006.
Performance Reporting Presentation at the Pipeline Safety Trust’s “Restoring Trust in Pipeline Safety” Conference November 3, 2006 Lois N. Epstein, P.E.
Agenda... Overview: Tom Barrett, Alyeska President – What happened: Winter shutdown – extraordinary response – What we are doing… Reviewing pipeline reliability.
UNITED STATES ENVIRONMENTAL PROTECTION AGENCY FOSC Update Matt Carr Alaska Federal On-Scene Coordinator USEPA.
CE 366 PROJECT MANAGEMENT AND ECONOMICS Robert G. Batson, Ph.D., P.E. Professor of Construction Engineering The University of Alabama
AHPS support of the Interstate 131 S-Curve Project in Grand Rapids, Michigan Mark Walton Service Hydrologist WFO Grand Rapids, Michigan Mark Walton Service.
US Army Corps of Engineers BUILDING STRONG ® Mat Sinking Unit John W. Cross Commander, Vicksburg District March 2015 Exploring Redesign and Replacement.
February, Location Map South Central Rail Extension One Possible Rail Route.
C HARLOTTE C OUNTY B EACHES & S HORES A DVISORY C OMMITTEE J ANUARY 7, 2016 C HARLOTTE C OUNTY E ROSION C ONTROL P ROJECT U PDATE.
VOWTAP Progress Report VOWDA December 2, DOE Grants VOWTAP Extension No Cost Time Extension until May 31, 2016 Conditional upon achievement of two.
Dave Kemp, P.E., PMP State of Alaska Scott Davis, Kiewit Building Group Inc. Construction Manager / General Contractor.
FLUID POWER CONTROL ME604C. Extent of the Subject: FLUID POWER & CONTROL Some beautiful examples: 1...\video\Edited\Excavetor working.mp4..\video\Edited\Excavetor.
P. 143 You are a civil engineer who has been hired to oversee a large interstate-highway construction project connecting Pittsburgh with Cincinnati. Construction.
Senate Resources Committee & House Energy Committee Prepared by Alaska Energy Authority 1 /25/2011.
Advantages of Concrete & Core Drilling  Use core drilling procedure for improve accuracy and minimal labor cost.  Fast and therefore decrease labour.
Experience ∙ Innovation · Results CALCASIEU PARISH – SABINE RIVER AND BAYOU LACASSINE BASINS STORMWATER MASTER PLAN Engineers ∙ Surveyors · Environmental.
Company and family presentation – part 4 V-2009 (rev. VI-2012) (Part 00, PP 2007, animation+p/r : ) ready 1 Copyright notice Unauthorised copying.
AS DOT&PF is responsible for the planning and construction of public works, expect court facilities. Public Facilities or Public Works include.
Online Electronics Ltd.
1 AADE Operator’s Forum ConocoPhillips Alaska, Inc Outlook Randall Kanady Staff Drilling Engineer CPA Drilling and Wells.
2009 Sales Tax Extension Project Status Update. 2 Background Sales Tax was extended via August 26, 2008 referendum. Sales Tax was extended for an additional.
ALASKA’S OIL & GAS INDUSTRY
January 18, 2017 City of San Diego
MKKK 1653 SAFETY AND HEALTH IN CHEMICAL INDUSTRIES
Temporary Works – P8 Project Practice.
Big French Creek Slide Timeline of Events
Biological engineering and gabion constructions in coast protection
Physical Flow: From Oil Field to Gas Pump
PRE-BID MEETING ITB UNDP Design and Construction of a new medical warehouse in Bissau, Guinea Bissau 15th August 2017 Presented by Antoine Fadoul UNDP-
Project structure Overall objective is to assure sustainable use of natural resources and sustainability and resilience of ecosystems through the involvement.
Tracking time spent here with us today WO# Task code: 886
University of Alaska Fairbanks, Fairbanks, AK
Alaska Natural Gas Pipeline
Hawaii volcano lava flow
Public Works Standard Drawings Subcommittee Meeting
Presentation transcript:

Drift River Terminal - Emergency Flood Protection

Owner: Cook Inlet Pipeline Company Client: Jim Aldrich, Arctic Hydrologic Consultants Location: Drift River (Cook Inlet), Alaska Project Completion: 1990 PDC Involvement: Civil Engineering Construction Management Drift River Terminal Emergency Flood Protection The Redoubt Volcano began a four-month eruptive cycle on December 14, These eruptions caused glacial melting and flooding that threatened Cook Inlet Pipeline Company’s Drift River Terminal, which receives crude oil from the Cook Inlet platforms and transfers it to tankers via an offshore loading platform. Terminal operations would remain suspended until a flood protection dike could be constructed. The loss of jobs and revenue extended beyond the terminal to the oil platforms and the support industries. This costly disruption in operations meant a severe timeline was imposed for mobilization, construction, and completion of the project. PDC was responsible for the civil design and construction management of this fast track project, which installed approximately two miles of concrete armored earthen dikes and related drainage improvements. Construction of the dikes required 250,000 cubic yards (cy) of excavation, 300,000 cy of borrow, and 12,000 cy of pumped concrete revetment. The contractor was mobilized during preliminary design, and the majority of field data was gathered and the design finalized in the field as construction proceeded. The project was complete and oil flowing on schedule in August 1990, just six months from project inception. In January 1991, the National Society of Professional Engineers named this project as one of nine Outstanding Engineering Achievements in the United States during Anchorage: T: F: Fairbanks: T: F: