Mountain Pine Beetle Detection and Management in Alberta Ground Survey and Control Quality Inspection Procedures Course Revised 09/2011.

Slides:



Advertisements
Similar presentations
MICS4 Survey Design Workshop Multiple Indicator Cluster Surveys Survey Design Workshop Field Staff and Field Procedures.
Advertisements

WELLIGENT SPECIAL EDUCATION ASSESSMENT plan TRAINING
Royal Queensland Golf Club.  Players obtain a personalised competition card which contains details of the specific course in use, tee times, competition.
Access BDD Survey School
Culvert Inventory and Assessment Protocol 2015 Field Season.
Culvert Inventory and Assessment Protocol 2012 Field Season.
Lesson B3–2 Measuring Trees Next Generation Science / Common Core Standards Addressed! ·HSNQ.A.1 Use units as a way to understand problems and to guide.
DMVA Monthly Time Sheets Hit “Enter” or click your mouse to advance to the next screen.
Fiscal Monitoring Fiscal Monitoring. Agenda I. Fiscal Monitoring I. Fiscal Monitoring II. Follow-up II. Follow-up III. Correction Action Plan III. Correction.
Before Heading to the Field…  Decide how you will record the data  Test out data sheets –Look for obvious errors –Have crew try them out on pilot plots.
Cruising Approaches  Area Based Methods  Tree Based Methods.
WESTEST Examiner Training Prior to First Testing Session Attend WESTEST Training for Examiners Sign Test Security Agreement for Examiner and return.
TFACTS Private Provider Financial/Invoicing Overview 1.
INTERPRET MARKETING INFORMATION TO TEST HYPOTHESES AND/OR TO RESOLVE ISSUES. INDICATOR 3.05.
6.2.1: The Uses of a Clinometer
Competitive Grant Program: Year 2 Meeting 3. SPECIAL DIABETES PROGRAM FOR INDIANS Competitive Grant Program: Year 2 Meeting 3 Jeanne M. Amos HH Data Coordinator.
Maple Syrup in the Classroom Lesson 5 Tapping and Collecting Guidelines and Procedures.
Total Quality Management BUS 3 – 142 Statistics for Variables Week of Mar 14, 2011.
-Tutorial No. 1. Welcome to your first tutorial on how to use the HR TruCheck program. In this tutorial you will quickly learn how to login to HR TruCheck.
World Archery Judges’ Training Aid – May VENUE & FIELD LAYOUT.
Monitoring Requirements Virginia Department of Health Summer Food Service Program (SFSP) 2014.
Property Custodian Meeting July 10, Review of USM Internal Auditor Findings  Excerpt from the USM Internal Auditors report dated May 31, 2012:
Accuracy Assessment. 2 Because it is not practical to test every pixel in the classification image, a representative sample of reference points in the.
6S Simulation - K. Berry 1/29/ S Simulation.
UNIT 3C Security of Information. SECURITY OF INFORMATION Firms use passwords to prevent unauthorised access to computer files. They should be made up.
Packing and Shipping. COPYRIGHT ® 2012 OFFICE 1 SUPERSTORE Contents 1. Introduction 1. Introduction 2. Problems and.
Research, Evaluation and Accountability Test Coordinator’s Training Series Preparing Your School’s FCAT Retake Documents For Return.
Measures elevation or altitude Manually operated water pump for fighting forest fires.
Science Olympiad Summer Institute 1 Presented by Dennis Papesh
Page 1 Cost Approval RLM System. Page 2 Costing of Finished Goods Purchase Orders Finished Goods Purchase Orders (FGPOs) are the orders Jordache places.
FITA Judge Seminar – Bangkok 2010 VENUE & FIELD LAYOUT.
Encoding, Validation and Verification Chapter 1. Introduction This presentation covers the following: – Data encoding – Data validation – Data verification.
Preparing Your School’s FCAT SSS Documents For Return.
Support the spread of “good practice” in generating, managing, analysing and communicating spatial information Data collection for scale mapping Unit:
Florida Standards Assessments Paper-Based Materials SCHOOL COORDINATOR RETURN INSTUCTIONS.
ACCRETION QA/QC Protocols Dona Weifenbach, LDNR/CRD LFO Plot Layout Data Recording Data Entry Reporting Deliverables.
Chapter 2 Creating a Research Paper with References and Sources
Procurement Card Presented By: Denise Matias, CAH February 1, 2012.
Collection of Assessment Results
Rowland Unified School District (Slides from ETS) CAHSEE Test Site Coordinator Information.
BIM Bridge Inspection and Maintenance Technical Standards Branch Class B Bridge Inspection Course Inspection Policies and Procedures INSPECTION POLICIES.
Mountain Pine Beetle Detection and Management in Alberta Ground Survey Procedures Course Revised 11/2010.
Contract Training Class I
NTN FIELD LAB PROCEDURES  Weighing  Sample Conditions  Decanting  Shipping.
Multiple Indicator Cluster Surveys Regional Training Workshop I – Survey Design General Characteristics of MICS3 Questionnaires.
What is the Bio health of Skunk creek R.M. 0.1? Raymond Hoekstra Forks high school What is the bio health of skunkcreek at R.M. 0.1? If I test the macro.
1 NEW CLAIT 2006 OCR Level 1 Certificate/Diploma for IT Users.
Preparing Your School’s FCAT WRITING Folders For Return.
Week 1 Theory 2 B usiness I nformation S ystems Batch Processing Assignment 6 - Batch Processing 1 Batch Processing Method.
USGA Rules USGA Rules. Show Consideration to the Others.  No disturbance or distraction by moving, talking or making unnecessary noise.  On teeing ground,
1 Work Orders. 2 Generating a Work Order There are two methods to generating a Work Order in the WYNNE STSTEM. First method: Option 11 – 12 – 13 * Open.
Laboratory Safety, Safety is the highest priority Read the “Safety in the laboratory” section of the lab manual before you go to the lab this week. Safe.
Day 6: Supervisors’ Training This presentation has been supported by the U.S President’s Emergency Plan for AIDS Relief (PEPFAR) through the U.S. Agency.
IB Diploma Examinations May 2015 Final advice and explanation of conditions.
Updated for the 2016 Season. Agenda GRAL Handbook Personnel & Equipment Flow of Information Table Worker Duties.
Welcome and Good Morning!. CNS Dean’s Office Student Workshop 2014.
Sending Your Records to PARC A STEP-BY-STEP GUIDE FOR PACKING AND SHIPPING BOXES.
WIX Filters Fleet Sales Process 1. Wix….The Right Choice 2.
Copyright 2010, The World Bank Group. All Rights Reserved. Agricultural Census Sampling Frames and Sampling Section B 1.
I-9 Employment Verification REFRESHER Training
Revised by Human Resources
Establishing Plots.
Law 1 – The Field of Play Online Training Script:
Physical Inventory Training
Stick Together & Civil Structures
Presented By: Denise Matias, CAH February 1, 2012
Document Custodian of the Drop Safe Log
Insecticide Resistance: WHO Tube Tests
Work Folder Procedures
IEP REPORT OF PROGRESS AND ACHIEVEMENT K-12
Presentation transcript:

Mountain Pine Beetle Detection and Management in Alberta Ground Survey and Control Quality Inspection Procedures Course Revised 09/2011

Level 1 Ground Survey Quality Inspection Goal: 15% of all surveyed sites should be inspected for accuracy and quality of information. Inspectors should follow closely behind the crews to determine if there are any deficiencies in detection or plot layout - target maximum three day lag Follow-up may also be required on additional plots. Timing: While surveys and control operations are ongoing

Level 1 Ground Survey Quality Inspection List of Equipment GPS, compass, map Flagging tape (pink, red and yellow pest mgmt flagging) Black permanent marker, pencil Red pen/marker/pencil crayon Digital camera Knife/hatchet Copies of data sheets (printed copies of scanned originals) DBH tape Clinometer Topofil or tape measure

Level 1 Ground Survey Quality Inspection: Procedures GPS: –Set to NAD83 and –Collect data in degrees/minutes/decimal minutes

Level 1 Ground Survey Quality Inspection: Procedure QI should follow closely behind the crews to ensure inspections are distributed throughout each infestation, or as directed by the Project Manager. Hang yellow flagging tape at the plot centre with QI crew name and inspection date. Assign all applicable deficiencies to the plot. Quality Inspectors are to fix deficiencies in the parent plot during check and apply demerits accordingly.

