TECHNIQUES IN BASIC SURVEYING

Slides:



Advertisements
Similar presentations
Review Chapter 4.
Advertisements

2 Acute Angles and Right Triangle
Vectors and the Geometry of Space
TRAVERSING Computations.
Surveying Chain Surveying
Errors and Horizontal distance measurement
Distance Measuring.
ME 250: Design & Manufacturing I School of Mechanical Engineering
ENGINEERING SURVEYING & PHOTOGRAMMETRY CVE 314
Faculty of Applied Engineering and Urban Planning Civil Engineering Department First Semester 2010/2011 Surveying Chain Surveying Part I Lecture 4 - Week.
CS 128/ES Lecture 10a1 Surveying. CS 128/ES Lecture 10a2 Data for a GIS Raster data - characteristics? - sources? Vector data - characteristics?
Chemical Department. Guided by- prof D.M Prajapati. Prof. J. M. Jadav
Unit 2: Chain Surveying 25 November 08 Unit 2 :Chain Surveying.
Harry Williams, Cartography1 Surveying Techniques I. The USGS supplies 1:24,000 scale maps for all the U.S. But detailed topography at larger scales is.
Faculty of Engineering Technology
CHAPTER 2 CHAIN SURVEYING Tape Measurements
Chapter #1: Basics of Surveying
1.Meet B Parmar ( ) 2.Swapnil A Parmar ( ) 3.Pratik C Patel ( ) B.E- 2 SEM MECHANICAL ENGINEERING LINEAR MEASUREMENTS.
Islamic University of Gaza Civil Engineering Department Surveying II ECIV 2332 By Belal Almassri.
ANGLE AND DIRECTION MEASUREMENT
1 Area Calculations. 2 Introduction Determining the boundaries and size of an area is a common occurrence. Chemical spill Wet land Watershed Etc.  For.
Principles of Surveying
Distance Measuring. Two principles of measuring distance 1) It takes two points to form a line. 2) The shortest distance between two points is a straight.
EG1106: GI: a primer Field & Survey data collection 19 th November 2004.
Surveying I. Lecture 13. Tacheometry.
1 Area Calculations. 2 Introduction  Determining the size of an area is a common problem of landscaping. Application of chemicals Amount of sod Number.
Support the spread of “good practice” in generating, managing, analysing and communicating spatial information Compass Survey Part 1: Conducting a compass.
By: De’Aja Koontz 6 Th Period.  A member of the set of positive whole numbers {1, 2, 3,... }, negative whole numbers {-1, -2, -3,... }, and zero {0}.
Introduction and Vectors
STUDENTS NAMEID.NO.ENROLLMENT NO. MOD. JISHAN KHAN13PES NEEL SUTHAR13PES MILAN LAKHANI13PES GUJARAT TECHNOLOGICAL.
CLASSIFICATION OF SURVEYING
Surveying Techniques I. The USGS supplies 1:24,000 scale maps for all the U.S. But detailed topography at larger scales is rare and/or.
Coordinate Geometry and Traverse Surveying Faculty of Applied Engineering and Urban Planning Civil Engineering Department Lecture 8 - Week 5 2 nd Semester.
ERT247/4 GEOMATICS ENGINEERING
ELEMENTS OF CIVIL ENGINEERING (Subject Code )
MD : ATIKUL ISLAM JUNIOR INSTRACTOR DEPT. OF. CIVIL SUB: surveying3 SUB CODE : 6452 MOB:
TOPIC 5 TRAVERSING MS SITI KAMARIAH MD SA’AT LECTURER
CRIME SCENE SKETCHING PURPOSE
Geology and Surveying (Part B - Surveying) Distance Measurement.
ERT247/4 GEOMATICS ENGINEERING
Surveying 1 / Dr. Najeh Tamim CHAPTER 5 ANGLES, DIRECTIONS, AND ANGLE MEASURING EQUIPMENT.
INTRODUCTION TO SURVEYING
Topic : Theodolite Traversing
Civil Department. GROUP MEMBERS GROUP MEMBERS:- ENROLLMENT NO. NAME OF THE STUDENT BURHAN ADENWALA PRIYANK AGRAWAL TAMANNA.
Rampurwala Taher Z Panchal Deep S Shah Akash K Patel Apurv K Rathod Hardipsinh.
U.S. Coast & Geodetic Survey/NOAA Steps to Creating a Nautical Chart Historic types of surveys required – Astronomical Observations – Land survey (triangulation)
Copyright © 2009 Pearson Addison-Wesley Trigonometric Functions.
CIVIL DEPRATMENT.
Made by- Civil 3rd semester
The main object of shore line survey is to prepare a topographical map of the shore line.
Submitted By: Mon Alfred B. Cabia Submitted To: Roberto Cabrera.
Surveying 1A (SVG 105) PLANE TABLE SURVEYING
Visit for more Learning Resources
Properties of Triangles
Detail Surveys, Tacheometry, Total Stations
Geometry Final Vocabulary
Geometry Final Vocabulary
Rectangular Coordinates Level control in trenches
Angles and Directions.
Angles and Directions.
TACHEOMETRY.
Angles and Directions.
Surveying With Construction Applications, 7th Edition
Chapter #1: Basics of Surveying
Surveying I. Lecture 13. Tacheometry.
Revise No. 1.
Traversing.
Engineering Surveying Linear Survey
Geometry Final Vocabulary
Presentation transcript:

TECHNIQUES IN BASIC SURVEYING Patel Dixit K. (130400106054) Patel Dhruv P.(130400106051) Civil Engineering department Sankalchand Patel college of Engineering, Visnagar

Basic ideas Surveying - the creation of a scale representation of the ground surface - is a basic activity in many areas of environmental management. A survey will be one of of two types: Primary survey - to establish the position of objects in three dimensions when no previous information exists Secondary survey - to add extra information to existing data or to measure changes over an interval of time

Basic ideas Determining plan position Determining elevation The task of three dimensional position fixing is normally broken into two parts: Determining plan position Determining elevation

Basic ideas Each of these determinations may be either: absolute - made in terms of a fixed co-ordinate system relative - made in terms of local co-ordinates which may later be converted to absolute co- ordinates if required. The majority of surveys carried out for environmental management are thus secondary relative surveys

Plan Position Fixing The plan position of a station can be established in a number of ways:

By reference to the apparent positions of astronomical objects when viewed from that station This method gives the absolute location of the station in terms of latitude and longitude, which can be converted to local systems such as the National Grid.

