IntelliDrive Research Signal Phase & Timing (SPaT) and Related Messages Edward Fok Office of Technical Service San Francisco.

Slides:



Advertisements
Similar presentations
IntelliDrive Safety Workshop July 20, 2010 Ray Resendes US Department of Transportation National Highway Traffic Safety Administration IntelliDrive Vehicle-toVehicle.
Advertisements

Date: 1 October2013 Meeting: Concertation meeting VRA Speaker and organisation: Maarten Oonk, TNO [ Roadmap Automation in Road Transport.
Vehicle-infrastructure integration: creating co-operative mobility systems and services Hearing EU Parliament, 22 January 2009 Hermann Meyer, CEO.
Certification Pilot May 5, 2010 Walton Fehr US Department of Transportation ITS Joint Program Office IntelliDrive Connectivity and the Future of Surface.
1 IntelliDrive SM IntelliDrive SM for Transit 101 ITS America Annual Meeting May 4, 2010 Jeffrey L. Spencer FTA.
Agency Administrators August 17, 2004 Wethersfield Police Department CAPTAIN A Service Management Update Capitol Region Council of Governments.
Integrated Corridor Management Overview and Status Mike Freitas ICM Initiative Coordinator U.S. DOT ITS Joint Program Office.
Original vision for Vehicle Infrastructure Integration (VII):
G4 Apps The Impact of Connected Vehicles on Traffic Operations ISMA Traffic Expo October 1, 2014.
Evaluation Tools to Support ITS Planning Process FDOT Research #BD presented to Model Advancement Committee presented by Mohammed Hadi, Ph.D., PE.
Human Factors Research Issues for Cooperative Intersection Collision Avoidance Systems (CICAS) Vicki Neale, Ph.D. Director, Center for Vehicle-Infrastructure.
1. Overview Background Introduction to IntelliDrive SM Preliminary Research/Proof of Concept Potential Applications –Safety –Mobility –Commercial The.
Office of Research and Information Technology Wireless Roadside Inspection Pilot Tests Chris Flanigan FMCSA/Office of Analysis, Research, and Technology.
Addis–Adama Expressway
Data Technology Project. Our Purpose “ To functionally support and complete a COMPSTAT approach by interoperable data sharing using a common standard.
Cooperative Intersection Collision Avoidance Systems Initiative May 2005, ITS America Annual Meeting Mike Schagrin ITS Joint Program Office U.S. Department.
Electronic Freight Manifest Initiative ITS JPO Lead: Kate Hartman Technical Lead: Mike Onder, Office of Freight Management and Operations.
Legal issues addressed in the EU funded AdaptIVe project
Michigan VII: Technology Improving Lives ITS Midwest Annual Meeting February 7, 2006 Gregory D. Krueger, P.E. Statewide ITS Program Manager Michigan Department.
VII System Architecture
Advancing Safety Through Innovation University Transportation Centers Safety Summit March 19-20, 2015 Jeffrey Onizuk Intelligent Transportation System.
IntelliDrive Policy and Institutional Issues Research Valerie Briggs Team Lead, Knowledge Transfer and Policy, ITS Joint Program Office, RITA May 4, 2010.
National VII Architecture – Data Perspective Michael Schagrin ITS Joint Program Office US Department of Transportation TRB 2008 Annual Meeting Session.
USDOT, RITA RITA: Oversight of USDOT’s R&D programs  University Transportation Centers $100M  UTC Consortia $80M  UTC Multimodal R&D $40M  Intelligent.
Meeting of State Pooled Fund Partners April 20, 2005 "Reducing Crashes at Rural Intersections: Toward a Multi-State Consensus on Rural Intersection Decision.
Roadway Safety Panel How can ITS assist in bridging vehicle technology with roadway design and function?
ITS Program Update Moving Towards Implementation of Wireless Connectivity in Surface Transportation Talking Freight Webinar January 19, 2011.
Doc.: IEEE ae Submission Jan Kenney – Toyota/VSC3Slide 1 Case Study for reduced priority management frames – Vehicular Safety.
1 IntelliDrive SM Research, Development and Emerging Technologies National ITS Perspective Panel Joseph I. Peters, Ph.D. Federal Highway Administration.
V ehicle I nfrastructure I ntegration Jeffrey F. Paniati Associate Administrator for Operations and Acting Program Manager for ITS Joint Program Office.
Vehicle Infrastructure Integration (VII) FDOT’s Annual ITS Working Group Meeting March 20, 2008 George Gilhooley.
Mike Schagrin US Department of Transportation ITS Joint Program Office IntelliDrive Safety Program Overview.
ITS Standards Program Strategic Plan Summary June 16, 2009 Blake Christie Principal Engineer, Noblis for Steve Sill Project Manager, ITS Standards Program.
Partnering for Improving Crash Data Quality and Use State of Maine Approach ME Traffic Records Forum Session #43 July 17, 2003 Denver, Colorado 2001 Best.
VERMONT COMMUNICATIONS (VCOMM) March 2, 2006.
Connected Vehicle Program – Dynamic Mobility Applications Highlights for Tech Scan Scrum.
IntelliDrive SM Vehicle Safety Communications Working Toward V2V Deployment John Harding July 20, 2010.
FHWA Office of Operations Research and Development Executing the Vehicle-to-Infrastructure Research Program: Enabling Technology September 25, 2013 Deborah.
1 IntelliDrive SM Connectivity − the Future of Surface Transportation June 7, 2010 AASHTO Subcommittee on Highway Transport Kate Hartman Research and Innovative.
September 25, 2013 Greg Davis FHWA Office of Safety Research, Development and Test Overview of V2I Safety Applications.
IntelliDriveSM Update
IntelliDriveSM Vehicle to Infrastructure Connectivity for Safety Applications Monique Evans Director, FHWA Office of Safety RD&T U.S. Department of Transportation.
U.S. Department of Transportation Intelligent Transportation Systems Program 2005 Update Jeffrey F. Paniati Associate Administrator for Operations Acting.
Status of ITS research May Peter Sweatman David Kapp.
FHWA Perspectives on VII Pat Kennedy Road Weather Management Program Federal Highway Administration VII Weather Applications Workshop II June 21, 2006.
VII Applications Mike Schagrin, VII Applications Manager ITS Joint Program Office Research & Innovative Technology Administration USDOT Mike Schagrin,
Research Elements of Integrated Vehicle Based Safety Systems Jack Ference, IVBSS Technical Manager ITS America Annual Meeting May, 2005.
IntelliDrive SM Vehicle to Infrastructure Connectivity for Safety Applications Monique Evans Director, FHWA Office of Safety RD&T U.S. Department of Transportation.
Michigan VII: Technology Improving Lives Safety Summit Lansing, MI February 28, 2006 Gregory D. Krueger ITS Program Manager Michigan Department of Transportation.
IntelliDrive Safety Workshop July 20, 2010 Stephanie C. Binder National Highway Traffic Safety Administration US Department of Transportation Human Factors.
Research on the Connected Car Hans-J. Reumerman Philips Technology Research Laboratories Aachen Connectivity Systems Application Industry relations Technology.
National ITS Architecture Update ITS Joint Program Office Professional Capacity Building Program Talking Technology and Transportation (T3) Presentation.
VII Applications Mike Schagrin, VII Applications Manager ITS Joint Program Office Research & Innovative Technology Administration USDOT Mike Schagrin,
USDOT’s IntelliDrive Program Smart Roadside Initiative – How it Fits.
1 VII CONSORTIUM VIIC Update Walton Fehr Boulder, CO June 21, 2006.
1 Integrated Vehicle-Based Safety Systems Initiative Jack Ference United States Department of Transportation 2006 ITS World Congress 8-12 October 2006.
1 IntelliDrive SM Vehicle to Infrastructure Connectivity for Safety Applications Greg Davis FHWA Office of Safety RD&T U.S. Department of Transportation.
For Presentation at 28 th APEC Transportation Working Group Meeting Vancouver, Canada Walter Kulyk Director, Office of Mobility Innovation Federal Transit.
DSRC and SPaT, SSM, SRM & MAP
Cooperative Transportation Systems Pooled Fund Study April 20, 2012 Melissa Lance ITS Communications Manager Virginia Department of Transportation.
1 USDOT Next Generation Initiative Laurie Flaherty EMS Division, NHTSA.
SPaT Challenge Overview and Execution
Routing Texas into the Future
Smart Columbus Overview
SAE DSRC Technical Committee work and outlook
Mike Schagrin ITS Joint Program Office
IntelliDriveSM Connectivity and the Future of Surface Transportation
FHWA Office of Operations Research and Development Executing the Vehicle-to-Infrastructure Research Program: Enabling Technology Deborah Curtis
Connected Vehicle Reference Implementation Architecture (CVRIA)
Roadmap for the S-100 Implementation Decade
Presentation transcript:

IntelliDrive Research Signal Phase & Timing (SPaT) and Related Messages Edward Fok Office of Technical Service San Francisco

Research Goal Define an open interface for two-way communication of traffic signal information between traffic signal controller and a mobile device

Purpose of SPaT Traffic signal control information that conveys the current movement state of each active phase in the system will provide the capability for: – Safety applications such as warnings and alerts for crash avoidance – Mobility applications to enable dynamic and efficient traffic management – Environment applications that allow savings in fuel consumption and reduction in CO 2 emissions.

Related Messages Map data that conveys the gemetric layout of the associated intersection Positioning data that allows the correlation of the signal and map data

SPaT Operation Overview On Board Equipment (OBE) Traffic Control Device Traffic Control Device DSRC radio SPaT Processor Positioning/ GPS Positioning/ GPS Map storage/ GID Map storage/ GID MAP/GID GPSC SPaT

Open Interface – Concept Interface to be defined Two-way communication Mobile Equipment SAE J2735 SAE J2735 Traffic Signal Controller Traffic Signal Controller NTCIP 1202 NTCIP 1202 NEMA TS-X 2070 ATC Others

Desirable Characteristics Minimize the need for new standard objects, or ideally: no new objects. Traffic Controller standard may reference SAE J2735 SAEJ2735 reference NTCIP 1202 Updates expected for both Standards

Process for Development Review of relevant Past and Current research Creation of user forums – Traffic Control Industries – Modal Partners – Vehicle and Tier-1 OEM Concept of Operation Development Prototype Development Finalize Interface

Track 5 Track 1 Track 2 Project Mgmnt Rqrmnts Track 3 Track 4 Concept Definition Testing Prototype Finalize Interface Definition CY Q2Q3Q4Q CY Q2Q3Q4Q Con Ops PMP & SEMP Update Requirements Update Requirements Build Environment for prototype evaluation Develop (2) Prototypes Develop Prototypes with additional vendors Issue SOW Requirements Walkthrough Cap Anal Rsrch/ Lit Rev Contract Award Integrate SPaT with Map, Positioning, & Security Subject Matter Expert Workshop CY Q2Q3Q4Q Reqs ConOps Walkthrough Draft Interface Definition Additional Prototype Testing Safety Pilot Model Deployment Review Draft with Standards Stakeholders Test initial Prototypes Signal Phase and Timing Research Roadmap (planned)