Damped C-Band structures for ELI_NP proposal D. Alesini (LNF-INFN, Frascati, Italy) CERN, 18 July 2012.

Slides:



Advertisements
Similar presentations
5th Collaboration Meeting on X-band Accelerator Structure Design and Test Program. May 2011 Review of waveguide components development for CLIC I. Syratchev,
Advertisements

Choke-mode Damped X-band Structure for CLIC Main Linac Hao ZHA, Jiaru SHI CERN Sep 27, 2011 Jiaru Shi, LCWS11 Workshop, Granada1.
Choke-mode damped accelerating structures for CLIC main linac Hao Zha, Tsinghua University Jiaru Shi, CERN
Development of an X-band Dielectric PETS C. Jing, Euclid Techlabs / ANL HG Workshop, May
Design of Standing-Wave Accelerator Structure
Beam loading compensation 300Hz positron generation (Hardware Upgrade ??? Due to present Budget problem) LCWS2013 at Tokyo Uni., Nov KEK, Junji.
Conventional Source for ILC (300Hz Linac scheme and the cost) Junji Urakawa, KEK LCWS2012 Contents : 0. Short review of 300Hz conventional positron source.
C-band Structures at SPARC and Overview of
CLIC Drive Beam Linac Rolf Wegner. Outline Introduction: CLIC Drive Beam Concept Drive Beam Modules (modulator, klystron, accelerating structure) Optimisation.
SRF Results and Requirements Internal MLC Review Matthias Liepe1.
Contributions to ELI-NP on RF accelerator activities Andrea Mostacci Università di Roma, Sapienza The joint Sapienza/INFN-LNF group is active in the field.
1 C-Band Linac Development Satoshi Ohsawa 2004.Feb.19LCPAC.
The Frascati C-band structure and the high-power test of the cavity at KEK B. Spataro (LNF-INFN, Frascati, Italy) on behalf of the SPARC/X C-Band group.
Preliminary design of SPPC RF system Jianping DAI 2015/09/11 The CEPC-SppC Study Group Meeting, Sept. 11~12, IHEP.
Low Emittance RF Gun Developments for PAL-XFEL
2nd CLIC Advisory Committee (CLIC-ACE), CERN January 2008 Introduction to the CLIC Power Extraction and Transfer Structure (PETS) Design. I. Syratchev.
Development of Dielectric PETS Chunguang Jing and Wei Gai ANL and Euclid CLIC workshop 2013.
PROPOSAL G.I.A.F. (HYBRID GUN AT HIGH FREQUENCY) INFN-LNF – UNIVERSITY OF ROME “LA SAPIENZA”- UCLA D. Alesini (T), M. Ferrario (R), A. Gallo (T),
CLARA Gun Cavity Optimisation NVEC 05/06/2014 P. Goudket G. Burt, L. Cowie, J. McKenzie, B. Militsyn.
RF scheme of electron linear accelerator with energy MeV Levichev A.E. Budker Institute of Nuclear Physics SB RAS.
PBG Structure Experiments, AAC 2008 Photonic Bandgap Accelerator Experiments Roark A. Marsh, Michael A. Shapiro, Richard J. Temkin Massachusetts Institute.
Beam Loading experiment at KEK ATF ( Multi-train acceleration at KEK-ATF Injector ) KEK Masafumi Fukuda and Junji Urakawa LCWS /10/052 train acceleration.
Beam breakup and emittance growth in CLIC drive beam TW buncher Hamed Shaker School of Particles and Accelerators, IPM.
C-BAND ACCELERATION ACHIEVEMENTS, USE AND APPLICATION
Optimisation of single bunch linacs for possible FEL upgrades Alexej Grudiev, CERN 6/02/2014 CLIC14 workshop.
TESLA DAMPING RING RF DEFLECTORS DESIGN F.Marcellini & D. Alesini.
WP8-HGA High Gradient Acceleration M. Biagini (INFN-LNF) WP8 coordinator Tiara Kickoff Meeting, CERN, Feb , 2011.
S. Bettoni, R. Corsini, A. Vivoli (CERN) CLIC drive beam injector design.
