Further consultation on NTS entry baselines Nienke Hendriks Head of Gas Transmission Policy, Compliance and Enforcement 14 August 2007.

Slides:



Advertisements
Similar presentations
Review of NTS entry charge setting arrangements - IA 1 July 2010.
Advertisements

RIIO-T1 impact on allowed revenues and network charges 6 September 2012.
Commercial Arrangements For Gas Quality Service – Process UNC Transmission Workstream 23 rd April 2007.
A regulatory framework for gas quality treatment facilities: recap and update.
UNC Modification Proposal Revised Timescales for LDZ Shrinkage Arrangements Simon Trivella – 25 th September 2008 Distribution Workstream.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Exit Reform Review Transmission Workstream 07 January 2010.
The economic regulation of gas processing services Key issues and initial thoughts Ofgem presentation 18 June 2007.
Moving the QSEC and AMSEC Auctions National Grid NTS, Transmission Workstream.
Exercise Opus Findings Gas Customer Forum 10 th March 2008.
The Treatment of “Spare / Sterilised” Capacity – follow up Draft for discussion purposes only.
Entry Capacity Release Methodology Statement Transmission Workstream, 4 th May 2006.
Capacity trade and transfer mechanism and the next AMSEC auction Nienke Hendriks Head of Gas Transmission Policy, Enforcement and Compliance 9 May 2007.
SO Incentives from April 2010 John Perkins. 2 Gas System Operator (SO) Incentives National Grid operates the high pressure Gas Transmission System in.
GRI NW Investment Workshop Chris Logue, European Policy Manager, 4 th June 2010 The Hague.
Transfer & Trades Special Transmission Workstream
The Entry Capacity Transfer & Trade Methodology Statement Transmission Workstream
Capacity Release Processes and Investment Planning Transmission Planning Code Workshop 2 1 st May 2008.
Consultation on disposal of part of NTS for CCS 11 May 2009 Bogdan Kowalewicz.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Mod 0333: Update of default System Marginal Prices Review Group August 2010 Transmission Workstream 07/10/2010.
Discretionary Release of Non Obligated NTS System Entry Capacity Transmission Workstream 1st May 2008.
XVI th Madrid Forum Madrid, 28 May 2009 Walter Boltz (Gas Working Group Chair) Transparency guidelines and GRI transparency work.
Delivering Connections and Capacity RIIO-T1 and associated commercial changes - Summary June 7th 2012.
Third Workstream meeting re Baseline Re-consultation and Substitution 12 September 2007.
1 Allocation of Baseline Reduction in the Substitution Methodology Draft Presentation aimed for 11 th June Substitution Workstream John Baldwin Gas Strategies.
Entry Capacity Substitution Workshop 2 7 th May 2008 Substitution Example.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Exit Capacity Substitution and Revision Transmission Workstream meeting, 3 rd December 2009.
Open letter on Development of the regime ahead of winter 2007/8 Nienke Hendriks Head of Gas Transmission Policy, Enforcement and Compliance 28 June 2007.
Review of Entry Capacity and the Appropriate Allocation of Financial Risk Review Group th Sept 2008.
Capacity Methodology Statements Transmission Workstream 5 th July 2007.
Optimisation of Entry Capacity Strawman Transmission Workstream 4 th May 2006.
Entry Capacity Substitution Workshop 3 11 th June 2008 Substitution Example.
15 February 2006 TPCR second consultation: gas offtake Offtake Arrangements Workstream 15 February 2006.
Emergency Cashout Prices and Emergency Curtailment Quantity (ECQ) Adjustment Ritchard Hewitt Gas Code Development Manager.
Transmission workstream 6 April Overview of TPCR Third Consultation UNC transmission workstream – 6 April Mark Feather.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Ofgem Information Request on availability of NTS Exit Flexibility Capacity Ritchard Hewitt Gas Code Development Manager National Grid Transmission 7 th.
Supply Assumptions for Investment Planning Transmission Planning Code Workshop 1 3rd April 2008.
Entry Capacity Substitution Workshop 4 9 th July 2008 Entry Capacity Substitution Methodology Statement: Discussion Paper.
Exit Capacity Release Methodology Statement - ExCR Transmission Workstream – 5 th March 2009.
Facilitating Release of Non-obligated Entry Capacity Draft – for discussion purposes only 22 November 2007.
Entry Capacity Substitution: Discussion Document Transmission Workstream 7 th August 2008 Initial Analysis of Responses.
Demand Side Investment Planning Transmission Planning Code Workshop 2 1 st May 2008.
Proposal to adjust investment lead times Transmission Workstream 4 th May 2006.
European Ten Year Network Development Statement Volker Schippers GTE+ Senior Adviser GTE+ Workshop on GTE+ Work Programme 24 June 2008.
Review Group -140 Thoughts on additional information requirements.
Capacity trade and transfer mechanism and the next AMSEC auction Bob Hull Director, Transmission 9 May 2007.
Trades and Transfers Workshop, 6 th November 2007.
Transfers and Trades Special Transmission Workstream
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Gas storage: GB experience and future trends Sonia Brown Director, European Strategy and Environment GSE Conference - May 2007.
The Entry Capacity Substitution Regime Transmission Workstream 7 th February 2008 Thoughts for discussion.
Transmission Planning Code – Draft Document
Review Group 291- Ofgem Update
Transmission Planning Code
Capacity Methodology Statements: Impact of Mod 452
NTS Entry Charging Review Update
Capacity Methodology Statements
Exit Capacity Substitution and Revision
Mod 621A Supporting analysis
Background to National Grid’s Baseline analysis
Development of Entry Capacity Substitution
Transmission Planning Code Review
Entry Capacity Substitution
Review Group 291- Ofgem Update
Entry Capacity Transfer and Trade
Baseline Re-consultation
Optimisation of Entry Capacity Modification Proposal
Presentation transcript:

Further consultation on NTS entry baselines Nienke Hendriks Head of Gas Transmission Policy, Compliance and Enforcement 14 August 2007

2 Agenda 27 July 2007 Ofgem Open Letter Reasons for revising baselines as part of TPCR Ofgem modelling request to NGG in TPCR TPCR consultation documents: Modelling outputs and baseline figures Approach to modelling TPCR September Updated Proposals - December Final Proposals: treatment of ‘free increments’ Overall TPCR package and final TPCR baseline numbers

3 27 July 2007 Ofgem Open Letter 30 March 2007 Section 23 on new NTS entry capacity baselines as part of TPCR Now reconsulting on these baseline figures Issue an impact assessment

4 Reasons for revising baselines as part of TPCR Baselines to reflect physical capability of the network –i.e. the maximum capacity that can be released at each entry point at system peak given the current intact network and assuming flows at nearby entry points are also relatively high Reducing the risk of consumers facing high buyback costs Recognising that gas flow patterns are changing Addressing concerns in relation to sterilised capacity

5 Ofgem modelling request to NGG NGG NTS to carry out network modelling using its existing Graphical Falcon software –model network capability for initially 2007/08 and 2008/09 but ultimately only for 2008/09 –use “load absorption”, "supply substitution" and a combination of the two, to balance the network assess network capability on a nodal basis, including potential new entry points in the analysis –Include sensitivity based on minimum LNG scenario –assume 2005 TYS physical network for 2008/09 –model "1 in 20 winter peak" demand for 2008/09 (as per 2005 TYS) –on the supply side, model "Transit UK", "Global LNG" and “Auctions+“ from 2005 TYS for 2008/09 –estimate reinforcement costs for four different "increment sizes", ie increases in capacity at individual entry points, namely 25 GWh/d, 100 GWh/d, 500 GWh/d and 1,000 GWh/d

6 TPCR consultation documents: Modelling outputs and baseline figures March 2006 Third consultation document – most results for Transit UK scenario (Appendix 10) June 2006 Initial Proposals – Global LNG, Auctions +,Transit UK load absorption and supply substitution results and initial proposals for gas entry baselines based on supply substitution (table 11.6) September 2006 Updated Proposals – presented June Initial Proposals baseline figures versus NGG proposed baseline numbers October 2006 Addendum - presented June Initial Proposals baseline figures but adjusted for already sold capacity and made offsetting zonal adjustments

7 Supply Scenarios Transit UK – This scenario assumes an aggressive, phased build-up of imports from Norway and LNG. It assumes that international LNG players decide to use the UK as a ’gateway to Europe’ with appreciable exports to the Continent primarily during the summer and shoulder months, thereby increasing NTS throughput significantly. Global LNG – This scenario assumes a situation where the majority of the LNG potentially destined for the UK is shipped to alternative markets as a result of stronger gas prices outside of the UK. To meet the supply shortfall the UK receives relatively high volumes from Norway and, to a lesser extent, from the Continent, where the Interconnectors are assumed to operate on a more seasonal basis. Auctions + - In Auctions+, auction results have been used as a guide in projecting the supply profile across the entry points, with individual terminal and storage flows constrained by the respective obligated capacity levels where necessary. As a result, this scenario is characterised by modest levels of imports at Bacton in the short to medium term, a significant build up in Norwegian imports at Easington from 2006/07 and very high imports of LNG through Milford Haven from 2007/08. Source: National Grid Gas Transportation 2005 Ten Year Statement

8 September Updated Proposals - December Final Proposals: treatment of ‘free increments’ (1) After publishing Initial Proposals, NGG was concerned that Ofgem was overestimating network capability by double counting ‘free increments’ (i.e. the maximum additional capacity that could be released at each entry point at system peak) NGG argued that given that the base network had been balanced using a merit order approach, least helpful supply substitution to balance the incremental network would still overestimate network capability by double counting the so called ‘free increments’ Separate zonal analysis that NGG submitted to Ofgem indicated significantly lower estimates of maximum network capabilities In the September document we published both our and NGG’s numbers

9 September Updated Proposals - December Final Proposals: treatment of ‘free increments’ (2) October baseline addendum was based on 90% of (average) free increment to average baseflow of the three scenarios Final proposals were based on 90% of highest free increment in a zone, this amount of capacity was smeared over all entry points in that zone 3 approaches for smearing free increment were considered: –TYS –Sold capacity –Pre-TPCR baselines

10

11 Overall TPCR package and final TPCR baseline numbers Final baseline numbers were proposed as part of overall TPCR package, taking account of responses to the previous consultation documents The overall TPCR package included: (i) cost of capital; (ii) capex allowance; (iii) opex allowance; (iv) pensions and tax allowances; (v) revenue drivers; (vi) buy back allowance and exposure; (vii) other incentives and obligations New obligation on NGG to introduce capacity trade, transfer and substitution to reduce the risk of sterilised capacity and to reduce the risk of inefficient investment

12