14/November/2002 CF NSS2002 in Norfolk, Virginia, USA 1 The First Integration Test of the ATLAS End-cap Muon Level 1 Trigger System Introduction Overview.

Slides:



Advertisements
Similar presentations
Particle rate in M1 and M2 Muon Meeting
Advertisements

20/Oct./2000 CF IEEE NSS 2000 at Lyon,France 1 An MWPC Readout Chip for High Rate Environment Introduction ASIC Structure & Fabrication ASIC Evaluation.
S. Veneziano, Lecce 21 February 2002 RPC readout and trigger electronics status Lecce 21/02/2002.
Tests of CAEN 1190 Multi-hit TDCs Simona Malace Brad Sawatzky and Brian Moffit JLab Hall C Summer Workshop Aug , JLab.
The First-Level Trigger of ATLAS Johannes Haller (CERN) on behalf of the ATLAS First-Level Trigger Groups International Europhysics Conference on High.
20 Feb LVL1 muon trigger simulation meeting1 the OO codes for endcap muon trigger simulation Hisaya Kurashige KOBE Univ.
8th Workshop on Electronics for LHC Experiment, Colmar, France, 10 Sep R.Ichimiya, ATLAS Japan 1 Sector Logic Implementation for the ATLAS Endcap.
FDR of the End-cap Muon Trigger Electronics 1/Mar./04 1 Beam Test of TGC electronics in 2003 Introduction Electronics Setup Stand-alone Run Setup Data.
RPC Electronics Status Overall system TDC –Digitizing frequency issue (determine the bin size of the TDC value) Discriminator test result Trigger module.
DSP online algorithms for the ATLAS TileCal Read Out Drivers Cristobal Cuenca Almenar IFIC (University of Valencia-CSIC)
Endcap Muon meeting: CMU, Oct 19, 2003 J. Hauser UCLA 1 CSC Trigger Primitives Test Beam Studies Main Test Beam 2003 Goals: Verify the peripheral crate.
Uli Schäfer 1 JEM: Status and plans JEM1.2 Status Test results Plans.
Uli Schäfer 1 JEM1: Status and plans JEM1.1 Status Plans.
Uli Schäfer 1 JEM1: Status and plans power Jet Sum R S T U VME CC RM ACE CAN Flash TTC JEM1.0 status JEM1.1 Plans.
Uli Schäfer JEM Status and plans Firmware Hardware status JEM1 Plans.
19 March 2012Muon Week - Operations1 Muon Week Muon Operations Session Introduction Status and LHC Schedule Detector Readiness + Preparation for Physics.
RPC Trigger ESR Warsaw 08 July 2003 F. Loddo I.N.F.N. Bari Status report on RPC FEB production Status report on RPC Distribution Board Interfaces RPC-LB.
FDR of the End-cap Muon Trigger Electronics 1/Mar./04 1 Slice Test (SLT) of TGC electronics Introduction Simulation Trigger part SLT Wire Wire and Signal.
October 1st th Workshop on Electronics for LHC Experiment at Amsterdam 1 Beam Test Result of the ATLAS End-cap Muon Level-1 Trigger Chikara Fukunaga.
Global Trigger H. Bergauer, K. Kastner, S. Kostner, A. Nentchev, B. Neuherz, N. Neumeister, M. Padrta, P. Porth, H. Rohringer, H. Sakulin, J. Strauss,
The PEPPo e - & e + polarization measurements E. Fanchini On behalf of the PEPPo collaboration POSIPOL 2012 Zeuthen 4-6 September E. Fanchini -Posipol.
Bologna, 10/04/2003 Workshop on LHC Physics with High P t Muon in CMS R.Travaglini – INFN Bologna Status of Trigger Server electronics Trigger boards TB.
An Asynchronous Level-1 Tracking Trigger for Future LHC Detector Upgrades A. Madorsky, D. Acosta University of Florida/Physics, POB , Gainesville,
CF 8/June/2003 ATLAS muon week in Gallipoli 1 The 1 st Beam Test of TGC electronics at H8 in May/June ‘03 Chikara Fukunaga on behalf of TGC electronics.
U N C L A S S I F I E D FVTX Detector Readout Concept S. Butsyk For LANL P-25 group.
Pixel hybrid status & issues Outline Pixel hybrid overview ALICE1 readout chip Readout options at PHENIX Other issues Plans and activities K. Tanida (RIKEN)
STGC Trigger Demonstrator sTGC Trigger Demonstrator ATLAS Israel Annual Meeting 30 December 2012 Lorne Levinson, Julia Narevicius, Alex Roich, Meir Shoa,
TGC Electronics Status Osamu Sasaki 23 Dec 河口湖 SLB ASIC PS-Board H-pT Board Star Switch Sector Logic Other boards Procurement 2004 極み.
14/6/2000 End Cap Muon Trigger Review at CERN 1 TGC LVL1 Trigger System Link C.Fukunaga/Tokyo Metropolitan University TGC electronics group System link.
CPT Week, April 2001Darin Acosta1 Status of the Next Generation CSC Track-Finder D.Acosta University of Florida.