Level 1 Ground Survey Quality Inspection: Procedure Hang yellow pest management flagging on tree, if applicable, with deficiency. –Indicate on flagging what the deficiency was –reflag the trees with the correct flagging if necessary Indicate deficiencies on the Survey Quality Inspection data sheet Correct the survey datasheet where necessary –Initial changes made to original survey data sheet –Use a colored pen/pencil to make the changes

Level 1 Ground Survey Quality Inspection: Header Information Complete header information

Level 1 Ground Survey Quality Inspection: Header Information Status: Circle the appropriate plot status: –In progress (plot survey is ongoing) –Complete (plot survey complete) –QI plots will almost always be ‘Complete’

Level 1 Ground Survey Quality Inspection: Survey Details Record if plot coordinates have to be corrected; also record positional accuracy of GPS Record if representative tree measurements have to be corrected

Level 1 Ground Survey Quality Inspection: Field Inaccuracies Missed Treatment Tree Missed a tree that meets the pink flagged thresholds (>40 entrance holes, >15cm) Double numbered and/or not tallied correctly (e.g. two trees of NW2, 12 trees in the forest, only 11 recorded on total of tally sheet) # of deficiencies = # occurrences 20

Excess Treatment Tree Tree is flagged pinked but does not meet threshold Tree tallied on data sheet but doesn’t exist in field Tree not tallied on data sheet but exists in field, and does not meet pink flag thresholds # deficiencies = # occurrences Level 1 Ground Survey Quality Inspection: Field Inaccuracies 1

Plot Center tree not to standard Infested tree as plot center No double ribbon Majority of plot located in non-pine area ( 15cm DBH) # deficiencies = # occurrences Level 1 Ground Survey Quality Inspection: Field Inaccuracies 2

Plot layout Plot layout ribbons in wrong locations (distance from plot centre) Plot layout flagging on infested tree # deficiencies = # occurrences Level 1 Ground Survey Quality Inspection: Field Inaccuracies 3

Incomplete coverage of survey area Be absolutely sure that surveyors have not checked whole plot regardless if missed pink flagged trees are found or not (i.e. no tracks in snow) Maximum one occurrence Level 1 Ground Survey Quality Inspection: Field Inaccuracies 1

Representative tree diameter/height inaccurate Measurements are outside of allowable error margins Maximum two occurrence Level 1 Ground Survey Quality Inspection: Field Inaccuracies 1

Representative tree not representative Broken top Gross misjudgement of rep tree selection Maximum one occurrence Level 1 Ground Survey Quality Inspection: Field Inaccuracies 1

Ribboning / Labelling error Missing or incorrect information on plot layout flagging (e.g., plot #, beetle year, direction, distance) max one occurrence per error type e.g. wrong beetle year on 9 plot layout ribbons = 1 occurrence Two trees of same tree number (# deficiencies = # occurrence i.e. 2 tree NW3 = 1 occurrence, 2 tree NW3 and 2 tree NW7 = 2 occurrences etc.) Missing tree number on flagging (# deficiencies = # occurrence) Skipped a tree number (NE3, NE5) (# deficiencies = # occurrence) Wrong ribbon colour used (maximum one occurrence) Level 1 Ground Survey Quality Inspection: Field Inaccuracies 3

Level 1 Ground Survey Quality Inspection: Plot Card Inaccuracies Form not filled out to standard or illegible Helipad or other forms of access not identified properly (i.e. is the access recorded? Does the record match the site?) GPS records given in the incorrect units Empty fields on the data sheet where there should be “0”s Surveyor writing illegible # deficiencies = # occurrence 5

Level 1 Ground Survey Quality Inspection: Plot Card Inaccuracies Field Map Did not map infested trees properly (location of dots when <10 trees) Did not map when they should have (less than 10 trees) Quadrant tally incorrect (but total number of trees correct) Did not map rep tree location on field map # deficiencies = # occurrence 2

Level 1 Ground Survey Quality Inspection: Plot Card Inaccuracies Incorrect plot centre coordinates (>+-15m) Maximum one occurrence Incorrect access coordinates (>+-15m) Maximum one occurrence 1 1

Level 1 Ground Survey Quality Inspection: Data Entry and Data Management Scanning and posting of cards (>24 hr) Database entry timeline (>24 hr) In progress sites not marked complete within 72 hrs Maximum one occurrence for each 1 1 1

Level 1 Ground Survey Quality Inspection: Data Entry and Data Management Data entry error FIRES data not matching data sheet # deficiencies = # occurrence

Level 1 Ground Survey Quality Inspection: Other Area of Concern Baits not collected and/or baited tree not re-flagged Maximum 2 occurrences Garbage located on site Maximum one occurrence Take photos If garbage deemed to be excessive, fine may be imposed by Conservation Officer by issuing a ticket 1 2

Level 1 Ground Survey Quality Inspection: Recommendation If applicable, check the relevant one of these 2 boxes: –No deficiencies (if no deficiencies found in the whole plot) –Follow up required if there are missed trees in the mini-survey triggering an additional plot to be surveyed, or the plot is at an incorrect location or the additional plot has been placed in an incorrect location.

