4-1 Copyright © 2004 by Nelson, a division of Thomson Canada Limited. Activity-Based Accounting 4 PowerPresentation® prepared by David J. McConomy, Queen’s.

Slides:



Advertisements
Similar presentations
Chapter 3 Activity-Based Management. 2 Activity-based Costing & Management (ABCM) (Slide 1 of 4) ABCM rests on this premise: –Products and services require/consume.
Advertisements

Systems Design: Activity-Based Costing
7-1 Copyright © 2004 by Nelson, a division of Thomson Canada Limited. Support Department Cost Allocation 7 PowerPresentation® prepared by David J. McConomy,
ACCT 2302 Fundamentals of Accounting II Spring 2011 Lecture 9 Professor Jeff Yu.
1 PowerPointPresentation by PowerPoint Presentation by Gail B. Wright Professor Emeritus of Accounting Bryant University © Copyright 2007 Thomson South-Western,
Copyright © 2009 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin Chapter 5 Activity-Based Costing and Management.
Activity Based Costing: A Tool to Aid Decision Making
McGraw-Hill /Irwin Copyright © 2008 by The McGraw-Hill Companies, Inc. All rights reserved. Supplementary Slides - Activity Based Costing Systems Design:
Activity Based Costing
Activity Based Costing: A Tool to Aid Decision Making Chapter 8.
5 - 1 ©2003 Prentice Hall Business Publishing, Cost Accounting 11/e, Horngren/Datar/Foster Activity-Based Costing and Activity-Based Management Chapter.
ACTIVITY BASED COSTING. Learning Objectives Discuss the importance of unit costs Describe the functional-based costing approach Explain why functional-based.
5 - 1 Activity-Based Costing and Activity-Based Management Chapter 5.
16-1 Copyright  Houghton Mifflin Company. All rights reserved. Chapter 16 Operating Costs and Cost Allocation, Including Activity-Based Costing Belverd.
1 ACTIVITY-BASED COSTING Chapter 7 Accounting Principles II AC Fall Semester, 1999.
Activity-Based Costing Chapter 9 Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved.McGraw-Hill/Irwin.
Cost Management in an Automated Business Environment (ABC, and TQM) Chapter 6.
COST MANAGEMENT Accounting & Control Hansen▪Mowen▪Guan COPYRIGHT © 2009 South-Western Publishing, a division of Cengage Learning. Cengage Learning and.
0 CHAPTER 6 Activity-Based Costing © 2009 Cengage Learning.
Copyright © 2008 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin 4 Activity-Based Costing Systems.
Product Costing Process Costing Job Order Allocates costs to products
Activity-Based Costing and Analysis
Chapter Seven Activity-Based Costing and Management
© The McGraw-Hill Companies, Inc., 2005 McGraw-Hill/Irwin 17-1 JOB ORDER COST SYSTEMS AND OVERHEAD ALLOCATIONS Chapter 17.
© The McGraw-Hill Companies, Inc., 2008 McGraw-Hill/Irwin Financial & Managerial Accounting The Basis for Business Decisions FOURTEENTH EDITION Williams.
McGraw-Hill /Irwin Copyright © 2008 by The McGraw-Hill Companies, Inc. All rights reserved. Management Accounting Lecture 8 (Chapter 3) Systems Design:
The McGraw-Hill Companies, Inc. 2006McGraw-Hill/Irwin 4 Activity-Based Costing Systems.
12-1 Activity- Based Costing Prepared by Douglas Cloud Pepperdine University Prepared by Douglas Cloud Pepperdine University.
Activity-Based Costing and Management
Copyright © 2008 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin Chapter 5 Activity-Based Costing.
1 Activity-Based Costing and Activity-Based Management
Activity Based Costing: A Tool to Aid Decision Making
4-1 HANSEN & MOWEN Cost Management ACCOUNTING AND CONTROL.
