1 Module19 Assigning Indirect Costs: Activity-Based Costing (omit pp. 19-1 to 19-13)

Slides:



Advertisements
Similar presentations
Activity Based Costing: A Tool to Aid Decision Making
Advertisements

Activity-Based Cost Systems
ACTG 6310 Chapter 11 – Criticisms of Absorption Cost Systems: Inaccurate Product Costs.
Copyright © 2006, The McGraw-Hill Companies, Inc.McGraw-Hill/Irwin Activity-Based Costing: A Tool to Aid Decision Making Chapter Eight.
ACCT 2302 Fundamentals of Accounting II Spring 2011 Lecture 9 Professor Jeff Yu.
Activity Based Costing: A Tool to Aid Decision Making 3/24/04
ABC Software Development Part 1 Summit Business Consultants.
Cost Allocation Concepts Managerial Accounting Prepared by Diane Tanner University of North Florida Chapter 35.
Activity Based Costing: A Tool to Aid Decision Making
Activity Based Costing
CHAPTER 5 Activity-Based Costing and Activity-Based Management.
Activity Based Costing: A Tool to Aid Decision Making Chapter 8.
5 - 1 ©2003 Prentice Hall Business Publishing, Cost Accounting 11/e, Horngren/Datar/Foster Activity-Based Costing and Activity-Based Management Chapter.
ACTIVITY BASED COSTING. Learning Objectives Discuss the importance of unit costs Describe the functional-based costing approach Explain why functional-based.
8 Activity-Based Costing Chapter Machining Assembly  a cost system refinement  more overhead cost pools.
5 - 1 Activity-Based Costing and Activity-Based Management Chapter 5.
Activity Based Costing: A Tool to Aid Decision Making 11/16/04 Chapter 8.
16-1 Copyright  Houghton Mifflin Company. All rights reserved. Chapter 16 Operating Costs and Cost Allocation, Including Activity-Based Costing Belverd.
Activity-Based Costing: A Tool to Aid Decision Making
7-1 Designing Product Cost Systems C hapter 7 Prepared by Douglas Cloud Pepperdine University.
5 - 1 ©2003 Prentice Hall Business Publishing, Cost Accounting 11/e, Horngren/Datar/Foster Activity-Based Costing and Activity-Based Management Chapter.
Activity-Based Costing Chapter 9 Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved.McGraw-Hill/Irwin.
0 CHAPTER 6 Activity-Based Costing © 2009 Cengage Learning.
Copyright © 2008 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin 4 Activity-Based Costing Systems.
PowerPoint Authors: Susan Coomer Galbreath, Ph.D., CPA Charles W. Caldwell, D.B.A., CMA Jon A. Booker, Ph.D., CPA, CIA Cynthia J. Rooney, Ph.D., CPA Copyright.
© 2014 by McGraw-Hill Education. This is proprietary material solely for authorized instructor use. Not authorized for sale or distribution in any manner.
1 Copyright  2010 & 2007 McGraw-Hill Australia Pty Ltd PPTs t/a Accounting: What the Numbers Mean 2e (revised) by Marshall, McCartney & Van Rhyn PowerPoint.
Product Costing Process Costing Job Order Allocates costs to products
Activity-Based Costing and Analysis
Accounting Systems for Manufacturing Businesses Chapter 10.
13-1 CHAPTER 13 McGraw-Hill/Irwin © 2008 The McGraw-Hill Companies, Inc., All Rights Reserved. Cost Accounting and Reporting Systems.
© The McGraw-Hill Companies, Inc., 2005 McGraw-Hill/Irwin 17-1 JOB ORDER COST SYSTEMS AND OVERHEAD ALLOCATIONS Chapter 17.
© The McGraw-Hill Companies, Inc., 2008 McGraw-Hill/Irwin Financial & Managerial Accounting The Basis for Business Decisions FOURTEENTH EDITION Williams.
Chapter 8 Activity-Based Costing. 8-2 Learning Objectives 4.Explain how activity-based costing and a two-stage product system are related. 2.Explain how.
The McGraw-Hill Companies, Inc. 2006McGraw-Hill/Irwin 4 Activity-Based Costing Systems.
© 2016 Pearson Education, Inc.
1 Activity-based costing. 2 Introduction In the past, overhead costs were relatively small, and the problems arising from inappropriate overhead allocations.
Copyright © 2008 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin Chapter 5 Activity-Based Costing.
1 Activity-Based Costing and Activity-Based Management
Activity Based Costing: A Tool to Aid Decision Making
Copyright 1998 Dekker, Ltd. 1. Copyright 1998 Dekker, Ltd. 2.
ActivityBased Costing Systems Dr. Nancy Mangold California State University, East Bay.
5 - 1 ©2003 Prentice Hall Business Publishing, Cost Accounting 11/e, Horngren/Datar/Foster Activity-Based Costing and Activity-Based Management.
Chapter 4 Product Costing for Management Decisions: Activity-Based Costing and Activity-Based Management.
Activity Based Costing: A Tool to Aid Decision Making
Copyright © 2012 The McGraw-Hill Companies, Inc. PowerPoint Authors: Susan Coomer Galbreath, Ph.D., CPA Charles W. Caldwell, D.B.A., CMA Jon A. Booker,
©2013 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part.
Accounting for Factory Overhead
Activity-Based Costing. Over- and Undercosting Overcosting – a product consumes a low level of resources (costs) but is allocated high costs per unit.
1 Chapter 7- Cost Management Systems-ABC. M11-Chp-08-1-Cost-Mgt-Systems-ABC Summer, Edited May 23, Copyright © 2011, Dr. Howard Godfrey.
4 -1 Activity-Based Costing CHAPTER Discuss the importance of unit costs. 2.Describe functional-based costing approaches. 3.Explain why functional-based.
Activity Based Costing Nancy R. Mangold Professor, Department of Accounting California State University, East Bay.
© The McGraw-Hill Companies, Inc., 2002 McGraw-Hill/Irwin Accounting Systems For Measuring Costs Chapter 17.
Copyright © 2010 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin Job Order Cost Systems and Overhead Allocations Chapter 17.
Copyright © 2008 The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin 4 Activity-Based Costing Systems.
McGraw-Hill/Irwin © 2007 The McGraw-Hill Companies, Inc., All Rights Reserved CHAPTER 13 McGraw-Hill/Irwin © 2007 The McGraw-Hill Companies, Inc.,
McGraw-Hill/IrwinCopyright ©2008 The McGraw-Hill Companies, Inc. All rights reserved. Activity-Based Costing Chapter 9.
Activity-Based Costing
Allocation of Indirect Costs
Activity-Based Costing
Activity-Based Costing
Activity-Based Costing and Activity-Based Management
Activity Based Costing: A Tool to Aid Decision Making
MSE608C – Engineering and Financial Cost Analysis
Activity Based Costing - ABC
Activity-Based Costing
Activity-Based Costing Systems
Module 19 Activity-Based Costing, Customer Profitability, and Activity-Based Management © Cambridge Business Publishers, 2018.
Activity Based Costing (ABC)
Presentation transcript:

1 Module19 Assigning Indirect Costs: Activity-Based Costing (omit pp to 19-13)

2 Activity-Based Costing Activity-based costing system - A product costing system in which costs are assigned to products or services on the basis of their consumption of an organization’s fundamental activities. Activities consume resources, and costs should be assigned based on resource consumption. Relative to traditional cost accounting, in activity-based costing: –Non-manufacturing as well as manufacturing costs may be assigned to products. –Some manufacturing costs may be excluded from product costs. –There are a number of cost pools, each of which is allocated to products and other cost objects using its own unique measure of activity. –The allocation bases (cost drivers) often differ from those used in traditional costing systems.

3 Identifying Activities Cost pools are created for different overhead activities, and costs are allocated based on the levels of the various activities incurred (as compared to one basis for all overhead in a traditional allocation). Examples of costs pools: Machining costs: depreciation, maintenance, fuel - allocated on the basis of machine hours. Production set-up costs allocated on the basis of the number of set-ups required. Manufacturing plant: if allocated, allocated on basis of square footage. Purchasing department costs allocated on the basis of the number of purchase orders. Shipping department costs allocated based on the pounds shipped (or number of trucks shipped).

4 Traditional Cost Accounting Versus ABC Relative to traditional cost accounting, in activity-based costing: –Non-manufacturing as well as manufacturing costs may be assigned to products. –Some manufacturing costs may be excluded from product costs. –There are a number of cost pools, each of which is allocated to products and other cost objects using its own unique measure of activity. –The allocation bases (called cost drivers) often differ from those used in traditional costing systems.

5 Benefits of ABC Benefits: –Provides more accurate cost information for products and services, based on resources consumed. –Allows managers to make better decisions regarding product mix, make or buy, pricing strategies. –Enables companies to better control costs, because ABC indicates the specific drivers that causes costs to be incurred. Types of companies that benefit from ABC: –Those with a high potential for cost distortion (diverse products that consume resources differently). –Highly automated companies, with a high level of overhead in proportion to direct material and direct labor costs.

6 Limitations of ABC Limitations: –High cost of implementation – must define cost pools and cost drivers, and keep up with the cost activity with greater specificity. –Minimal benefits to companies that cannot set pricing decisions, or for companies where the products/services consume similar proportions of resources.

7 Steps in Implementing Activity-Based Costing 1.Identify and define activities and activity pools. 2.Whenever possible, directly trace costs to activities and products (DM and DL). 3.Assign indirect costs to activity cost pools. 4.Calculate overhead application rates for each activity. 5.Assign overhead costs to products using the application rates and activity levels for each product. Now look at class example (handout).

8 Class Problem No. 1 XYZ company uses activity based costing and has calculated the following cost driver rates for its overheads: Machine set up costs$1,500 per set up Processing$4 per machine run Shipping and handling costs$600 per delivery It receives an order to supply 3,000 units of its product, Zyx, to a customer. The product will be made over the next several months. Completion of this order will require 6 set ups, 2 machine runs per unit, and 20 deliveries. Calculate the amount of total overhead cost per unit relating to this order. (Note: Include shipping and handling in the total cost.)

Class Problem 1 Solution Total overhead for 3,000 units: 6 setups x $1,500 = $ 9,000 3,000 x 2 machine runs x $4 = $24, deliveries x $600 = $12,000 Total overhead= $45,000 OH cost per unit= 45,000/3,000 = $15.00