By the measurement of the angles between lines of sight to the unknown station from other known positions By the intersection of lines of sight from the unknown station to other objects whose positions are already known These two methods both rely on the simple Euclidean geometry of the plane. (Hence the term plane surveying). The first procedure is termed triangulation and the second resection.

The basic principle of triangulation Measured angle Measured angle A B Baseline

The basic principle of resection Known position Known position Measured angle Unknown position Measured angle Measured angle Known position

By measurement of distances between the unknown station and other objects of known positions This last method includes a number of particular cases:

measurements of offset distances from a base line. trilateration - the distance equivalent of triangulation. tacheometry - an optical method of distance measurement along a known bearing

The basic principle of trilateration Measured side Measured side A B Baseline

Plane Surveying: Theory Plane surveying relies on the basic concepts of Euclidean geometry, and in particular the properties of triangles. The most important (for our purposes) of these are:

Plane Surveying: Theory The internal angles of a triangle sum to 180 The sides of an equilateral triangle are equal and the internal angles are all 60° The base angles and opposing sides of an isosceles triangle are equal

60º The equilateral triangle All sides equal in length All angles equal (= 60º) 60º 60º

The isosceles triangle Two sides equal in length Two angles equal a a

Plane Surveying: Theory If the respective angles in two triangles are equal then the triangles are similar and their sides are all in the same proportion If two triangles have two angles and one side equal (or vice versa) then they are congruent and all their other respective angles and sides are equal. Two triangles are also congruent if all their sides are equal.

Similar triangles have corresponding angles equal but are of differing size

Conguent triangles are identical two angles and one side equal two sides and one angle equal all three sides equal

Plane Surveying: Theory Congruent triangles are unique - you cannot draw two different triangles from the same set of measurements This means that a complete set of survey data must define the positions of objects uniquely.

Plane Surveying: Theory Any closed polygon can be subdivided into a series of contiguous triangles These properties are repeatedly used in the procedure of triangulation in which stations are surveyed in a pattern of contiguous triangles.

Any closed polygon can be subdivided into contiguous triangles These should be chosen to make as many of the triangles as close to equilateral as possible

Plane surveying: practical aspects In practice, most plane surveys are carried out in a straightforward way following an established sequence: 1. A reconnaisance survey will establish the dimensions of the area, relative levels, significant features, accessibility, obstacles etc

Plane surveying: practical aspects 2. Establish an accurate baseline by measurement from existing survey points, natural features, buildings etc. If none are available then the baseline must be fixed by absolute methods. 3. Establish as required any further control points by triangulation or trilateration from the base-line.

Plane surveying: practical aspects 4. Incorporate detail by tacheometry, traversing, tape & offset or whatever other method is appropriate. 5. The intermediate stations should where appropriate be cross-checked with the control points by resection and all traverses should be closed at a control point. 6. Inaccessible detail should be incorporated by triangulation or plane tabling from the ends of the baseline.

ILLUSTRATION OF THE USE OF OFFSETS Baseline

Plane surveying: practical aspects 7. If a topographic survey is being undertaken, levelling traverses should be carried out around the survey stations and the baseline tied to the local benchmark by a closed traverse. 8. The use of a theodolite or total station will enable both the position and the elevation of stations to be found simultaneously by combined tacheometry and triangulation or by trilateration

How to establish relative plan positions THE “CHAIN” SURVEY How to establish relative plan positions

Chain survey Simplest of all survey techniques Relies on linear measurements; slopes >3o require some adjustment to technique Usually requires a clear line of sight The triangles used should be equilateral or approximately so

Terminology Trilateration is the measurement of sides of a triangle whereas triangulation refers to the measurement of the angles of the triangle

Basic equipment Ranging poles Survey pegs and ‘arrows’ Chain & tape measure or other distance measuring instrument Plumb line Compass

Chain survey components Base line: the longest line Chain /survey lines Survey stations Offset lines

Order of events “Range out” survey stations with ranging rods Establish base line and measure accurately Measure remaining distances between other survey stations Measure offset lines whilst measuring between survey stations

Sloping ground If the ground slopes by more than about 3°, this must be allowed for in the survey. The measured distances are thus slant distances and must be corrected to true horizontal distances. This requires that the vertical angle between the stations is known

Ground distance determined X h a

Sloping ground For an approximate survey, it may be sufficient to step up or downhill using a series of horizontal and vertical lines If the drop is measured at the same time, some estimate of the slope profile can be obtained

Chain surveying (“stepping”) w b x c y z

Sloping ground If stepping is not appropriate, more sophisticated methods must be used to measure the slant distance and the vertical angle simultaneously Requires optical sighting equipment: usually either a clinometer, Abney level or theodolite

Basic levelling in chain surveys

Correcting for horizontal distance: the “hypotenusal allowance” correction factor = xy - yz = xy(1 - cosa) x h a y z