1 Module19 Assigning Indirect Costs: Activity-Based Costing (omit pp to 19-13)
5 - 1 ©2003 Prentice Hall Business Publishing, Cost Accounting 11/e, Horngren/Datar/Foster Activity-Based Costing and Activity-Based Management.
Chapter 4 Product Costing for Management Decisions: Activity-Based Costing and Activity-Based Management.
Activity Accounting: Another Way to Measure Costs
Activity Based Costing: A Tool to Aid Decision Making
Lecture 18. Lecture Overview Process Costing Equivalent Units Practice Questions Operations costing Practice Questions.
Activity-Based Costing and Analysis
Chapter 2 Cost Concep Chapter 2 Cost Concepts and Cost Allocation Fall 2007 Crosson.
Cost Allocation and Activity-Based Costing Student Version.
Financial and Managerial Accounting Wild, Shaw, and Chiappetta Fifth Edition Wild, Shaw, and Chiappetta Fifth Edition McGraw-Hill/Irwin Copyright © 2013.
©2013 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part.
When cost systems were developed in the 1800s, the emphasis was on simplicity because: 1. Cost and activity data had to be collected by hand and all calculations.
Activity-Based Costing
4 -1 Activity-Based Costing CHAPTER Discuss the importance of unit costs. 2.Describe functional-based costing approaches. 3.Explain why functional-based.
© 2014 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part, except for use as permitted in a license.
2-1 Copyright © 2004 by Nelson, a division of Thomson Canada Limited. Basic Management Accounting Concepts 2 PowerPresentation® prepared by David J. McConomy,
Chapter 4-1 Don R. Hansen Maryanne M. Mowen Nabil S. Elias David W. Senkow MANAGEMENT ACCOUNTING Copyright 2001 Nelson Thomson Learning.
Copyright © 2013 Nelson Education Ltd. PowerPoint Presentations for Cornerstones of Cost Accounting First Canadian Edition Adapted by George Gekas Ryerson.
Activity-Based Costing and Management
Activity-Based Costing and Management Management Accounting: The Cornerstone for Business Decisions Copyright ©2006 by South-Western, a division of Thomson.
Financial and Managerial Accounting Wild, Shaw, and Chiappetta Fourth Edition Wild, Shaw, and Chiappetta Fourth Edition McGraw-Hill/Irwin Copyright © 2011.
Financial and Managerial Accounting Wild, Shaw, and Chiappetta Fifth Edition Wild, Shaw, and Chiappetta Fifth Edition McGraw-Hill/Irwin Copyright © 2013.
4 -1 Activity-Based Costing CHAPTER Discuss the importance of unit costs. 2.Describe functional-based costing approaches. 3.Explain why functional-based.
Activity Based Costing Nancy R. Mangold Professor, Department of Accounting California State University, East Bay.
© 2013 John Wiley & Sons, Ltd, Accounting for Managers, 1Ce, Ch 11 1.
© The McGraw-Hill Companies, Inc., 2002 McGraw-Hill/Irwin Accounting Systems For Measuring Costs Chapter 17.
Welcome Back Atef Abuelaish1. Welcome Back Time for Any Question Atef Abuelaish2.
Copyright © 2010 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin Job Order Cost Systems and Overhead Allocations Chapter 17.
Copyright © 2006, The McGraw-Hill Companies, Inc.McGraw-Hill/Irwin 11 th Edition Chapter 8.
Copyright © 2008 The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin 4 Activity-Based Costing Systems.
Activity-Based Costing
Financial & Managerial Accounting 2002e
Activity-Based Costing and Activity-Based Management
“Cost Driver” (the activity) Owning a car
Activity-Based Costing
Activity-Based Costing Chapter 3
Activity-Based Costing
Presentation transcript:

4-1 Copyright © 2004 by Nelson, a division of Thomson Canada Limited. Activity-Based Accounting 4 PowerPresentation® prepared by David J. McConomy, Queen’s University

4-2 Copyright © 2004 by Nelson, a division of Thomson Canada Limited. Learning Objectives l Discuss the importance of unit costs to managers’ decisions. l Describe functional-based costing approaches. l Explain why functional-based costing approaches may produce distorted costs.

4-3 Copyright © 2004 by Nelson, a division of Thomson Canada Limited. Learning Objectives (continued) l Explain how an activity-based costing system works. l Provide a detailed description of how activities can be grouped into homogeneous sets to reduce the number of activity rates.

4-4 Copyright © 2004 by Nelson, a division of Thomson Canada Limited. l Describe activity-based customer and supplier costing. Learning Objectives (continued)

4-5 Copyright © 2004 by Nelson, a division of Thomson Canada Limited. Unit Costs The unit cost is the total cost associated with the units produced divided by the number of units produced Although the concept is simple, the practical reality ofthe computation can be somewhat more complex because of the following issues: –What is meant by “total cost”? –How do we measure the costs to be assigned? –How do we assign costs to the product?

4-6 Copyright © 2004 by Nelson, a division of Thomson Canada Limited. Unit Costs (continued) Unit costs are important for: l inventory valuation l income determination l providing input to a variety of decisions such as pricing, make or buy, and accept or reject special orders

4-7 Copyright © 2004 by Nelson, a division of Thomson Canada Limited. Measurement Systems Two possible measurement systems are actual costing and normal costing. Actual costing assigns the actual costs of direct materials, direct labour, and overhead to products. Normal costing assigns the actual costs of direct materials and direct labour to products; however, overhead cots are assigned to products using predetermined rates.

4-8 Copyright © 2004 by Nelson, a division of Thomson Canada Limited. Activity Capacity Measures Units (of driver) Theoretical Practical Expected actual Normal Time

4-9 Copyright © 2004 by Nelson, a division of Thomson Canada Limited. Functional-Based Costing: Plantwide Rate Overhead Costs Assign Costs Plantwide Pool Cost Assignment Products Direct Tracing Stage One: Pool Formation Unit-Level Driver Stage Two: Costs Assigned

4-10 Copyright © 2004 by Nelson, a division of Thomson Canada Limited. Belring, Inc. Belring, Inc. produces two telephones: a cordless and a regular model. The company has the following estimated and actual data: Budgeted overhead $360,000 Expected activity (DLH) 100,000 Actual overhead $380,000 Actual activity (DLH) 100,000

4-11 Copyright © 2004 by Nelson, a division of Thomson Canada Limited. Belring, Inc. (continued) Predetermined Overhead Rate= Budgeted overhead  Expected activity =$360,000  100,000 DLH =$3.60 per DLH

4-12 Copyright © 2004 by Nelson, a division of Thomson Canada Limited. Belring, Inc. (continued) CordlessRegular Units produced10,000100,000 Prime costs$78,000$738,000 Direct labour hours10,00090,000

4-13 Copyright © 2004 by Nelson, a division of Thomson Canada Limited. Belring, Inc. – Unit Cost Computation: Plantwide Rate CordlessRegular Prime costs$ 78,000$ 738,000 Overhead costs: $3.60 x 10,00036, $3.60 x 90, ,000 Total mfg. costs$114,000$1,062,000 Units produced  10,000  100,000 Unit cost$ 11.40$ ===============

4-14 Copyright © 2004 by Nelson, a division of Thomson Canada Limited. Functional-Based Costing: Departmental Rates Overhead Costs Assign Costs Department A Pool Assign Costs Products Department B Pool Assign Costs Products Stage One: Pool Formation Unit-Level Drivers Stage Two: Costs Assigned

4-15 Copyright © 2004 by Nelson, a division of Thomson Canada Limited. Belring, Inc. – Departmental Data FabricationAssembly Budgeted OH$252,000$108,000======= Expected and actual usage (DLH): Cordless7,0003,000 Regular13,00077,000 20,00080,000===== Expected and actual usage (MH): Cordless9,0001,000 Regular36,000 4,000 45,0005,000=====

4-16 Copyright © 2004 by Nelson, a division of Thomson Canada Limited. Belring, Inc. – Departmental Rates Overhead Rates: Fabrication Rate=Budgeted OH / Expected MH =$252,000/45,000 =$5.60 per fabrication MH Assembly Rate=Budgeted OH / Expected DLH =$108,000/80,000 =$1.35 per assembly DLH

4-17 Copyright © 2004 by Nelson, a division of Thomson Canada Limited. Belring, Inc. – Unit Cost Computation: Departmental Rate CordlessRegular Prime costs$ 78,000$738,000 Overhead costs: ($5.60 x 9,000) + ($1.35 x 3,000) 54, ($5.60 x 36,000) + ($1.35 x 77,000) ,500 Total mfg. costs$132,450$1,043,550 Units produced  10,000  100,000 Unit cost$ 13.25$ ===============

4-18 Copyright © 2004 by Nelson, a division of Thomson Canada Limited. Symptoms of an Outdated Functional Cost System l The outcome of bids is difficult to explain. l Competitors’ prices appear unrealistically low. l Products that are difficult to produce show high profits. l Operational managers want to drop products that appear profitable. l Profit margins are difficult to explain.