14/6/2000 End Cap Muon Trigger Review at CERN 1 Muon Track Trigger Processing on Slave and Hi-pT Boards C.Fukunaga/Tokyo Metropolitan University TGC electronics.
RICH SIMULATION USING GEANT4 S.EASO, RAL OBJECTIVES OF THE SIMULATION. CURRENT STATUS AND PLANS. INTEGRATION WITH LHCb SOFTWARE. SUMMARY.
Mobile DAQ Testbench ‘Mobi DAQ’ Paulo Vitor da Silva, Gerolf Schlager.
Features of the new Alibava firmware: 1. Universal for laboratory use (readout of stand-alone detector via USB interface) and for the telescope readout.
Ideas about Tests and Sequencing C.N.P.Gee Rutherford Appleton Laboratory 3rd March 2001.
FDR of the End-cap Muon Trigger Electronics 1/Mar./04 1 Hi-pT Board Hi-pT ASIC Board Type Endcap-wire Endcap-Strip Forward Chikara Fukunaga (TMU)
FDR of the End-cap Muon Trigger Electronics 1/Mar./04
NUMI Off Axis NUMI Off Axis Workshop Workshop Argonne Meeting Electronics for RPCs Gary Drake, Charlie Nelson Apr. 25, 2003 p. 1.
Some thoughts on the New Small Wheel Trigger Issues V. Polychronakos, BNL 10 May,
The Status of the ATLAS Experiment Dr Alan Watson University of Birmingham on behalf of the ATLAS Collaboration.
ATLAS Muon Week in Seattle 30/June/04 1 Test Beam of TGC electronics in 2004 Introduction Member List Electronics Setup TGC Setup Overlap problem in 2003.
TGC Timing Adjustment Chikara Fukunaga (TMU) ATLAS Timing Workshop 5 July ‘07.
14/Sept./2004 LECC2004 Irradiation test of ASIC and FPGA for ATLAS TGC Level-1Trigger System 1 TID (  -ray) and SEE (proton) tests and results for ROHM.
TGC-electronics commissioning before beam collision Y. Sugaya Osaka-U アトラス総会2004 12/23 河口湖.
S.MonteilCOMMISSIONING1 PS/SPD ELECTRONICS OUTLINE 1)STATUS OF PS/SPD FE BOARDS PRODUCTION 2)PHASES OF PS/SPD COMMISSIONING 1)LEDs AND DETECTORS 2)TUBES.
CERN, 18 december 2003Coincidence Matrix ASIC PRR Coincidence ASIC modifications E.Petrolo, R.Vari, S.Veneziano INFN-Rome.
Design Studies of the ATLAS Muon Level-1 Trigger based on the MDT Detector for the LHC Upgrade O.Sasaki, Y.Suzuki, K.Nagano, M.Ishino, M.Ikeno (KEK), K.Bendtz,
CF 16/Feb/20031 H8 Beam Test in 2003 ─ Preparation status TGC-Japan electronics group.
2001/02/16TGC off-detector PDR1 Sector Logic Status Report Design Prototype-(-1) Prototype-0 Schedule.
The 1st Result of Global Commissioning of the ATALS Endcap Muon Trigger System in ATLAS Cavern Takuya SUGIMOTO (Nagoya University) On behalf of TGC Group.
1 Electronics Status Trigger and DAQ run successfully in RUN2006 for the first time Trigger communication to DRS boards via trigger bus Trigger firmware.
CHIPP meeting Appenberg, 24 Aug 2009 Preparation for LHC beam, Jeroen van Tilburg 1/15 Jeroen van Tilburg (Universität Zürich) LHCb: Preparation for LHC.
Could we abandon the HW LLT option and save money (and allow possible further improvements to the upgraded muon system)? Alessandro Cardini of behalf of.
AFP Trigger DAQ and DCS Krzysztof Korcyl Institute of Nuclear Physics - Cracow on behalf of TDAQ and DCS subsystems.
IB PRR PRR – IB System.
TGC electronics meeting at CERN June/ Status of ASIC development for TGC electronics PP SLB Hi-pT JRC PPE SSW-rx VME protocol Chikara Fukunaga TGC.
Rutherford Appleton Laboratory September 1999Fifth Workshop on Electronics for LHC Presented by S. Quinton.
Evelyn Thomson Ohio State University Page 1 XFT Status CDF Trigger Workshop, 17 August 2000 l XFT Hardware status l XFT Integration tests at B0, including:
H-pT ASIC A.The logic of H-pT ASIC 1. overview 2. matrix, encoder, selector… B. Test result 1. verification 2. electrical characteristics C. Usage.
CMS Week, 3-7 November CSC Trigger Test Beam Report Cast of many.
EPS HEP 2007 Manchester -- Thilo Pauly July The ATLAS Level-1 Trigger Overview and Status Report including Cosmic-Ray Commissioning Thilo.
Sector logic firmware and G-link Merger board designs
PRR of the TGC SLB and SSW (Reported by CF)
CMS EMU TRIGGER ELECTRONICS
Hall A Compton Electron detector overview
Sergey Abrahamyan Yerevan Physics Institute APEX collaboration
The First-Level Trigger of ATLAS
Example of DAQ Trigger issues for the SoLID experiment
Bringing the ATLAS Muon Spectrometer to Life with Cosmic Rays
The LHCb Level 1 trigger LHC Symposium, October 27, 2001
Presentation transcript:

14/November/2002 CF NSS2002 in Norfolk, Virginia, USA 1 The First Integration Test of the ATLAS End-cap Muon Level 1 Trigger System Introduction Overview of ATLAS End-cap Muon Level1 Trigger TGC electronics (Level1 Trigger + TGC Readout) Slice Test Setup Test Results Summary Chikara Fukunaga Tokyo Metropolitan University On behalf of the ATLAS TGC electronics group

14/November/2002 CF NSS2002 in Norfolk, Virginia, USA 2 Introduction 3 main ASICs out of total 7 have been made with full specifications. Stand-alone tests of ASICs have been finished. An overall integrated test has been required with all these ASICs in one test bed →Slice test (SLT) system. C++ based trigger simulation program has been needed and developed, and it could give the test patterns and answers to the SLT system. Integration test started in Sept.,’01, all the components have been installed in Aug.,’02.

14/November/2002 CF NSS2002 in Norfolk, Virginia, USA 3 Overview of ATLAS End-cap Muon Level1 Trigger M1 M2 M3 Thin Gap Chamber (TGC) 1.05    2.70, z = ±14m r (wire)-  (strip) readout Total 150 K channels for Trigger Total 7 layers (M1,M2 and M3) Low-pT Trigger, p T ≥ 6 GeV M1(3) triplet: 2 out of 1, 1out of 2 M2(2) vs. M3(2) doublets: 3 out of 4 Hi-pT Trigger, p T ≥ 20 GeV M1 vs. doublets (M2&M3) Sector Logic (SL) R-  coincidence, Highest p T tracks To Muon Central Trigger Proc. I/F

