© Construction Management Association of America. Do Not Duplicate or Reproduce. Standards of Practice Course CPM Scheduling Lab.

Slides:



Advertisements
Similar presentations
Precedence Diagramming
Advertisements

WBS: Lowest level OBS: Lowest level
Copyright © 2009 T.L. Martin & Associates Inc. Chapter 4 Standard CPM Smoke and Mirror Tricks (Manipulations)
Developing a Project Plan CHAPTER SIX Student Version Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
MANAJEMEN PROYEK PERANGKAT LUNAK Program Pendidikan Vokasi Universitas Brawijaya Tahun 2011.
ES=32 EF=34 LS=33 LF=35 ES=10 EF=16 LS=10 LF=16 ES=4+6=10 EF=10 LS=4
1 Lecture by Junaid Arshad Department of Engineering Management Abridged and adapted by A. M. Al-Araki, sept WBS: Lowest level OBS: Lowest level.
CSSE Sep.2008 Constructing and Analyzing the Project Network Diagram Chapter 6.
CSSE 372 Week 6 Day 2 Constructing and Analyzing the Project Network Diagram  PERT Chart PERT was invented for the Nautilus submarine project. Ok, maybe.
Critical Path Method (CPM)
إدارة المشروعات Projects Management
5/4/20151 NETWORK SCHEDULING TECHNIQUES. 5/4/20152 Network Diagrams  PMI defines the scheduling process as: “the identification of the project objectives.
Project Scheduling Critical Path Method
Construction Planning and Scheduling A G E NG 520 Schedule Computations Part #2 1. Definition and Computation of Total and Free Floats: Total Float : The.
Dr. Hany Abd Elshakour 5/4/2015 3:55 PM 1. Dr. Hany Abd Elshakour 5/4/2015 3:55 PM 2 Time Planning and Control Activity on Node Network and Precedence.
Project Networks. A,4 B,3 C,4 D,6 E,3 H,6 F,5 G,4 I,2 St,0 Fin,0 Example Network - terminology C,t Activity Duration of Activity (ES, LS) Early Start.
Project Management OPER 576 Project Networks Greg Magnan, Ph.D. April 29, 2004.
Chapters 8, 9, and 10 Design Stage 1 Preconstruction Stage 2: Procurement Conceptual Planning Stage3: Construction Stage 4: Project Close-out.
Network planning Learning objectives After these lectures you should be able to: - Produce and analyse activities networks - Calculate earliest and latest.
Precedence Network Calculations the basic information that should be calculated in the precedence network are: 1) Early activity start (ES) 2) Early activity.
Projects: Critical Paths Dr. Ron Lembke Operations Management.
AMERICAN SPORTS BUILDERS ASSOCIATION CRITICAL PATH METHOD SCHEDULING FOR SUCCESS December 6-8, 2008 New Orleans, Louisiana Presented By: Bill Pronevitch.
Software project management (intro) Scheduling Network.
Time Management Ahmed Awad, Ph.D., PMP. Time Management It includes the processes required to ensure timely completion of the project. b Activity Definition.
Project Management CPM, PERT, Crashing – An Illustrative Example
Where We Are Now. Where We Are Now Developing the Project Plan The Project Network A flow chart that graphically depicts the sequence, interdependencies,
The Critical Path – Precedence diagram method Luise Lorenz Christina Mohr.
Time Planning and Con trol Precedence Diagram.  Precedence Diagramming  An important extension to the original activity-on-node concept appeared around.
THE MANAGERIAL PROCESS Clifford F. Gray Eric W. Larson Developing a Project Plan Chapter 6.
Amin Salari, CCM, PMP, LEED AP – Lundgren Management
POST GRADUATE PROGRAM OF INFORMATION TECHNOLOGY
Rights Reserved 1 CPM-200: Principles of Schedule Management 15 th Annual International Integrated Program Management Conference November 16-19, Tyson’s.
PMP, CAPM, PgMP, PMI-SP, PMI-RMP, OPM3 and PMBOK are registered marks of Project Management Institute, Inc Inov8Solutions Inc – Quality Educational Services.
PROJECT MANAGEMENT Definitions WBS = Work Breakdown Structure
Irwin/McGraw-Hill  The McGraw-Hill Companies, Inc Project Scheduling IENG 321 IENG 321.
Dr. Hany Abd Elshakour 2/18/ :27 PM 1. Dr. Hany Abd Elshakour 2/18/ :27 PM 2 Time Planning and Control Activity on Arrow (Arrow Diagramming.
Dependencies and Network Diagrams. Agenda Dependencies Milestones The Network Early/Late Start/End dates Slack/Float Critical Path.
Project Management – Part 1. Overview What is a project? Project management techniques Activity lists Network diagrams Critical path analysis Gant charts.
Project Planning & Scheduling What is a “project”? Objectives and tradeoffs Planning and Control in Projects Scheduling Methods Constant-Time Networks.
The Network Diagram. When to Do What?  Carrying out one activity after the other may result in project completion, but it will take the longest possible.
Scheduling Scheduling : is the process of converting a project action plan into an operating time table. Why scheduling ? To answer the following questions:
Project Management MGT 30725
Project Planning & Scheduling
Time Planning and Control Activity on Node Network (AON)
Project Planning & Scheduling
Project Planning and Scheduling
Project scheduling Precedence diagram method & Resource scheduling
Project Management Critical Path Method Demonstration
Project Scheduling Chapter 14.
Projects: Critical Paths
Project Management for Software Engineers (Summer 2017)
Introduction to Project Planning & Scheduling Software Microsoft Project Prepared by; Emedya Murniwaty Samsudin emedya murniwaty samsudin_msp2013 sem 2.
Project Management CPM Method Tutorial-p2
Time Planning and Control Activity on Node Network (AON)
Time Planning and Control Precedence Diagram
ENM448-Project Planning and Management
Project Scheduling Basics Activity on Node Precedence Diagrams
Project Management CPM Method Tutorial-p1
Project Time Management
1 Total Slack A 3d Task Early Start Late Start Early Finish
Time Planning and Control Activity on Node Network (AON)
BEST VIEWED IN SLIDE SHOW MODE
Project Time Management
Lecture 5: Project Time Planning (Precedence Diagramming Technique)
Project Time Management
Project Time Management
Exercise – A small building.
Project Time Management
Time Planning and Control Precedence Diagram
Presentation transcript:

© Construction Management Association of America. Do Not Duplicate or Reproduce. Standards of Practice Course CPM Scheduling Lab

© Construction Management Association of America. Do Not Duplicate or Reproduce. Activity Notation Use for Manual Calculation Early Start Late Start Early Finish Late Finish Duration Activity ID ESEF LSLF ID D FFTF Free FloatTotal Float April, 2010

© Construction Management Association of America. Do Not Duplicate or Reproduce. September, D A B C 4 00 FS  EF = ES + D - 1  ES = EF P + 1  LF = LS S - 1  LS = LF - D + 1  TF = LF - EF  FF = ES S - EF - 1 LF ESEF LS ID D FFTF Notation: Subscripts: S = Successor P = Predecessor Sample April, 2010

© Construction Management Association of America. Do Not Duplicate or Reproduce. September, 2006 CMAA Formulas for Calculation for Finish-to-Start Activities ES = EFP + 1 LS = LF - D + 1 TF = LF - EF EF = ES + D – 1 LF = LSS – 1 FF = ESS - EF - 1 April, 2010

© Construction Management Association of America. Do Not Duplicate or Reproduce. September, 2006 CMAA Calculation Tips 1.Start by taking note of the relationships. Notice which are not finish-start, or which ones are finish-start but with a lag. (Formulas don’t apply to Start-to-Start relationships or Finish-to-Finish relationships.) 2.Begin calculating on the first activity on the left side. 3.In CMAA’s examples, the first activity begins on Day One. Not Day Zero. 4.Work towards the right, in an up and down motion, in strips (this is to avoid unnecessary iterations). April, 2010