Level 1 Ground Survey Quality Inspection: Comments Use to enter any other observations that are relevant to MPB ground surveys carried out –The more comments the better –Help surveyors understand calls in field –Help surveyors correct issues

Level 1 Ground Survey Quality Inspection When inspecting a plot it is better to assess all plot deficiencies and correct while in the plot This is more representative of the quality of work than if the surveyors are allowed to return to the plot and correct and then have it reassessed Only if it would take all day to fix plot would the surveyors be sent back

Level 1 Ground Survey Quality Inspection SRD designate may mark any additional plots for follow- up in FIRES based on poor QI assessments (e.g. completed by same crew, etc.). Although the plot marked for follow-up was not visited in the field, a QI assessment will be created with the comments indicating that follow-up is based on poor QI assessment on another plot (referenced) completed.

Level I Control Quality Inspection 1.Conventional Fall and Burn/Fall and Peel 2.Mechanical Fall and Burn 3.Rotary Wing Assisted Fall and Burn 4.Whole Tree Chipping

Quality Inspection for Conventional Fall and Burn / Fall and Peel Goal: 15% of all Level I control treatments must be inspected. Inspectors should follow closely behind the control crews to determine if there are any deficiencies in tree or stump treatments - target maximum three day lag Follow-up may also be required. Timing: While surveys and control operations are ongoing

QI for Conventional Fall & Burn / Peel List of Equipment GPS, compass, map Flagging tape (pink, red and yellow pest management flagging) Black permanent marker, pencil Red pen/marker/pencil crayon Digital camera Knife/hatchet Copies of data sheets Tape measure

Set GPS: –Set to NAD83 and –Collect data in degrees/minutes/decimal minutes QI should follow closely behind the crews to ensure inspections are distributed throughout each infestation, or as directed by the Project Manager. QI for Conventional Fall & Burn / Peel Procedure

Assess the plot and indicate deficiencies on the Control Quality Inspection data sheet Correct inefficiencies in plot where possible Correct Control datasheet if necessary with red pen QI for Conventional Fall & Burn / Peel Procedure

Complete the header information QI for Conventional Fall & Burn / Peel Header

–Indicate control type –Enter MPB site #, e.g. 4 QI for Conventional Fall & Burn / Peel Header

Treatment tree(s) not controlled to standard Pink flagged not felled, flown or controlled to standard Bark and cambium not completely destroyed (when burning) includes stump not treated above 30cm Bark still attached (when peeling) includes stump not treated above 30cm Debris from peeling not disposed of according to instructions from project manager Tree not controlled to a 10cm top QI for Conventional Fall & Burn / Peel Assesments

Record the number of pink flagged trees not controlled (missed) –Number of trees not felled (still standing) –Number of trees not flown if rotor-wing used –Number of trees not controlled (burned, chipped, etc.) Use comments field to provide details of deficiencies 22

QI for Conventional Fall & Burn / Peel Assesments Number of additional trees missed (+) or excess (-) 33

QI for Conventional Fall & Burn / Peel Assesments Number of stumps not treated properly 1 2

Other areas of concern Scorched tree not felled, limbed to lay flat, bucked into 8’ sections Incidental tree (> 10cm DBH) not limbed to lie flat or not bucked into 8’ sections Stump of treatment or incidental tree >30cm height Danger tree located on site or at burn pile location Stump of incidental tree not marked with a chainsaw “I” Garbage located on site QI for Conventional Fall & Burn / Peel Assesments

Check boxes for the listed deficiencies, as well as the number of occurrences on the Control Quality Inspection data sheet

Garbage found on site –Take photos to show garbage Fine not applied immediately If garbage deemed to be excessive, fine may be imposed by Conservation Officer by issuing a ticket QI for Conventional Fall & Burn / Peel Assesments 1

Data entry and data management Scanning and posting of cards (>24 hr) Database entry timeline (>24 hr) Data entry error In progress sites not marked complete within 72 hrs QI for Conventional Fall & Burn / Peel Assesments

Use to record comments and further explanation of why site failed –The more comments the better Level 1 Control Quality Inspection: QI Checklist