Conventional source developments (300Hz Linac scheme and the cost, Part-II) Junji Urakawa, KEK PosiPol-2012 at DESY Zeuthen Contents : 0. Short review.
Accelerating structure prototypes for 2011 (proposal) A.Grudiev 6/07/11.
Towards a full C-band multi-bunch/high rep. rate/high gradient injector linac D. Alesini (LNF-INFN, Frascti, Italy) With the contribution of: A. Bacci,
ELI and other things A. D’Elia 1. C-BAND STRUCTURES FOR MULTI-BUNCH RF LINACS: ELI_NP PROPOSAL Bunch charge 250 pC Number of bunches 40 Bunch distance.
C/S band RF deflector for post interaction longitudinal phase space optimization (D. Alesini)
Main Technical Issues of theSuper B Injector Main Technical Issues of the Super B Injector SuperB Meeting, Isola d’Elba, May 31st – June 3rd, 2008 D. Alesini,
X-band Based FEL proposal
1 st TIARA Steering Committee A. Gallo – INFN Frascati deputy of TIARA WP8 leader STATUS OF TIARA WP8.
ELI PHOTOINJECTOR PARAMETERS: PRELIMINARY ANALYSIS AND SIMULATIONS C. RONSIVALLE.
–11.03 Hawaii Multi bunch acceleration on LUCX system Ⅰ. LUCX project Ⅱ. Simulation results for Compton scattering Ⅲ. Calculation on beam loading.
D. Alesini (LNF-INFN, Frascati, Italy) DESIGN AND TEST OF DAMPED/HIGH GRADIENT/HIGH REPETITION RATE C-BAND ACCELERATING STRUCTURES FOR THE ELI-NP LINAC.
Feasibility and R&D Needed For A TeV Class HEP e+e- Collider Based on AWA Technology Chunguang Jing for Accelerator R&D Group, HEP Division, ANL Aug
B. Marchetti R. Assmann, U. Dorda, J. Grebenyuk, Y. Nie, J. Zhu Acknowledgements: C. Behrens, R. Brinkmann, K. Flöttmann, M. Hüning,
Advancements on RF systems D. Alesini (LNF-INFN) Quinto Meeting Generale Collaborazione LI2FE, Frascati 15-16/03/2011.
Status of the sub-harmonic bunching system for the CLIC DB injector front end Hamed Shaker School of Particles and Accelerators, Institute for Research.
RF-kick in the CLIC accelerating structures
Present and possible future schemes for hadron therapy linacs Alberto Degiovanni for the ADAM team HG2017 Workshop , Valencia.
Linac beam dynamics Linac dynamics : C. Bruni, S. Chancé, L. Garolfi,
A 6 GeV Compact X-ray FEL (CXFEL) Driven by an X-Band Linac
Abstract EuSPARC and EuPRAXIA projects
Development of X-band 50MW klystron in BVERI
An X-band system for phase space linearisation on CLARA
Status of the CLIC main beam injectors
Optimisation of single bunch linac for FERMI upgrade
NC Accelerator Structures
Preliminary injector linac design
Physics design on Injector-1 RFQ
Application of the moderate peak power (6 MW) X-band klystron’s cluster for the CLIC accelerating structures testing program. I. Syratchev.
Brief Review of Microwave Dielectric Accelerators
Developments on Proposed
CEPC injector high field S-band accelerating structure design and R&D
17/10/2016 Reserch Activity Report 6D Phase Space Electron Beam Analysis And Optimization For Rf Linac Based Inverse Compton Scattering Radiation Sources.
Update of CLIC accelerating structure design
Recent high-gradient testing results from the CLIC XBoxes
SuperB project. Injection scheme design status
MIT Compact X-ray Source
Status of the CLIC Injector studies
CEPC Main Ring Cavity Design with HOM Couplers
Progress in the design of a damped an
Advanced Research Electron Accelerator Laboratory
Physics Design on Injector I
CLIC Power Extraction and Transfer structure (PETS)
Presentation transcript:

Damped C-Band structures for ELI_NP proposal D. Alesini (LNF-INFN, Frascati, Italy) CERN, 18 July 2012

M. Migliorati, A. Mostacci, C. Vaccarezza, M. Ferrario (Beam Breakup and wake-field calculation) V. Lollo, R. Di Raddo, (mech. Design of damped structures) S. Tocci, L. Palumbo (Univ. La Sapienza) (GdFidL simulations of damped structures) G. Riddone and her collaborators (CERN) (mechanical construction) A. Grudiev (CERN) (design of damped structures) THANKS TO ALL CONTRIBUTORS

OUTLINE The C-Band at LNF: C-Band accelerating structures for SPARC energy upgrade (e - acc. TW-single bunch) C-Band structures for multi-bunch RF LINACS: ELI-NP proposal (e - acc. TW multi bunch) -BBU study and requirements for the structures -design of structures -GdFidL simulations -Beam loading compensation -mechanical drawings

E ≈ 170 MeV GUN Klystron N°1 ≈ 13 MV/m ACC. SECTION 20 ÷ 22 MV/m ≈ 130 MeV ACC. SECTION Klystron N°2 PULSE COMPRESSOR ATT 3 dB splitter THE LNF: SPARC ENERGY UPGRADE C-band Station C-band ENERGY COMPRESSOR C-band acc. structures > 35 MV/m 5712 MHz – 50 MW 1.4 m ≈ 50 MW ≈ 100 MW/0.20 μs 2.5 μs E > 240 MeV The new C-band system consists mainly of:  2 accelerating sections (1.4 m long)  1 C-band klystron (50 MW), by Toshiba Ltd (JP)  1 Pulsed HV modulator supplied by ScandiNova (S)  WR187 waveguide system  400 W solid state driver supplied by MitecTelecom (CDN)  SLED The SPARC energy will be upgraded from  170 to >240 MeV by replacing a low gradient S-band traveling wave section with two C-band units. We decided to implement this system at SPARC to explore the C Band acceleration (RF components, construction at LNF TW sections, SLED, syncronization) in hybrid scheme with S Band: -Higher gradients -Very promising from the beam dynamics point of view

Structure design (CI) The structure has been designed in order to: -simplify the fabrication (Constant Impedance) -reduce the peak surface field on the irises when the structure is feed by the SLED pulse (large irises- Constant Impedance) -obtain an average accelerating field >35 MV/m with the available power from the klystron; -reduce the unbalance between the accelerating field at the entrance and at the end of the structure, due to the combination of power dissipation along the structure and SLED pulse profile (Constant Impedance). -reduce the filling time of the structure to input pulse length and, consequently, to reduce to the BDR (large irises) -increase the pumping speed (large irises) Coupler design Based on the “new generation” of couplers for high gradient operation proposed at SLAC for high gradient X Band structures (waveguide couplers) DESIGN OF C BAND TW STRUCTURES FOR SPARC (D. Alesini, et al, SPARC Note RF-11/002, 01/02/11) P RF_IN P RF_OUT

HIGH POWER KEK The high-power test started on November 5 and was completed on December 13, For almost one month of processing, from November 5 until December 2, more than 10 8 RF pulses of 200 ns width were sent into the structure with a repetition rate of 50 Hz. For a couple of days the RF pulse length was changed to 300 ns and for one day (November 12) the repetition rate was decreased to 25 Hz. On November 15, SKIP was switched on.

STATUS OF FINAL C-BAND ACCELERATING STRUCTURES

C-BAND STRUCTURES FOR MULTI-BUNCH RF LINACS: ELI_NP PROPOSAL Bunch charge 250 pC Number of bunches 40 Bunch distance 15 ns C-band average accelerating gradient 35 MV/m Norm. emittance 0.4 mm  mrad Bunch length <300  m RF rep Rate 100 In the context of the ELI-NP Research Infrastructure, to be built at Magurele (Bucharest, Romania), an advanced Source of Gamma-ray photons is planned, capable to produce beams of mono-chromatic and high spectral density gamma photons. The Gamma Beam System is based on a Compton back-scattering source. Its main specifications are: photon energy tunable in the range 1-20 MeV, rms bandwidth smaller than 0.3% and spectral density larger than 10 4 photons/sec.eV, with source spot sizes smaller than 50 microns. 14 C-band cavities 85 cells each (1.7 m long) S-Band

MULTI-BUNCH EFFECTS ANALISYS 1.Cumulative beam break-up in the ELI-NP C-Band LINAC 2.C-Band Damped structures 1.Beam loading and its compensation TRANSVERSE EFFECTS LONGITUDINAL EFFECTS

