Westfield Public Works Department Jeremy Lollar, Director June 8, 2015.

Slides:



Advertisements
Similar presentations
Capital Improvement Plan Financial Options September 12, 2013 Presented by: City Administration Finance Department.
Advertisements

Columbia County Road Department. Ditching Road Grading Work Performed By County Road Crews.
THE STATE OF THE CITY Presented to The League City Chamber of Commerce and Business Association February 13, 2004.
CR 236 Resurfacing from US 441 to I-75 30% Plans Alachua County Board of County Commissioners September 28, 2010.
Winter Storm ” Snowfall 20 Days of Freezing Rain.
District 2 System Preservation Projects for FY 15 and FY 16 Gregory B. Holsey - District Engineer Thomas S. Revelle - Assistant District Engineer – Project.
Columbia County Road Department Department Presentation June, 2013 By David Hill.
Sect. 12A-2 – Accessible SW Requirements ADA Clarifications: – When are curb ramps required? – What constitutes an alteration? – Does the scope of resurfacing.
Georgia DOT Local Maintenance Improvement Grant Program Todd Long, P.E., Deputy Commissioner.
ALLEGAN COUNTY PRIMARY ROAD MILLAGE AREA 2 JANUARY 21, 2014.
Howdy Folks Welcome To Golden Howdy Folks Welcome To Golden.
FY Budget May 15, 2013 Capital and Operations and Maintenance Expenditures.
Commonwealth of Kentucky Transportation Cabinet Department of Highways - District 5 The Slow Uphill Climb Matt Bullock, P.E. Chief District Engineer.
Your Roads The Future, Some History, and Alternatives For Wasco County April 23, 2013.
PUBLIC WORKS OPERATIONS: TRANSPORTATION Steve Hansen, PE Director of Public Works – Liberty, MO APWA PW Institute April 8, 2014.
CITY OF VAUGHAN Watermain Replacement and Roadworks in Kleinburg (Napier Street, John Street, Kellam Street and Stegman’s Mill Road) WELCOME TO THE KLEINBURG.
Borough of Madison Samson Avenue Reconstruction Engineering CY2012 Existing Conditions Underground Infrastructure Federal Aid SRTS Application Reconstruction.
District 2 System Preservation Projects for FY 14 and FY 15 Gregory B. Holsey - District Engineer Thomas S. Revelle - Assistant District Engineer – Project.
Highway Maintenance & Rehabilitation
THE FUTURE OF TRANSPORTATION FUNDING AN ALDOT PERSPECTIVE December 3, 2014.
Monroe County Transportation Projects 4 Local Agencies: Unincorporated Monroe County City of Key West City of Marathon Village of Islamorada District Six.
Street Maintenance. The Town of Bayfield maintains centerline miles of road.
1 Public Works Operations March 11, Streets – Street Sweeper Warranty repair in February resulted in about 5 weeks of downtime Streets are Dirty.
Alachua County Community Development Block Grant Application for Funding 1 st Public Hearing June 28, 2011.
Downtown PRESENTATION Tuesday, May 3, 2011 R/C Theaters Movies 14.
February 10, 2015 Martin Lang, MPA Deputy Director of Field Operations.
Paving for Progress Aaron D. Granquist, Project Manager, HR Green, Inc. Doug Wilson, Capital Improvement Project Manager, Cedar Rapids Handouts and presentations.
DISTRICT D and E PRESENTATION Wednesday, April 13, 2011 Hollenback Fire Station.
Department of Transportation Report on Condition of County Maintained Road System Agenda Item 53 Board of Supervisor’s Meeting April 26, 2005.
Stormwater Budget Overview Just a Reminder. Infrastructure Inventory for Stormwater Drainage System 19 Major Canal Control Structures 19 Major Canal Control.
Route 12B Safety Improvement Project New York State Department of Transportation Mark Silo, P.E. Thomas J. Madison, Jr. Regional DirectorCommissioner.
General Manager’s Recommended Budget FY 15/16 Capital Improvement Plan Public Works Department Sanitation Fund 1.
City of Springfield Office of Public Works Street & Sewer Infrastructure Analysis 1 Mayor J. Michael Houston Mark Mahoney, Director.
156 th Street Design in Bennington Public Open House Meeting October 28, 2009 City of Bennington, NE.
WEDGEWOOD COVE HOA STREET PAVING/RESURFACING PROJECT.
September 28, 2015 PUBLIC WORKS 101. sandyspringsga.gov Adopted City Priorities – FY
March 21, BUDGET PRESENTATION- ROADS CAPITAL PROJECTS WATER WASTEWATER.
Town Council President: John Weingardt Town Manager : Scott Fadness Director of Public Works: Eric Pethtel Assistant Director of Public Works: Rick Farnham.
The Highway Fund – Planning, Measuring, and Reporting Mike Holder, PE, Chief Engineer 2015 CAPA / DOT Workshop February 24, 2015.
Public Works. Strategic Plan Presentation Department Organization Strategic Goals relating to Public Works Department Issues.
Essex County Transportation Services Department Essex County Highways 2016 Construction Program Peter Bziuk P. Eng. Manager Design and Construction Services.
ORDINANCE # Authorizing $372,760 for traffic signal interconnect at 47 th Street and Emanuel Cleaver II Boulevard Start of project End of project.
Adapting to Climate Change By John Thorp. Climate Change Predictions Hotter drier Summers Milder wetter winters More extreme rainfall events Increased.
City of Joliet 2014 Proposed Budget November 2013.
Region’s Core Services 202/17/2014 Integrity ∙ Excellence ∙ Respect Provide leadership, administrative support, procurement and budgetary and financial.
SIX YEAR TRANSPORTATION IMPROVEMENT PLAN (STIP) Public Hearing.
2013 Roads and Sidewalk Capital Programs Roads and Parks Maintenance Department Development & Infrastructure Division December 2, 2013.
P UBLIC W ORKS Capital Projects P UBLIC W ORKS Construction Estimates Rule of Thumb – based on an estimated number of units (such as feet of pipe)
March  Finish Joint Sealing on Highlands Ranch Parkway  Finish Grinding on Lucent and Plaza and then Complete Joint Sealing  Start in Late.
Huston, Texas | June Jing Zhang, AICP, PTP, LCI, LEED AP ND AccommodatingCyclists in Accommodating Cyclists in Highway Maintenance Projects -- an.
Public Works Infrastructure Update Public Works Department April 5, 2016.
FY 2017 BudgetHearing September 8, 2016 Mike Loftin, Assistant City Manager - Finance 1.
CITY OF BELLEVILLE ROAD IMPROVEMENTS PROGRAM
Tehama County Public Works Department “ National Public Works Week” Board of Supervisors Presentation May 10, 2016 Gary B. Antone, PE, PLS Director.
Agenda Updates to Driveway and Sidewalk specifications and permits
The Gainesville Area Chamber Infrastructure Investment Initiative
Pothole Patching Alternatives
Budget Overview: Public Works Department
Street Improvement Plan
Pavement condition index calculation
Road Improvement Presentation
Looking for best Landscape Design London Ontario service -
Transportation Projects
Public works 2019 budget review.
Agenda Introductions: Roadway Focus Group - Jennifer
Presentation cover; need to take off boarder on PPLM photo
Operations Update – November 14th, 2018.
St. Andrews Agenda Item 11.A & 11.B
KENT COUNTY Safety Edge Projects
Regional Stormwater 2016 Operations, Maintenance, & Projects
Presentation transcript:

Westfield Public Works Department Jeremy Lollar, Director June 8, 2015

Primary Responsibilities Road Safety Road Maintenance Storm Water Maintenance and Repair Infrastructure Improvement (Capital Projects) Infrastructure Inspection Lending a Helping Hand

Road Safety Snow Removal Brickman Practical Property Group Pothole Repair FE Harding 108 tons of Asphalt placed (88 hot/20 cold) Federal HSIP Grant Highway Safety Improvement Program $1.5 Million awarded for ADA and intersection safety improvements

Road Maintenance Pothole repair Crack sealing Spring and Fall Seasons Night work Shoulder repair Infrared patching Resurfacing Highway Safety Improvement Program $1.5 Million awarded for intersection safety improvements

Storm Water Maintenance and Repair Erosion and encroachment inspection Culvert replacement and repair Sink hole repair Ditching and swale repair

Infrastructure Improvement 2015 Spring Resurfacing 156 th and Springmill Round-a-bout 191 st and Tomlinson Round-a-bout Grand Park Blvd. Extension 161 st and Oakridge Round-a-bout Mill Street Extension

Infrastructure Improvement 156 th and Springmill Round-a-bout

Infrastructure Improvement 191 st and Tomlinson Round-a-bout

Infrastructure Improvement Grand Park Blvd. Extension

Infrastructure Improvement 161 st and Oak Ridge Round-a-bout

Infrastructure Improvement Mill St. Extension

Lending a Helping Hand Grand Park Design and construction of the WYSI field additions Under-brush clearing in the wooded areas Rock pile removal and placement Shade sail installation