Check the box if the site had no deficiencies Mark the site for follow-up if –Treatment tree(s) not controlled to standard –Scorched tree not felled, limbed to lay flat, bucked into 8’ sections –Incidental tree (> 10cm DBH) not limbed to lie flat or not bucked into 8’ sections –Stump of treatment or incidental tree >30cm height Level 1 Control Quality Inspection: Recommendation

If there are any trees with current attacks that were not flagged by the survey crews, record the information on the Survey Quality Inspection data sheet, not on the Control Quality Inspection data sheet. Quality Inspection for Conventional F&B/P Assessments

Same assessments as for Conventional F&B or F&P for Treatment tree(s) not controlled to standard Data entry and data management Quality Inspection for Mechanical F&B

Other Areas of concern Same as Conventional Fall and Burn / Peel PLUS: Incidental tree outside the plot not limbed to lie flat or not bucked into 8’ sections Incidental tree (10cm dbh) within the plot not burned to a 10cm top Quality Inspection for Mechanical F&B

Ground Rule Standards Watercourse crossing not installed or removed as per ground rule standard Rutting or ground disturbance exceeds ground rule standard Area specific ground rules provided at start-up meeting Quality Inspection for Mechanical F&B

QI for Conventional Fall & Burn / Peel Assesments Check boxes for any of the listed deficiencies, as well as the number of occurrences Provide comments 1 1

Follow up control action or remedial work required if: Treatment tree(s) not controlled as per standard Scorched tree not felled, limbed to lay flat and bucked into 8’ sections Incidental trees not disposed of as per standard Watercourse crossing not installed or removed as per ground rule standard Rutting or ground disturbance exceeds ground rule standard Stump of treatment or incidental tree > 30cm height Quality Inspection for Mechanical F&B

Same assessments as for Conventional F&B or F&P: Treatment tree(s) not controlled to standard Other areas of concern Data entry and data management Follow up control required when: –Treatment tree(s) not controlled to standard –Standing scorched trees around the burn pile Quality Inspection for Rotary Wing Assisted Fall and Burn

Mark the site for follow-up if –Treatment tree(s) not controlled to standard –Scorched tree not felled, limbed to lay flat, bucked into 8’ sections –Incidental tree (> 10cm DBH) not limbed to lie flat or not bucked into 8’ sections –Stump of treatment or incidental tree >30cm height Quality Inspection for Rotary Wing Assisted Fall and Burn

Background Infested trees can be controlled by chipping them into small enough pieces that the number of surviving beetles, larvae or pupae is sufficiently reduced to prevent further infestation of healthy trees. Quality Inspection for Whole Tree Chipping

Goal At least 15% of all sites controlled by chipping infested trees should undergo Quality Inspection. QI should be conducted within the first three days of chipping commencement to ensure the standard is being met. QI should be conducted on a regular basis to ensure operators’ performance does not compromise the standard. Quality Inspection for Whole Tree Chipping

Equipment Datasheet Pencil Permanent Marker Disk 5.1cm (2 inches) in diameter or a screen* of 5.1cm Tape measure (at least 1m long) 4 liter bucket (for example, an ice cream pail) Plastic bags Calculator if necessary *Please note, the contractors are required to supply a screen as part of their contracts Quality Inspection for Whole Tree Chipping

Look over the entire site for large pieces that are larger than 24cm long and larger than 5.1cm in width with both bark and sapwood attached. If the site is very large, a smaller sampling area can be identified where the number of infested trees to be treated is known. Assess the large pieces for evidence of attack (pitch tubes, entrance holes, blue stain, or beetle life- stages). Quality Inspection for Whole Tree Chipping Procedure

If there is one piece with intact bark that is larger than 1m long and 5.1cm in width with evidence of attack, the site was not adequately treated. Quality Inspection for Whole Tree Chipping Procedure

If there are more than 5 pieces larger than 24cm in length and 5.1cm in width per tree, with intact bark and evidence of attack, the site was not adequately treated. Quality Inspection for Whole Tree Chipping Procedure

Gather two buckets of chips per tree. Sample at least 10% of the trees at a site. Scoop chips into a 4 litre bucket from random places of the chip pile. If the chips are spread over a large area and not in discrete piles, collect a representative sample of the chips from the entire site. Quality Inspection for Whole Tree Chipping Procedure

