A layman’s guide to the structure of LDZ gas charges 27 July 2009 Please note – in the interests of clarity and accessibility, simplifications have been.

Slides:



Advertisements
Similar presentations
MATERIAL STORAGE SYSTEMS Gülşah GEDİK
Advertisements

Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
RIIO-T1 impact on allowed revenues and network charges 6 September 2012.
A DNO Perspective by Stephen Parker for Structure of Charges Workshop 15 July 2003.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
EU Tariff Code Update 23 rd June EU Tariff Code Update – early feedback  Informal ACER feedback:  Draft code not on line with FG and insufficient.
Sampling distributions. Example Take random sample of students. Ask “how many courses did you study for this past weekend?” Calculate a statistic, say,
Distribution Charging Methodologies Forum DCC Charging Methodology 4 th April 2013.
McGraw-Hill/Irwin © 2003 The McGraw-Hill Companies, Inc., All Rights Reserved. Chapter 10 The Role of Costs in Pricing Decisions.
Advanced Costing - ABC Activity Based Costing
CSEP Transportation Charges 11 th August Background Action NEX0604 from 18 th June PN UNC requested Xoserve to provide a presentation on how Supply.
DESIGN GUIDE FOR GAS CENTRALISED HOT WATER SYSTEMS
Exit Reform Review Transmission Workstream 07 January 2010.
United Nations Statistics Division/DESA International Recommendations for the Index of Industrial Production (IIP)
Overview Introduction Setting up the Model
Introduction The previous lesson discussed how to calculate a sample proportion and how to calculate the standard error of the population proportion. This.
Xoserve sense checks & validation Reasonable Endeavours Claims.
IB Business and Management
Update on transit compensation mechanism application in Baltics Arnis Staltmanis Head of International Project Department 16 September 2009, Vilnius.
Shrinkage Forum Monday 27 June 2011, 31 Homer Road.
VENCorp Revenue Proposal 1 July 2008 to 30 June 2014 Initial Public Forum Presentation.
Gas Development Master Plan Overview of the GDMP Model Capacity Building Workshop Bali, 1-2 July 2013.
The Entry Capacity Transfer & Trade Methodology Statement Transmission Workstream
3rd ICP 2011 Technical Advisory Group Meeting at the OECD, Paris 10, 11 June 2010.
DN Update 24 th May 2007 LDZ System Charges Capacity/Commodity Split and Interruptible Discounts.
UNC G7.3.7 Invoicing Read Estimation Proposal Requirement for Read Estimation & Proposed Methodology Dean Johnson Distribution Workstream – 25 th August.
National Grid UK Distribution Update Gas Customer Forum 29 th January 2007 Kerri Matthews.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Importance Of Water Water is life. Living on the earth may be impossible without adequate water quality and quantity. Water makes up more than half of.
LDZ System Charges – Structure Methodology 26 April 2010.
DNPC06 LDZ NEC Charges Denis Aitchison 25 th January 2010.
Governance and Charging Methodology for User Pays Services 10 th January 2007.
DNPD04 LDZ Exit Capacity Charges- Discussion Report Denis Aitchison 27 th July 2009.
Presented by : Steven J Edwards, Head of Income and Pricing, Wales & West Utilities GDN Allowed and collected revenue awareness presentation for Shippers.
Allocation of Unidentified Gas Statement 2013/14 6 th February 2012.
DNPC08 Review of Standard LDZ System Charges 6 September 2010.
Billing Operations Forum 24 July 2007 RbD Overview Billing Operations Forum 24 July 2007 RbD Overview Fiona Cottam.
1 v1 iGT CSEP Billing Solution ScottishPower Proposals April 08.
Customer Charge On behalf of all DNs 25 October 2010.
Gas Distribution Transportation Charging What are the Risks to Pricing predictability? Stephen Marland Pricing Manager
Leakage Model Development Proposals – Shrinkage Forum Discussion Wednesday 14 December 2011.
Allocation of Unidentified Gas Statement 2014/15 15 th May 2013.
Demand Side Investment Planning Transmission Planning Code Workshop 2 1 st May 2008.
DNPC08 Review of Standard LDZ System Charges Consultation Responses 25 October 2010.
Trades and Transfers Workshop, 6 th November 2007.
Mod 0428 Charge Impact October Affected Supply Point Population.
Modification Proposal 0435: Arrangements to better secure firm gas supplies for GB customers Initial Workgroup discussion 1 November 2012.
Default price-quality paths for gas pipeline services Briefing on the Commission’s final decision for financial market analysts 28 February 2013.
Conducting a research project. Clarify Aims and Research Questions Conduct Literature Review Describe methodology Design Research Collect DataAnalyse.
Transmission Pricing Webinar 12 October Agenda for Webinar Introductions Purpose Potential Areas of Change – Overview –Revenue Proposal –Business.
Alternative Approach to Enduring Exit Flat Capacity & Revenue Recovery Gas TCMF 14 th December 2006.
Proposal to modify Standard Special Conditions A4, A5 and D11 of the Gas Transporter licence Distribution Charging Methodology Forum (DCMF) 13 August 2007.
DNPC05 Consultation Paper Balance of Revenue Recovery between LDZ System Charges and Customer Charges Steve Armstrong 27 th July 2009.
Customer Charge On behalf of all DNs 19 November 2010.
Background Current balance of LDZ System and Customer charges
UNC Modification Proposal 0202 National Grid Distribution
DNPC03 DNPC03, published in July 2007, changed the LDZ System Charges Capacity/Commodity split from 50:50 to 95:5 The 95:5 split was implemented on 1 October.
The Role of Costs in Pricing Decisions
Introduction The previous lesson discussed how to calculate a sample proportion and how to calculate the standard error of the population proportion. This.
Cost Allocation review – CoMC update July 18
LDZ System Charges – Structure Methodology 26 July 2010
Sampling.
DNPC06 From 1 October 2012 the DNs will pay the NTS Exit Capacity charges to the NTS and recover the cost from shippers DNPC06 put forward for consultation.
The Proposals Restructure the LDZ system charges target capacity/commodity split from 50:50 to 95:5 Introduce partial capacity charges for Interruptible.
Presentation on behalf of all DNs Lorraine Goodall - SGN
Additional Gemini API’s UK Link - Class 3 Modification
Pricing and Margins Manager National Grid Distribution
Charging For Active Network Management / Flexible Connections
Presentation transcript:

A layman’s guide to the structure of LDZ gas charges 27 July 2009 Please note – in the interests of clarity and accessibility, simplifications have been made in the presentation that follows, and so whilst it provides a reasonable overview of the concepts underlying the methodology, it is not held out to be a definitive description of the methodology and should not be relied upon.

Charging Structures Charges are structured to recover different types of DN costs in different quantities from different consumers… Therefore there are 2 elements to the structure of charges: 1. Cost Type 2. Customer Type Once the total revenue required to recover a particular type of cost has been ascertained, then you can consider how it should be recovered across customers

Principles for allocating by Customer Type LDZ System Charges The costs recovered here are for operating the system so should be applied to those who utilise the system. Those who utilise more of the system than others should pay more… Those who want to make use of a larger capacity entitlement within the network should also pay more than those who need a smaller capacity.

How costs are allocated across network… Some costs are easy to identify – e.g. activities only performed on the LTS can be allocated entirely to the LTS. Some costs may be allocated between different types of pipe based on the relative quantity (length) of each type of pipe. Some costs may be allocated between different types of pipe based on the relative volume (capacity) flowing through each type of pipe. The Transco Activity Based Cost model provided the basis for this allocation process. NTSNTS Then these costs can be charged to the customers who make use of those pipes.

How the system is used Black pipes are small diameter pipes, which connect to bigger green pipes, which connect to the biggest red pipes. A – only make use of the red bit of the network so should pay only for the red bit. B – make use of red and green bits of the network so should pay more C – make use of red, green and black bits of the network so should contribute to the cost of all pipes. These are likely to be small consumers as they only need small diameter pipes. NTSNTS C B A Costs can be allocated to the different elements of the network, and then supply points pick up costs dependant on where they connect to the network.

How to tell who is where on the network? A sample is taken, identifying size of supply point and size of pipe attached to, for both directly connected supply points and CSEPs. Sample used to calculate probability of a supply point of a given size attaching to a given diameter and pressure of pipe Assumption that gas flows through all pipe pressures and diameters from biggest to smallest Based on sample, we estimate the likelihood that a customer of a certain size connects to different pressure tiers within the network. From this, we derive the probability-weighted likely usage of the system for a customer of a certain size From this, we derive the typical cost relating to LDZ System usage for a customer of a certain size

How costs are allocated to customers… Costs are divided across all customers in proportion to the capacity or throughput utilised. There are too many customers and too many pipes to provide individually tailored charges. Therefore the costs per unit of capacity utilised for different sizes of supply point are graphed, and suitable functions fitted to the graphs so that a trade off can be made between charges that are as cost reflective as possible but still reasonably straightforward.

Recent Developments Methodology being re-worked on a network by network basis… Customer connection profiles obtained Gas flows between pressures calculated Cost allocation criteria drafted Awaiting outcome of PC04 to confirm what costs should be included Consult on proposed methodology changes – the move from a national basis, and any other suggested adjustments that may follow on from the analysis.

Questions