1 Public Works Operations March 11, 2008. 2 Streets – Street Sweeper Warranty repair in February resulted in about 5 weeks of downtime Streets are Dirty.

Slides:



Advertisements
Similar presentations
Highway 61/147th Street Intersection Business Meeting April 20, 2010.
Advertisements

City of Traverse City Snow Removal Operations. Responsibilities Streets Division –State Highways (Trunkline, 8 miles) –City Streets (83 miles) Emergency.
Winter Storm ” Snowfall 20 Days of Freezing Rain.
Foundations of Real Estate Management BOMA International Module 5: Putting It All Together Landscaping and Snow Removal ® ®
Stormwater Illicit Discharge Inspector Training Workshop April 24, 2013 Tabletop Group Exercise.
INDIAN VALLEY COMMUNITY SERVICES DISTRICT. It is my goal to present to the Board, and Community, not only clear justification for this proposed acquisition,
1 CONTRACTORS EQUIPMENT Presented by: Gina Hilgendorf – Hanover Marine April 30, 2009.
City of Berea North End Area Sewer Investigation Project- Phase I Commencing Fall 2011.
Ken Kopka LBWID Staff Manager STREET SWEEPING AS A BMP THE LAKE BARCROFT WATERSHED EXPERIENCE.
Welcome Learn more about upcoming construction activities on Cedarvale Avenue and Oak Park Avenue View display boards and speak one-on-one with staff Building.
As presented by: Rodger Schuldt TCEQ Installer II License # OS19898 TCEQ Maintenance Provider License # MP00545 TCEQ Site Evaluator License # OS20270.
PAVEMENT MAINTENANCE II Part 1b: Chip Seal Construction Idaho Roads Scholar Program.
With Good Flow Data: Greater control Decisions grounded in facts Needs clearly prioritized Remove the risk from planning.
 Employees who maintain and repair our streets and drainage infrastructure can help reduce water pollution by following precautions in their daily activities:
PESTICIDE and HERBICIDE PRACTICES  Limit soil erosion by planting vegetation on bare areas and using mulch or matting for landscaped areas. CONCLUSION.
Winter Road Treatments & Snow Removal Costs Outline.
Achieving Greater Success in Emergency Management by Preparing & Planning with Public Works.
1. 2 Safety work-stoppage PDO & its contractors have suffered THREE high potential incidents involving cold cutting in the last TWO months.
Pavement Restoration on Main Replacement Projects Pipe Splitting and Keyhole Technology At Southwest Gas Corporation Southwest Gas Corporation Kenny Pollock.
Winter Storm Response Presentation & Discussion. Winter Storm Response2 Storm Response – PW Mission “We strive for the safest roadways at a reasonable.
BUILD WITH US. ™ Contractors
MINE HAZARD TRAINING FOR CONTRACT TRUCKERS A safety presentation for over-the-road contract truck drivers working at surface mines.
Discussion Topics Construction Contract Administration Lessons Learned Other Construction Issues Questions? / Comments (Anytime)
BCC Work Session Food Trucks Zoning Division April 22, 2014.
WAR ON POTHOLES POTHOLE Larry Schneider
Improving Public Works Efficiency. Evaluating what we do: Are we doing the right work?
Glenn Archambault INTERSTATE GAS PIPELINE/ LANDOWNER/ 15 YEARS PIPELINES INFORMED PLANNING ALLIANCE BOARD MEMBER PIPELINE SAFETY TRUST MY FAVORITE HOBBY?
IOWA MUNICIPAL PROFESSIONALS INSTITUTE 2012 BEST PRACTICES IN CITY GOVERNMENT July 20, 2012 Patrick Callahan, Municipal Consultant, Snyder & Associates.
General Conditions of the Contract for Construction Articles 19 through 24 October 6, 2008.
Working Successfully With Property Managers: An Interactive Engagement
ReEntry Now They Are Coming Back!. Purpose: To promote and facilitate the timely reentry of essential response and recovery personnel, governmental officials,
NAVIGATING THE STORM Disaster Debris Management March 2014 Ice Storm Chris Marriott Deputy Director – Field Operations Department.
Westfield Public Works Department Jeremy Lollar, Director June 8, 2015.
Surface Treatment Multi Agencies Collaboration. Participating Agencies Oregon Department of Transportation Ona Beach Maintenance Section Rose Lodge Maintenance.
Former DuPont Barksdale Works Project Update December 14, 2004 DuPont Corporate Remediation Group Great Lakes Visitors Center.
Snow Removal Information Robert “Brutus” Cantoreggi, Director Carlos Rebelo, Highway and Ground Superintendent.
DOT/PF INCIDENT RESPONSE FLOOD MAY 09 DISASTER EVENT WASHTO Committee on Maintenance.
Huntsville Planning Commission Meeting Presentation on Use of Town Street Property Revision One September 3, 2006.
Brentwood of Palatine Condominium Board Meeting Treasurer’s Report – Cash Position – Scorecard – Expense Contributions – Delinquencies – Remaining.
STS-FRM-003, rev. 1, 12/7/07 April Department of Street Services Management Review April
Struck-By Hazards. Crane Tip Over and Failure Incidents Soft Ground Inadequate outrigger support Overload Crane out of level Boom strike.
PUBLIC INPUT SESSION OCTOBER 27, 2015 City of Asbury Sun Valley Dr. and Sun Ridge Ct. Reconstruction Project.
Accident Prevention Manual for Business & Industry: Engineering & Technology 13th edition National Safety Council Compiled by Dr. S.D. Allen Iske, Associate.
Salt Lake City City Council Briefing February 24, 2015 Ground Mounted Utility Boxes.
PUBLIC INPUT SESSION NOVEMBER 10, 2015 City of Asbury Birchwood Drive Reconstruction Project.
General Tab Project, Cost Schedule, and Work Limits Roadway Character
Log dumps, Ponds and Yards Section L of the Forest Activities Code.
SESSION Texas Counties under State of Emergency as of May 25th 58 Tornadoes this month Ft. Worth area May 2015 Weather Tornadoes, Storms, & County.
The Pipeline Safety Trust “Restoring Trust In Pipeline Safety” New Orleans, LA November 2-3, 2006 Nate Muehl Damage Prevention & ROW Relations Manager.
City of New Brighton Department of Public Works City Services Task Force Presentation April 17, 2003.
Town of Oro Valley Oro Valley Stormwater Utility Commission Overview.
1. Accurate & Timely intelligence shared by all 2. Effective tactics and strategies 3. Rapid deployment of resources 4. Relentless follow-up and assessment.
Strategic Planning Update Retreat Held on August 16, 2012.
FY 2017 BudgetHearing September 8, 2016 Mike Loftin, Assistant City Manager - Finance 1.
Tehama County Public Works Department “ National Public Works Week” Board of Supervisors Presentation May 10, 2016 Gary B. Antone, PE, PLS Director.
High Potential – Worker Injured While Resting Under the Vehicle
2nd Street Drainage and Paving Improvements
Roads Operations, Public Works
MINE HAZARD TRAINING FOR CONTRACT TRUCKERS
Pothole Patching Alternatives
Solid Waste Service Update
NORTH TRUNK SEWER REPLACEMENT PROJECT
Emergencies & Emergency Response
Project Manager Best Practices Workshop ASA Metro Washington
City of Clarksville Fleet Maintenance Division City Garage
Elements of Effective Signal Maintenance
Vehicle & Equipment Maintenance/Cleaning
Public Works 2020 Budget and CIP Review.
Presentation transcript:

1 Public Works Operations March 11, 2008

2 Streets – Street Sweeper Warranty repair in February resulted in about 5 weeks of downtime Streets are Dirty – Plan developed for sweeping the worst first – 20% through the City Future Downtime for Repairs – City’s Chief Mechanic changed vendor for better turn- around – Sweeper rental during repair

3 Streets – Shoulders Contracting out ditch line repair on Manassas Drive and Euclid Staff will repair shoulders after contractor is finished.

4 Streets – Cut Repairs “Cold Patch” used in cold weather (< 50° F) – Soft and needs to be revisited during cold months Hot asphalt patching when temperatures > 50° F for several days.

5 Buildings and Grounds - Graffiti City owned property and easements resolved quickly Contacted owners of unoccupied homes – City liability for potential damage Graffiti Ordinance (Public Hearing tonight) – Requires private property owners to remove graffiti within a specified period of time HOA’s – City provides materials for organized community cleanup

6 Water and Sewer – Repair of Breaks Twelve water line breaks to Repairs require at least 7 crew workers on- site for coverage of all activities – Safety and efficiency Numerous activities involved in repair – Staging the site (signage, tools, equipment, shoring) jack hammering – Closing valves to isolate the area of the break and hydrant flushing after the repair

7 Water and Sewer – Repair of Pipeline Breaks (Con’t) – Loading and hauling to and from the site 1 backhoe on site with operator 2 dump trucks with 1 driver each 1 skid loader with operator at PW yard – Delivery of parts and notifying affected residents of outage – Safety (placement of shoring box, watch for soil sloughing, traffic control, rescue, flagging)

8 Fleet Maintenance Turning City Vehicles around in less than 4 hours, unless major repair Priorities – Support of snow removal operations, debris clearing – Police Cruisers