If using a screen with 5.1cm mesh size: Run the collected chips through the screen. Rotate the chips caught on the screen to allow all chips that fit through the holes to fall through. Count the number of chips with bark and sapwood attached that do not fall through the screen. Quality Inspection for Whole Tree Chipping Procedure

If using a disk 5.1cm in diameter: Compare all chips in the bucket with bark and sapwood attached with the disk. If the chip is larger than the disk, test whether it exceeds the size of the disk in two perpendicular directions (i.e. in width and length). Count the number of chips exceeding 5.1cm in both width and length. Average the number for all bucket samples. Quality Inspection for Whole Tree Chipping Procedure

Thresholds for acceptable treatment: –Holding Zone: 10 chips with bark and sapwood greater than 5.1cm in width and length –Leading Edge Zone: 5 chips with bark and sapwood greater than 5.1cm in width and length Quality Inspection for Whole Tree Chipping Procedure

If the average number of chips larger than 5.1cm exceeds the thresh­old, collect the chips that exceeded 5.1cm from each bucket and put them into a plastic bag. Label the bag with the site number and sample number, e.g Quality Inspection for Whole Tree Chipping Procedure

Pink flagged tree not felled or controlled to standard: Chips exceed size/quantity threshold (include comments) Stump untreated above 30cm Tree not controlled to a 10cm top Quality Inspection for Whole Tree Chipping Assessments

Use comments field to provide details of deficiencies Quality Inspection for Whole Tree Chipping Assessments 22

Other areas of concern Incidental tree (> 10cm DBH) not limbed to lie flat or not bucked into 8’ sections Stump of treatment or incidental tree >30cm height Danger tree located on site or at burn pile location Stump of incidental tree not marked with a chainsaw “I” Chip mat exceeds 10cm depth Garbage located on site Quality Inspection for Whole Tree Chipping Assessments

Ground Rule Standards Watercourse crossing not installed or removed as per ground rule standard Rutting or ground disturbance exceeds ground rule standard Area specific ground rules provided at start-up meeting Quality Inspection for Whole Tree Chipping Assessments

Data entry and data management Scanning and posting of cards (>24 hr) Database entry timeline (>24 hr) Data entry error In progress sites not marked complete within 72 hrs Quality Inspection for Whole Tree Chipping Assessments

Indicate deficiencies on the Control Quality Inspection data sheet. If there are any trees with current attacks that were not flagged by the survey crews, record the information on the Survey Quality Inspection data sheet, not on the Control Quality Inspection data sheet. Quality Inspection for Whole Tree Chipping Assessments

Follow up control action or remedial work required if: Treatment tree(s) not controlled as per standard Incidental trees (>10cm DBH) not limbed to lie flat or not bucked into 8’ sections Chip mat exceeds 10cm depth Watercourse crossing not installed or removed as per ground rule standard Rutting or ground disturbance exceeds ground rule standard Stump of treatment or incidental tree > 30cm height Quality Inspection for Whole Tree Chipping Assessments

Level 1 Quality Inspection: Performance Measures The acceptable tolerances for surveys are listed below –No penalty will be assessed if within these limits

Level 1 Quality Inspection: Datasheet corrections For both ground survey and control the datasheets must be corrected and reposted. –Make the changes on the original (printout of scanned original) –Use a colored pencil/marker –Repost the corrected datasheet Updated information must be entered into FIRES

Level 1 Quality Inspection: Database entry accuracy For both ground survey and control the FIRES database must be checked for database entry errors QI must ensure that the info on the tally cards matches the data in FIRES –15% data audit should be performed on the same sites as the ground checks –Keep spreadsheet on sites checked and changes made

Level 1 Quality Inspection For both ground survey and control, the 15% QI requirement must be completed during each pay period, not over the length of the contract.

Level 1 Quality Inspection Timelines Contract survey and control crews have 24 hours to enter the plot information. Control contractors have 72 hours from time of entry to change it from ‘In Progress’ to ‘Complete’ Can not QI until it is ‘Complete’ QI has until 3 days after the end of the pay period to check completed sites Transfer of files to SharePoint and entry into FIRES shall be completed within 24 hours of the inspection of the site

Level 1 Quality Inspection Communication with foreman or crew leaders is essential Must also ensure good communication with SRD contract manager

Level 1 Quality Inspection QI is a chance to improve the quality of the survey and control work being completed Beneficial to do joint inspections for first few days of contract to ensure surveyors/control crews and QI are on the same page DO NOT approach QI as a way to ‘stick it’ to contractors not working to standard