4-19 Copyright © 2004 by Nelson, a division of Thomson Canada Limited. Symptoms of an Outdated Functional Cost System (continued) l The company has a highly profitable niche all to itself. l Customers do not complain about price increases. l The accounting department spends a lot of time supplying cost data for special projects. l Some departments are using their own accounting system. l Product costs change because of changes in financial reporting regulations.

4-20 Copyright © 2004 by Nelson, a division of Thomson Canada Limited. Belring, Inc.– Activity Usage CordlessRegularTotal Units produced per year10,000100,000110,000 Prime costs$78,000$738,000$816,000 Direct labour hours10,00090,000100,000 Machine hours10,00040,00050,000 Production runs Number of moves603090

4-21 Copyright © 2004 by Nelson, a division of Thomson Canada Limited. Belring, Inc. – Additional OH Cost Data ActivityActivity Cost Setups$120,000 Material handling60,000 Machining100,000 Testing 80,000 Total$360,000 =======

4-22 Copyright © 2004 by Nelson, a division of Thomson Canada Limited. ABC: Two-Stage Assignment Cost Of Resources Assign Costs Activities Assign Costs Products Direct Tracing Driver tracing Driver Tracing

4-23 Copyright © 2004 by Nelson, a division of Thomson Canada Limited. Belring, Inc. – Activity Rates Activity rates are computed below: Setup rate:$120,000/30 = $4,000 per run Material-handling rate:$60,000/90 = $ per move Machining rate:$100,000/50,000 = $2 per MH Testing rate:$80,000/100,000 = $0.80 per DLH

4-24 Copyright © 2004 by Nelson, a division of Thomson Canada Limited. Belring, Inc. – Activity-Based Costing Unit Cost Computation CordlessRegular Prime costs$ 78,000$ 738,000 Overhead costs: Setups80,00040,000 Material handling40,00020,000 Machining20,00080,000 Testing 8,000 72,000 Total mfg. costs$226,000$ 950,000 Units produced  10,000  100,000 Unit cost$ 22.60$ 9.50=====

4-25 Copyright © 2004 by Nelson, a division of Thomson Canada Limited. Comparison of Unit Costs CordlessRegular Activity based unit cost Functional based unit cost: Plantwide rate$11.40$10.62 Departmental rate

4-26 Copyright © 2004 by Nelson, a division of Thomson Canada Limited. Activity Categories Unit-level activities are those performed each time a unit is produced. Examples: Power and machine hours are used each time a unit is produced. Direct materials and direct labour activities are also unit-level activities, even though they are not overhead costs.

4-27 Copyright © 2004 by Nelson, a division of Thomson Canada Limited. Activity Categories (continued) Batch-level activities are those performed each time a batch of products is produced. Examples: Setups, inspections, production scheduling, and material handling.

4-28 Copyright © 2004 by Nelson, a division of Thomson Canada Limited. Activity Categories (continued) Product-level (sustaining) activities are those performed as needed to support the various products produced by a company. These activities consume inputs that develop products or allow products to be produced and sold. Examples: Engineering changes, development of product testing procedures, marketing a product and process engineering.

4-29 Copyright © 2004 by Nelson, a division of Thomson Canada Limited. Activity Categories (continued) Facility-level activities are those that sustain a factory's general manufacturing processes. Examples: Plant management, landscaping, support of community programs, security, property taxes, and plant amortization.

4-30 Copyright © 2004 by Nelson, a division of Thomson Canada Limited. ABC Customer Costing Use Customer as Cost Object Diversity Issues:  Order Frequency  Delivery Frequency  Geographic Distances  Sales and Promotional Support  Engineering Support

4-31 Copyright © 2004 by Nelson, a division of Thomson Canada Limited. ABC Customer Costing Use Customer as Cost Object Used For: Pricing Customer Mix Improving profitability

4-32 Copyright © 2004 by Nelson, a division of Thomson Canada Limited. ABC Supplier Costing Use Supplier as Cost Object Relating To: Purchase Cost Quality Supplier Reliability Delivery Performance