12/09/2005 13:30 Tiziana Paccagnella COSMO Gen. Meeting 2005 Zurich 6TH COSMO GENERAL MEETING 20 – 23 September 2005 Zurich Report from the Scientific.

Slides:



Advertisements
Similar presentations
The COSMO-LEPS system at ECMWF
Advertisements

Effective Meetings.
Purpose of Instruction
COSMO-SREPS COSMO Priority Project C. Marsigli, A. Montani and T. Paccagnella ARPA-SIM, Bologna, Italy.
FP7 Design study proposal Michele Punturo Harald Lueck.
Ensemble activities in COSMO C. Marsigli, A. Montani, T. Paccagnella ARPA-SIM - HydroMeteorological Service of Emilia-Romagna, Bologna, Italy.
PARIS21 CONSORTIUM MEETING Paris, October 2002 Progress Report of the Task Team on Food, Agriculture and Rural Statistics  Objectives  Past activities.
Expert Team on System Aspects and Interoperability Programme Glenn Greed, UKMO, Project Manager Interoperability Ulrich Schättler, DWD, Chairman of the.
13 ° COSMO General Meeting Rome VERSUS2 Priority Project Report and Plan Adriano Raspanti.
The Preparatory Phase Proposal a first draft to be discussed.
Project Overview, Objectives, Components and Targeted Outcomes
Science Plan and SPM report COSMO General Meeting, 9 September 2010.
Technology Strategy Board Driving Innovation Participation in Framework Programme 7 Octavio Pernas, UK NCP for Health (Industry) 11 th April 2012.
COSMO Annual Meeting September 2005 Zurich (Switzerland) Short-Range Numerical Weather Prediction Programme.
FP7-SPACE: Albert Klein Tank, KNMI WP4 Management, coordination, sustainability
Dr. Margaretha Mazura (EMF) ICT Day Opportunities to participate in EU ICT research projects San José, 16 February 2010 Principles of EU Research Funding.
How to use the VSS to design a National Strategy for the Development of Statistics (NSDS) 1.
Post-Secondary Education Program Joint AFN/INAC PSE Program Review with representation from NAIIHL and the Labrador Inuit Regional Information Process.
1 Thank you for visiting our site and welcome to the “Introduction to ISO 22000” Presentation that you requested. For more information.
“Thematic Priority 3” Draft Evaluation of IP + NoE.
Transportation Improvement Program Status and Update.
COSMO-SREPS Priority Project C. Marsigli ARPA-SIM - HydroMeteorological Service of Emilia-Romagna, Bologna, Italy.
12/09/ :30 Tiziana Paccagnella COSMO Gen. Meeting 2005 Zurich 6TH COSMO GENERAL MEETING 20 – 23 September 2005 Zurich Suggested Projects for the.
Overview on the Work of WG 6 Reference Version and Implementation WG Coordinator: Ulrich Schättler.
Interoperability at INM Experience with the SREPS system J. A. García-Moya NWP – Spanish Met Service INM SRNWP Interoperability Workshop ECMWF –
Plans for Short-Range Ensemble Forecast at INM José A. García-Moya SMNT – INM Workshop on Short Range Ensemble Forecast Madrid, October,
VERSUS2 – A new priority project for verification Pj Leader – Angela Celozzi.
1 Title of presentation Reflections on the future agenda of the CCSA Werner Bier and Henri Laurencin 20 th Session of the CCSA, Frankfurt, September.
Board Feedback Results Board Meeting Dallas April 2007 Board Feedback Results Governance Committee Report Presented at Los Angeles July 2007.
COSMO – 09/2007 STC Report and Presentation by Cosmo Partners DWD, MCH, USAM / ARPA SIM, HNMS, IMGW, NMA, HMC.
SREPS Priority Project COSMO General Meeting Cracov 2008 SREPS Priority Project: final report C. Marsigli, A. Montani, T. Paccagnella ARPA-SIM - HydroMeteorological.
WP2 – Strategy, co-operation and dissemination EuroVO-AIDA – First periodic review – 24 April 2009 Françoise Genova, Project Coordinator WP2 – NA2 Strategy,
Status of the COSMO web Cosmin Barbu, Rodica Dumitrache, Bogdan Maco National Meteorological Administration of Romania.
Overview of WG5 future activities Adriano Raspanti Zurich, September 2005.
Activities of the new WG7 Chiara Marsigli. WP Development of COSMO-LEPS Maintenance and updates of the operational suite at ECMWF (A. Montani) Study,
Langen, September 2003 COSMO-LEPS objective verification Chiara Marsigli, Francesco Boccanera, Andrea Montani, Fabrizio Nerozzi, Tiziana Paccagnella.
Number: TR/06/B/F/PP/ WASTE-TRAIN VOCATIONAL TRAINING, EDUCATION, CONVEYING INFORMATION ON UP-TO-DATE WASTE MANAGEMENT PRACTICES TO DECISION MAKERS/STAFF.
Review and outlook COSMO General Meeting, 8 September 2011.
Vincent N. Sakwa RSMC, Nairobi
PP CONSENS Merging COSMO-LEPS and COSMO- SREPS for the short-range Chiara Marsigli, Tiziana Paccagnella, Andrea Montani ARPA-SIMC, Bologna, Italy.
Final Presentation, European Cooperative House Brussels, 16 Dec.2009 Training +45 “Teachers Facilitating Learning among Elders” WP5 Test and Evaluation.
Tiziana Paccagnella COSMO General Meeting Bucharest Report from the Scientific Project Manager 7th COSMO GENERAL MEETING.
Status of the NWP-System & based on COSMO managed by ARPA-SIM COSMO I77 kmBCs from IFSNudgingCINECA COSMO I22.8 kmBCs from COSMO I7 Interpolated from COSMO.
WG4 Oct 2006 – Sep 2007 plans COSMO General Meeting, 21 September 2006 Pierre Eckert.
Progress Report on Quality Issues SIPUS – Strengthening of Internationalisation Policies at Universities in Serbia February 18, 2015 Belgrade, Serbia.
Capacity Building in: GEO Strategic Plan 2016 – 2025 and Work Programme 2016 Andiswa Mlisa GEO Secretariat Workshop on Capacity Building and Developing.
Status of the COSMO web Cosmin Barbu, Rodica Dumitrache National Meteorological Administration of Romania.
Activities and Introduction of working group 3 - WP PR EP Quality assessment and accreditation Pierluigi Febo, Jens Fehrmann Roma, 05. October.
Report from the Scientific Project Manager
19th GRI Coordination Group meeting
QUALITY IMPROVEMENT FINAL QUARTERLY COLLABORATIVE WORKSHOP
New COSMO Procedure COSMO General Meeting, Zürich September 2005.
Revision 1 to Document CWG-SFP-2/7-E 12 September 2017 Original: English Process and timetable for The elaboration of the ITU STRATEGIC and financial.
Report of the Scientific Project Manager 6th COSMO General Meeting
Preliminary test for the development of a 2.8km ensemble over Italy
Future design of the roundtable
NWP Strategy of DWD after 2006 GF XY DWD Feb-19.
DG Troika – 26 October – Portugal
2nd Workshop on Short Range EPS 7th–8th April 2005, Bologna
Selected Priority Projects
MIG-P orientation debate
Strategy for the coming years
Introduction Prep-SCG meeting 13 Sept 2013.
2nd SRNWP Workshop on Short Range Ensemble 7-8 April 2005 Bologna
Welcome Mid-Term ERA-NET SusAn Projects Seminar
Guidelines for future developments Tiziana Paccagnella, ARPA-SIM
Roles and Responsibilities
Activities of WG7 Chiara Marsigli.
Title Goes Here Name(s), Organization, CEOS Affiliation
Presentation transcript:

12/09/ :30 Tiziana Paccagnella COSMO Gen. Meeting 2005 Zurich 6TH COSMO GENERAL MEETING 20 – 23 September 2005 Zurich Report from the Scientific Project Manager (SPM) Tiziana Paccagnella ARPA-SIM

12/09/ :30 Tiziana Paccagnella COSMO Gen. Meeting 2005 Zurich Content Scientific and technical activities will be presented by WP coordinators during their Overview Talks I will briefly go through major steps related to COSMO management and coordination during the past year: STC Meeting Warsaw - December 2004 Work Packages Coordinators Meeting DWD, 3-4 May th STC meeting DWD, 13 June 2005 Work Packages Coordinators (SAC) Meeting Bologna, 1-2 September 2005

12/09/ :30 Tiziana Paccagnella COSMO Gen. Meeting 2005 Zurich STC Meeting – Warsaw - December 2004 Approval of the new organization of the COSMO General Meeting Oct 2004 Sept Dec 2004

12/09/ :30 Tiziana Paccagnella COSMO Gen. Meeting 2005 Zurich STC Meeting – Warsaw - December 2004 Approval of the 2005 work packages From the minutes of the meeting: “ There are about 120 WPs, 5 of them without any human resources. Much work is devoted to the operational maintenance of the LM system in each COSMO Member State but there is a lack in resources for scientific development “ Oct 2004 Sept Dec 2004

12/09/ :30 Tiziana Paccagnella COSMO Gen. Meeting 2005 Zurich Work Packages Coordinators Meeting DWD, 3-4 May 2005 Final decisions about the COSMO general meeting organization  Agenda  Workshops  Scientific contributions  …… 1-day WG1 workshop to discuss the future strategy of COSMO about Data Assimilation COSMO Verification Package: a project is required Oct 2004 Sept May 2005 WPC Meeting DWD May2005