14/November/2002 CF NSS2002 in Norfolk, Virginia, USA 4 TGC electronics (Level1 Trigger + TGC Readout) M3 M2 M1 On detector part Off detector part

14/November/2002 CF NSS2002 in Norfolk, Virginia, USA 5 Slice Test (SLT) Setup

14/November/2002 CF NSS2002 in Norfolk, Virginia, USA 6 SLT Components I– PS Board & ASICs SLB ASIC 0.35  m 250K gates Low-pT Trigger Readout buffer PP ASIC 0.6 → 0.35  m 50K gates Analog+digital LVDSrx Fine delay Bunch Crossing ID Trigger (Hi-pT) Readout (SSW)

14/November/2002 CF NSS2002 in Norfolk, Virginia, USA 7 SLT Components II - Hi-pT board & ASIC LVDS in From PS board G-link out To SL Hi-pT ASIC 0.35mm 80Kgates Hi-pT trigger Hitachi BGA

14/November/2002 CF NSS2002 in Norfolk, Virginia, USA 8 SLT Components III – Readout System LVDS in From PS board (SLB) G-link out To ROD Star Switch (SSW) Read Out Driver (ROD) G-link in From SSW FIFO SDRAM CPU

14/November/2002 CF NSS2002 in Norfolk, Virginia, USA 9 SLT Components IV – Software system Integrated control software based on the ATLAS online SW framework SLT requires initialization and module/ASIC configuration at beginning Run control for run start/stop Run Control GUI & Status Window Configuration DataBase Editor Window

14/November/2002 CF NSS2002 in Norfolk, Virginia, USA 10 SLT Results I – Trigger Part Logic Verification of Trigger Logic (Simulation vs. HW) The same trigger hit patterns used for the simulation were inputted to PPG (pulse Pattern generators), and compared outputs of the SLT system with one of the simulation: Generated Trigger Hit patterns, and comparison with the simulation 1 track (~20000) → No error found. 2 tracks (~20000) → No error found. ≥ 3 tracks (~15000) → No error found.

14/November/2002 CF NSS2002 in Norfolk, Virginia, USA 11 SLT Results II - Trigger Latency Stage SLT Measurement Required upper limit TGC, ASD PP ASIC4350 SLB ASIC4975 LVDS Tx,Rx8375 Cable 15m75 Hi-pT ASIC5575 G-link Tx,Rx10575 Cable (90m)450 SL Cable (5m)25 Total Latency Measurement = Actual Measurement (PS board, HiPT and SL) AND Cable length Estimation 1205ns (SLT) < 1250ns (RUL)

14/November/2002 CF NSS2002 in Norfolk, Virginia, USA 12 SLT Results III – Readout test Since SSW has been delivered in this summer, full test of PS-board→SSW→ROD has not been done. PS-board→PT4(SSW alternative)→ROD has been checked in 2001 with long run tests. 400 clock counts (40MHz) can be used for SLB or SSW readout if Level 1 rate is 100KHz. SLB uses 218 counts. If TGC occupancy is 4%, SSW needs 160 counts. SSW will not be bottle neck. (TGC Occupancy ~ 1%)

14/November/2002 CF NSS2002 in Norfolk, Virginia, USA 13 SLT Results - ROD ROD (Read Out Buffer) has several problems. 4 bytes access to internal bus takes 0.2  s. SSW No hits = 4bytes SSW Hits = 40bytes If all 13 SSWs have no hits, 14  s, if all hits, 30  s. One ROD with 13 SSWs can be done with 30~70KHz (< 100KHz). We need design modification. ROD Structure

14/November/2002 CF NSS2002 in Norfolk, Virginia, USA 14 Summary BlockTestStatus Trigger Part Done, pattern check OK Latency OK 1205  s<1250  s Readout Part IntegrationNot yet, stand-alone Readout Rate SSWOK 100KHz Readout Rate ROD30~70KHz Software Online DAQ OK, will be used for beam Trigger Logic Simulation Need improvements Control System HSC-CCIOK for config. ASIC