Beam breakup analysis Injector S-band Booster LINAC (C-band) Ideal axis Beam injection conditions at the entrance of the linac booster (y IN,y’ IN ) y OUT y’ OUT Phase LINAC exit E acc =average accelerating field E inj =beam energy after injector -Analytical approaches can be used to evaluate the beam breakup effects (for example Mosnier theory). -Tracking codes Beam output positions (y OUT,y’ OUT ) 1 st bunch of the train Other bunches Equivalent beam emittance increase

BBU Results Hypothesis: 1.Initial condition at linac injection equal for all bunches 2.Constant  -function 3.all transverse wakes that decays with the quality factor of the mode 4.One single mode trapped in each cell R T /Q26 Ω Q11000 f res GHz W T (  f 2 ) 245 V/m/pC w T =W T /L (  f 3 ) 14 kV/m 2 /pC tracking Tracking & Mosnier

Mitigation of multi-bunch effect with damped structures C-band non damped SPARC energy upgrade DAMPED STRUCTURES

ELI Damped structure design: iris aperture choice L=1.5 m P in =40 MW

Advantages 1. Strong damping of all modes above waveguide cut-off 2. Possibility of tuning the cells 3. Good cooling possibility Disadvantages 1.Machining: need a 3D milling machine 2.Multipole field components (octupole) but not critical at least for CLIC Advantages 1.Easy machining of cells (turning) 2.2D geometry: no multipole field components Disadvantages 1. Critical e.m. design: notch filter can reflect also other modes. 2. Not possible to tune the structure 4. Cooling at 100 Hz, long pulse length (?) Damping of dipole modes choice Dipoles modes propagate in the waveguide and dissipate into a load CLIC structures X-band, high gradient C-Band structures Spring-8

ELI Damped structure Mode launcher coupler Output coupler TW cells w w=7 mm w=13 mm First dipole mode passband

ELI Damped structure: parameters PARAMETERVALUE TypeTW-constant impedance 85 cells Frequency (f RF )5.712 [GHz] Phase advance per cell 2  /3 Structure Length included couplers (L)1.7 m Iris aperture (a)6.5 mm group velocity (v g /c):0.022 Quality factor (Q)8830 Field attenuation (  ) 0.31 [1/m] series impedance (Z) 45 [M  /m 2 ] Shunt impedance per unit length (r) 72 [M  /m] Filling time (  ) 230 [ns] Power E acc =35 MV/m27 [MW] E s peak /E acc 2.1 H s peak /E acc 4.3  [A/V] Minimum RF pulse length (  IMP )0.85 [  s] Output power 0.39  P in E P IN =40 MW34 MV/m Pulsed P IN =40 MW9 o C Accelerating field unbalance (E IN, E OUT )42.4MV/m, MV/m Average dissipated 100 Hz, P IN =40 MW2 [kW]

GdFidL Simulations (1/3) -Several simulations have been done assuming perfect matches waveguides 20 cells + 2 couplers  =5mm Mesh_step=500  m

Simulations have bee also done considering dampers. The damping material has been modeled with a dielectric with losses in order to reproduce a given loss tangent at 8 GHz frequency. The shape of the absorber has been optimized to reduce the reflection coefficient at 8 GHz. Different simulations have been done to reproduce a mismatched absorber GdFidL Simulations (2/3) parameters 0,18 rr 11 Freq.8 GHz 80 mm optimized  r =10 mismatched

GdFidL Simulations (3/3)

Beam loading: approach The external voltage given by the RF generator and the beam induced voltage in CI structure can be analytically calculated un the frequency domain [Wang,…] and they are given by the following expressions:

Beam loading: results

Beam loading: possible compensation

input/output mode launcher couplers are fabricated separately and joined to the cells by a vacuum flange Construction

Central cells

Couplers

The fabrication of a prototype with a reduced number of cells is necessary to: A.Test the effectiveness of the dipole mode damping including the test the absorbing material performances B.Test the vacuum properties of the structure with absorbing material C.Perform the low power tests and the tuning of the structure D.Test the high gradient performances of the structure Realization and prototyping

Conclusions -C-Band structure adventure LNF for the SPARC energy upgrade- single bunch operation -For the ELI-NP proposal Damped structures (waveguide absorbers) have been proposed to prevent BBU -EM design has been completed (single cell+couplers) -GdFidL simulations have been done -A possible simple beam loading compensation scheme has been proposed -Mechanical drawings almost completed -Prototyping necessary… THANK YOU