12/09/ :30 Tiziana Paccagnella COSMO Gen. Meeting 2005 Zurich Work Packages Coordinators Meeting DWD, 3-4 May 2005 (2) Critical aspects  lack of man power  the solution is not easy to be found. A multi- component strategy must be designed to tackle the problem by different directions  centralize some of the activities which are duplicate in the COSMO countries; this would allow to save human resources to be diverted on other activities  Training of new scientists also by means of a visiting scientists program  ……  Discipline  COSMO scientists to do their best to respect the deadlines, to answer the mails, to circulate information etc.etc. Oct 2004 Sept May 2005

12/09/ :30 Tiziana Paccagnella COSMO Gen. Meeting 2005 Zurich Work Packages Coordinators Meeting DWD, 3-4 May 2005 (2) An updated overview of the skill of the model will be regularly presented by the WG5 Coordinator and discussed at every future WPC meeting Oct 2004 Sept May 2005

12/09/ :30 Tiziana Paccagnella COSMO Gen. Meeting 2005 Zurich 14th STC meeting DWD, 13 June 2005 It is necessary to better organize COSMO activities to have a higher degree of efficiency in pursuing COSMO objectives. The weakness due to lack of human resources must be overcome concentrating man power on strategic priorities. Starting from 2006 a new organisation of the COSMO activities will be implemented and tested. Oct 2004 Sept June 2005

12/09/ :30 Tiziana Paccagnella COSMO Gen. Meeting 2005 Zurich 14th STC meeting DWD, 13 June 2005 STC defines COSMO strategy SAC (WP Coordinators + SPM) defines a preliminary list of projects fitting COSMO strategy General Meeting parallel sessions: collection of proposals and fine- tuning of projects SAC defines a priority list to be submitted to the decisions of STC STC selects a limited (one-digit) numbers of “top priority projects” WP coordinators identify Project Leaders Project Leaders prepare a detailed Project description and a clear project plan (project activities, human resources, milestones) STC gives the final approval of the projects STC members assigns human resources to the projects Oct 2004 Sept June 2005

12/09/ :30 Tiziana Paccagnella COSMO Gen. Meeting 2005 Zurich COSMO SREPS Brainstorming at DWD DWD, 14 June 2005 A brainstorming about the development of a new ensemble system for short-range (SREPS) based on LM was held at DWD. Participants: DWD staff and SPM Outcome of the meeting:  COSMO-SREPS will see a strong cooperation with INM-Spain  INM will include LM among the models (5 including LM) they are running nested in 4 different global models. Oct 2004 Sept June 2005

12/09/ :30 Tiziana Paccagnella COSMO Gen. Meeting 2005 Zurich COSMO SREPS Brainstorming at DWD DWD, 14 June ) INM will run LM at 25-km grid for a large domain driven by GME, ECMWF, GFS and UKMO, and COSMO would use these four LM runs to drive the COSMO-SREPS at 10/7 km over the COSMO-LEPS domain. These runs would be performed at the ECMWF, and we would extract frames from the Spanish LM runs. 2) Activity to develop perturbations on the model trajectories, e.g. stochastic physics, will be carried on. For this activity a cooperation will be possible both with INM and later probably also with UKMO. Oct 2004 Sept June 2005

12/09/ :30 Tiziana Paccagnella COSMO Gen. Meeting 2005 Zurich Work Packages/Groups Coordinators (SAC) meeting DWD, 1-2 September COSMO strategy: goals and perspectives presented and discusses  Mathias Rotach will present on Thursday 2.Preliminary list of proposed Top Priority Projects  Tiziana Paccagnella will present on thursday Oct 2004 Sept 2005 Sept. 2005

12/09/ :30 Tiziana Paccagnella COSMO Gen. Meeting 2005 Zurich Work Packages/Groups Coordinators (SAC) meeting DWD, 1-2 September 2005 The two FTE contributions from each COSMO member will be devoted to:  Research and Development Priority Projects.  Management of Support. Management of Support includes mainly activities carried on in Working Group 6 Oct 2004 Sept 2005 Sept. 2005

12/09/ :30 Tiziana Paccagnella COSMO Gen. Meeting 2005 Zurich Andrea Raspanti will be the next WP coordinator of WG5 Verification On Thursday evening we will have a joint STC-SAC session

12/09/ :30 Tiziana Paccagnella COSMO Gen. Meeting 2005 Zurich COSMO-LEPS products requested by  Hungarian metoffice  Czech Met Service Cooperation with INM from HIRLAM Consortium on COSMO-SREPS

12/09/ :30 Tiziana Paccagnella COSMO Gen. Meeting 2005 Zurich Welcome to our new colleagues from Rumenia and from other institutions participating to our COSMO meeting for the first time !!!!!

12/09/ :30 Tiziana Paccagnella COSMO Gen. Meeting 2005 Zurich STC Meeting DWD June 2005) Some Outcomes May 2005 WPC Meeting DWD May2005 STC December 2004 SAC September 2005