Connely Baldwin David Tarboton Utah Water Research Laboratory Utah State University The beginning of the end… How EDN 14 will contribute to the DSS.

Slides:



Advertisements
Similar presentations
Surface Water Quantity Model Development Connely Baldwin USU.
Advertisements

WEAP Water Evaluation & Planning System
AQUAREC Project Centre for Water Systems AQUAREC Project Centre for Water Systems D. Joksimovic.
Robert Goldstein Senior Technical Executive, Water & Ecosystems WSWC–WGA Energy–Water Nexus Workshop Denver, April 2, 2013 Water Prism: Decision Support.
TITLE OF PROJECT PROPOSAL NUMBER Principal Investigator PI’s Organization ESTCP Selection Meeting DATE.
Chapter 7 Structuring System Process Requirements
IDBM industry project Project Plan. Add text here giving a brief background of the project Project Background.
Requirements Engineering n Elicit requirements from customer  Information and control needs, product function and behavior, overall product performance,
Copyright 2002 Prentice-Hall, Inc. Chapter 1 The Systems Development Environment 1.1 Modern Systems Analysis and Design Third Edition Jeffrey A. Hoffer.
Regional Climate Change Water Supply Planning Tools for Central Puget Sound Austin Polebitski and Richard Palmer Department of Civil and Environmental.
Needs Assessment April 5 th 2006 Geog 463: GIS Workshop.
1 CS 430 / INFO 430 Information Retrieval Lecture 24 Usability 2.
Copyright 2004 Prentice-Hall, Inc. Essentials of Systems Analysis and Design Second Edition Joseph S. Valacich Joey F. George Jeffrey A. Hoffer Chapter.
DoW text: Task and WP leaders will prepare syntheses reports of the project progress, its results and its implications. These synthesis reports will be.
Enterprise Architecture
Chapter 7 Structuring System Process Requirements
Green River Water Rights Distribution Model (MODSIM) Update By Division of Water Rights
Chapter 7: The Object-Oriented Approach to Requirements
The BIM Project Execution Planning Procedure
Chapter 6: The Traditional Approach to Requirements
Copyright 2001 Prentice-Hall, Inc. Essentials of Systems Analysis and Design Joseph S. Valacich Joey F. George Jeffrey A. Hoffer Chapter 1 The Systems.
What is Business Analysis Planning & Monitoring?
Harnessing the Power of Environmental Data for Decision-Making IABIN Phase II.
AICT5 – eProject Project Planning for ICT. Process Centre receives Scenario Group Work Scenario on website in October Assessment Window Individual Work.
Integrated Water Management Modeling Framework in Nebraska Association of Western State Engineers Spring Workshop Salt Lake City, Utah June 9, 2015 Mahesh.
Demands, Supplies & Priorities. Demand Sectors Irrigation Livestock Mining Industrial Commercial Ecosystems Domestic Total Water Demand Major Cities.
FAEIS Project User Opinion Survey 2005 Thursday, June 23, 2005 Washington, D.C. H. Dean SutphinYasamin Miller ProfessorDirector, SRI Agriculture & Extension.
Copyright 2002 Prentice-Hall, Inc. Chapter 1 The Systems Development Environment 1.1 Modern Systems Analysis and Design.
Chapter 7 Structuring System Process Requirements
Copyright 2002 Prentice-Hall, Inc. Chapter 1 The Systems Development Environment 1.1 Modern Systems Analysis and Design Third Edition Jeffrey A. Hoffer.
An Online Knowledge Base for Sustainable Military Facilities & Infrastructure Dr. Annie R. Pearce, Branch Head Sustainable Facilities & Infrastructure.
Georgia’s Water Plan June 17, /09/08 Page 2 Agenda Plan Development Plan Overview.
Engineering System Design
Creating a Shared Vision Model. What is a Shared Vision Model? A “Shared Vision” model is a collective view of a water resources system developed by managers.
Overview of WEAP. Water Evaluation and Planning System WEAP A generic, object-oriented, programmable, integrated water resources management modelling.
Key Takeaway Points A use case is a business process; it begins with an actor, ends with the actor, and accomplishes a business task for the actor. Use.
DEQ Water Supply Planning Integrating Monitoring, Modeling, and Scientific Study with Adaptive Management and Planning.
Introduction A GENERAL MODEL OF SYSTEM OPTIMIZATION.
Copyright 2002 Prentice-Hall, Inc. 1.1 Modern Systems Analysis and Design Jeffrey A. Hoffer Joey F. George Joseph S. Valacich Chapter 1 The Systems Development.
An Adaptive Management Model for the Red River Basin of the North.
Introduction to ArcGIS for Environmental Scientists Module 3 – GIS Analysis Model Builder.
Analytic Vs Numeric Ground Water Models Ray R. Bennett, PE Colorado Division of Water Resources.
South Platte Decision Support System Colorado Water Conservation Board and Division of Water Resources.
SOFTWARE PROJECT MANAGEMENT
Software Requirements: A More Rigorous Look 1. Features and Use Cases at a High Level of Abstraction  Helps to better understand the main characteristics.
Central Valley Project Cost Allocation Study -- Irrigation and Municipal & Industrial (M&I) Benefits Public Meeting August 9, 2013.
WATER MARKETS IN WASHINGTON Presented by: Eugene N.J. St.Godard, P.G., C.HG. Principal Hydrogeologist/Owner Water & Natural Resource Group P.O. Box 28755,
SEAMLESS: Demo Version 1.4 “Presenting current developments and welcoming your feedback” For contact:
Chapter 7 Structuring System Process Requirements Modern Systems Analysis and Design Fourth Edition Jeffrey A. Hoffer Joey F. George Joseph S. Valacich.
Foundations of Geospatial System Development Todd S. Bacastow Professor of Practice for Geospatial Intelligence John A. Dutton e-Education Institute The.
Surface Water Surface runoff - Precipitation or snowmelt which moves across the land surface ultimately channelizing into streams or rivers or discharging.
Unit – I Presentation. Unit – 1 (Introduction to Software Project management) Definition:-  Software project management is the art and science of planning.
NEM201 Week 4 Project Plan Create and complete outstanding items. 01. Front Cover 02. Document details 03. Scope Document 04. Technical Design 05. Creative.
© 2005 by Prentice Hall Chapter 7 Structuring System Process Requirements Modern Systems Analysis and Design Fourth Edition Jeffrey A. Hoffer Joey F. George.
Chapter 7 Part II Structuring System Process Requirements MIS 215 System Analysis and Design.
Session 2: Developing a Comprehensive M&E Work Plan.
Develop Schedule is the Process of analyzing activity sequences, durations, resource requirements, and schedule constraints to create the project schedule.
Modeling with WEAP University of Utah Hydroinformatics - Fall 2015.
Develop Schedule is the Process of analyzing activity sequences, durations, resource requirements, and schedule constraints to create the project schedule.
MENU PLANNING AND DEVELOPMENT (HTF255)
Creating a Work Breakdown Structure with Microsoft Project.
EIAScreening6(Gajaseni, 2007)1 II. Scoping. EIAScreening6(Gajaseni, 2007)2 Scoping Definition: is a process of interaction between the interested public,
Principal Investigator ESTCP Selection Meeting
Steven Burian and Erfan Goharian Hydroinformatics Fall 2013
Principal Investigator ESTCP Selection Meeting
How to automatise the grid production - using model builder in ArcGIS
Hydrologic Simulation Models
WATER POLICY And Management in AlabamA
AICT5 – eProject Project Planning for ICT
Presentation transcript:

Connely Baldwin David Tarboton Utah Water Research Laboratory Utah State University The beginning of the end… How EDN 14 will contribute to the DSS

Outline n Purpose n Context n DSS Worksheet Synopsis n EDN 14 – Surface Water Quantity Model Development Tasks n DSS details – the first iteration n Discussion

Purpose for EDN14 n Clarify model-to-model and model-to-data interactions for the surface water quantity components of the Nooksack DSS n Clarify the form of outputs required from the surface water quantity components of the Nooksack DSS n Clarify the format for specification of decision alternatives to the surface water quantity modeling components

Context n This is a stakeholder driven process n DSS worksheets provided a structured communication of issues at stake in WRIA1 n The outcome DSS should be a modeling and data visualization system that presents information relevant to most important decision issues

DSS worksheet synopsis n The worksheets served to define: –Possible management alternatives –Indicator variables (for decision making) –Spatial scale –Temporal scale –Overall period of simulation

DSS Worksheet Synopsis Management Alternative Categories n Diversions n Land Use/Land Cover n Water Rights and Ecological Flows n Storage n External Influences n Others (conservation, institutional)

DSS Worksheet Synopsis – An intriguing quotation n Background Conditions: “Years of inattention to baseline information gathering and water resource issues, citizen complacency, citizen investments based upon lack of enforcement and the private wells exemption lasting forever”

DSS Worksheet Synopsis- Specific issues  Lynden North - Includes Kamm Slough, Fishtrap and Bertrand Creek drainages. Lynden North has a substantial number of water right applications and potential unpermitted water rights, transboundary issues, stream flows that do not meet legally established flows, and nitrate concerns.  Sumas watershed – Give analytical attention to both surface and groundwater quantity constraints for current and future uses.  Fraser River – The Fraser River drainage area is open for additional withdrawals and as such represents a potential area to look for solutions.  South Fork – The South Fork routinely experiences stream flows that do not meet legally established flows and initial examination indicates that this is not due to consumptive withdrawals.  Lake Whatcom/Middle Fork – The City of Bellingham obtains water from Lake Whatcom and the Middle Fork drainages. The City water supply may be a possible source of water for other areas of the WRIA. Agriculture in general – respond to concerns about impact on instream flows/changing from surface water to ground water withdrawals (distance to stream)