© Construction Management Association of America. Do Not Duplicate or Reproduce. September, 2006 CMAA Calculation Tips 5.When working with a lag greater than 0, first calculate the link as if it had no lag. Then add the lag time. 6.When an activity has multiple predecessors, each predecessor must be evaluated in turn to determine the correct early start date for the successor. During the Forward pass, the greater # (latest date) overrides. 7.The same concept holds true during the backward pass. For activities which have multiple successors, each successor must be evaluated to determine the correct late finish date for the preceding activity. During the backward pass, the lesser # (earlier date) overrides. 8.The last activity has no successor, so the late date formulas don’t apply. Assume for the last activity, EF = LF = END. April, 2010

© Construction Management Association of America. Do Not Duplicate or Reproduce. September, 2006 D 10 13A 3 4B 1 C 4 FS  EF = ES + D - 1  ES = EF P + 1  LF = LS S - 1  LS = LF - D + 1  TF = LF - EF  FF = ES S - EF - 1 LF ESEF LS ID D FFTF Notation: Subscripts: S = Successor P = Predecessor Exercise #1 April, 2010

© Construction Management Association of America. Do Not Duplicate or Reproduce. September, 2006 PART 1: Calculate a Baseline Schedule The AON logical network of a baseline schedule for a construction project is as shown in Exercise #2. Assume that for the last activity EF=LF=end of project. Required: Answer all questions on network diagram only 1.Calculate the ES, EF, LS, LF, and TF for each activity. 2.What is the free float (FF) for activity E? 3.What is the free float (FF) for activity F? Explain the difference in days between the FF and the TF for activity F. Exercise #2, Part 1 April, 2010

© Construction Management Association of America. Do Not Duplicate or Reproduce. September, 2006 A 10 D 5 F G H 5 E 5 B C Exercise #2, Part 1 All relationships finish-start unless noted. FS + 2 FS - 2 LF ESEF LS ID D FFTF Notation: SS + 5 April, 2010

© Construction Management Association of America. Do Not Duplicate or Reproduce. September, 2006 Exercise #2, Forward Path A B C D E F G H SS + 5 FS + 2 FS - 2 April, 2010

© Construction Management Association of America. Do Not Duplicate or Reproduce. September, 2006 Exercise #2, Backward Path A B C D E F G H SS + 5 FS + 2 FS - 2 April, 2010

© Construction Management Association of America. Do Not Duplicate or Reproduce. September, 2006 Exercise #2, Part 2 PART 2: Calculating Progress on the Schedule At the end of the day on day 15, the following progress information was available: 1.Activity A started 2 days late, and was completed on time. 2.Activity B started on time, and made progress as follows. a.Completed work in place = 500 sq ft b.Remaining work quantity = 500 sq ft April, 2010

© Construction Management Association of America. Do Not Duplicate or Reproduce. September, 2006 Exercise #2, Part 2 PART 2, Continued:  Activity D started on day 14. Remaining duration required for completion is estimated to be 2 days.  The original duration for Activity E changed from 5 days to 20 days. April, 2010

© Construction Management Association of America. Do Not Duplicate or Reproduce. September, 2006 Exercise #2, Part 2 PART 2, Continued: Required: Answer all questions on network diagram only Based on the progress information available at end of day 15, Q1. Calculate actual start and finish dates for all activities in progress. Q2. Calculate the ES, EF, LS, LF, and TF for all other activities. Identify the critical Path. April, 2010

© Construction Management Association of America. Do Not Duplicate or Reproduce. September, 2006 Exercise #2, Part 2 All relationships finish-start unless noted. A 10 D 5 F B SS + 5 FS + 2 FS - 2 LF ESEF LS ID D Notation: ASAF Actual Start Actual Duration Dur = RD if AD>0 Dur = RD if AD=0 (activity has not started) AD Actual Finish FFTF G 10 H 5 E 20 C 10 April, 2010

© Construction Management Association of America. Do Not Duplicate or Reproduce. September, 2006 Exercise #2, Forward Path A B C D E F G H FS + 2 SS + 5 FS - 2 Data Date – Day 16 April, 2010

© Construction Management Association of America. Do Not Duplicate or Reproduce. September, 2006 Exercise #2, Backward Path A B C D E F G H FS + 2 SS + 5 FS - 2 Data Date – Day 16 April, 2010