DSS Worksheet Synopsis- Specific issues  Agricultural lowland areas – Water conservation and reuse. Water rights implications for conserved water. Also, areas with potential supplies of water that could be reused (i.e., municipal or industrial waster water treatment facilities) would be likely focus areas.  General – Appropriateness of 1985 IRPP Instream Flow Settings (e.g., South Fork).  … refined information for all drainages of the mainstem of the Nooksack (below the forks) and aggregated information above.  Hydraulic Continuity – Extent to which ground water withdrawals impact surface water flows needs to be determined to appropriately understand the physical availability of water.  One-molecule rule – need to develop an agreed-upon pragmatic standard that can be applied realistically in making water allocation decisions within WRIA 1. Middle Fork Diversion – Optimal management Over-allocated drainages – ASR/Storage/Conservation/Reuse

DSS Worksheet Synopsis – Model Output Needs n Temporal and spatial variability of streamflow n Focus on low flow periods n Water rights fulfillment n Flow Duration curves by period n GW level n Baseflow contribution

EDN 14 : Preliminary Surface Water Quantity Model Development n An iterative and collaborative process with involvement by YOU in a team environment n Tasks 1.Design of model-to-model and model-to-data interactions 2.Implementation of DSS design using placeholder models.

Task 1 Model-to-model and model-to-data interactions Phase II and the DSS worksheets have provided documentation of the issues that need to be addressed by the DSS and the data available. It has also reviewed available modeling methodologies. The next step in developing the DSS is to define the model components, inputs, outputs and interactions. This demands definition of standardized interactions between models, e.g., how the surface water quantity model is linked to models from other related components. The inputs to and outputs from each model component need to be specified precisely in terms of location, scale and resolution. Deliverable An information flow diagram and accompanying text specifying the functionality of each model component.

Task 2 Strawman implementation using placeholder models Some key issues in DSS development are best accomplished by building a working strawman DSS. These include graphical user interface design, database functionality, and presentation of the output. This task will build on the database design and visualization that is already part of the Water Quality data viewer. These interface items are nearly equal in importance to the development of rigorous underlying models. However, if these issues are only fully dealt with after the models are developed, there is significant risk of a less-than-optimal DSS. This can be avoided by implementing the design of Task 1 using “placeholder” models that provide the same output as the full model, but with extremely simplified methods. For example, the surface water quantity model would be a simple runoff coefficient model where runoff is defined as a constant fraction of rainfall. The same methods and input data would be used, but the model could be quickly implemented to define and test model-model interactions, and usability and format of model outputs. Deliverable A “strawman” surface water quantity DSS following the design of Task 1 comprising a suite of placeholder models to test the user interface and output functionality.

DSS – underlying structure DSS data, simulations and alternative specifications Data editing and importing tools Alternative builder Model component A (e.g. streamflow) Model component B (e.g. groundwater) Data viewer Decision maker and analyst

DSS – Detail on Components n Data Viewer (Similar to Water Quality Demo) –Produce high level watershed characterization summaries –View Historical Data –View Model Output (Fine Detail) n Alternative Builder –Change Diversions/Storage Options –Modify/Import Land Use Coverage

DSS – Visuals n Alternative Builder Examples n Data Viewer. What is the best way to compare the results of management alternatives and other conditions –High level watershed characterization summaries examples. –Detailed examination of historical and model output data.

DSS – Alternative Builder n Sequentially add various options graphically and enter detailed information: –Diversions –Land use changes –Storage n Save details as individual options n Mix and match to generate a management alternative

User clicks to add diversion location and fills in Yellow Highlighted Fields

Data Viewer Watershed Characterization Summaries n Summarize the results of the management alternatives and compare to other alternatives, pre- 1850, or current conditions n Present output in readily understandable statements and plots n Distribute to stakeholders

Data Viewer Detail examiner n Ability to “drill down” and look at specific locations in detail. n Compare Management Alternatives at specific key locations. n Examine detailed model output, base flow, etc. n Variety of plotting options possible. n Primarily for technical users.

Location of Key Decision Points on Stream Network (outlet of drainages, streamflow gages, etc.)

Generate plots at key points to compare management alternatives

Summary Statistics Plot Options

Time Series Plot Blue – Time series of Mgmt Alternative Flow Red – Time series of Current Conditions Possible Representation of Improvement of some Alternative over Current Conditions Yellow – Time series of Mgmt Alternative Base Flow Drop Down Menu to Select Other Plot Types

Possible Customization of Box Plots Box Plot – Current Conditions Red Line – Mgmt. Alternative

Possible Representation of Improvement of some Alternative over Current Conditions (solid red) Fewer Instances of Low flow (hatched magenta) Direction of Change reinforced by arrow More Instances of Higher flow (hatched blue)

Discussion n We need your help –Does this meet your needs? –What information is most useful? –What information is unnecessary? –What have we left out that you want? n The next iteration