Development programs and model philosophy1 Preliminary design review Prototype program Critical design review Qualification program Qualification review.

Slides:



Advertisements
Similar presentations
Leicester SRC, 3-5 Dec 2007 Systems engineering at detector level Tim Stevenson.
Advertisements

1 PROJECT MANAGEMENT ROLE OF KEY PERSONNEL Bernd Madauss International Space University Strasbourg February, 2011
Basic Overview of Project Management and Life Cycle ACES Presentation T. Gregory Guzik January 21, 2003.
1 Lecture 1.4: Life Cycle Models Dr. John MacCarthy UMBC CMSC 615 Fall, 2006.
GLAST LAT ProjectMarch 24, A Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS A: Tracker Test Plan Overview.
GLAST LAT ProjectLAT I&T Subsystem CDR, March 28, 2003 Document: LAT-PR Section 4 - Page 1 GLAST Large Area Telescope: I & T Peer Review Performance.
GLAST LAT ProjectLAT Engineering Meeting, April 1, 2003 GLAST Large Area Telescope: Performance & Safety Assurance Darren S. Marsh Stanford Linear Accelerator.
GLAST LAT ProjectDOE/NASA Review of the GLAST/LAT Project, Aug. 14, 2001 Scott Williams 1 GLAST Large Area Telescope: Instrument Operations Center Scott.
GLAST LAT Project Engineering Meeting – ISOC Peer Review 1 Gamma-ray Large Area Space Telescope GLAST Large Area Telescope ISOC Peer Review ISOC Detail.
GLAST LAT ProjectCDR/CD-3 Review May 12-16, 2003 Document: LAT-PR-01967Section 15 Manufacturing & Processes 1 GLAST Large Area Telescope Manufacturing.
Requirements Module: Configuration & Change Management Space Systems Engineering, version 1.0 SOURCE INFORMATION: The material contained in this lecture.
LSU 01/18/2005Project Life Cycle1 The Project Life Cycle Project Management Unit, Lecture 2.
A Finmeccanica Company 04/2000/1 EUSO Development Philosophy EUSO General Meeting Max Planck Institute for Physics Munich, November the 20th 2003.
Section 20.0 Mission Assurance Roger Counts Systems Assurance Manager ST5 PDR June 19-20, 2001 GSFC 5 Space Technology “Tomorrow’s Technology Today”
1 Mirror subsystem: telescope structure Functions: Functions: Support mirrors subsystem to S/C Support mirrors subsystem to S/C Accommodate cryostat Accommodate.
IMPRS June Space Research, in praxis, illustrated by a ground-based example The „Ozonometer“ as a student project.
NASA’s Goddard Space Flight Center LRO Integration and Test Joanne Baker GSFC Code 568 August 16-17, 2005.
Space Engineering 2 © Dr. X Wu, 2012
PACS IBDR 27/ BOLC/BOLA1 BOLC / BOLA SAp/DAPNIA/DSM/CEA C. CARA WE Design Team: A. BOUERE - N. DEVIN - G. DHENAIN - E. DOUMAYROU M. SEYRANIAN -
ExoMars PanCam Planetary Protection Alex Rousseau.
VST: dome THE LIFE CYCLE OF MODERN TECHNOLOGICAL PROJECTS Ing. Davide Fierro THE LIFE CYCLE OF MODERN TECHNOLOGICAL PROJECTS.
PACS IIDR 01/02 Mar 2001 Instrument Interfaces1 PACS FPU Opto-mechanical Design Overview and Interfaces J. Schubert MPE.
NASA’s Goddard Space Flight Center Systems Engineering Mike Pryzby Swales Aerospace August 16-17, 2005.
THEMIS SRR Requirement Overview - 1 UCB, 07/08/2003 REQUIREMENT DEVELOPMENT OVERVIEW Ellen R. Taylor Mission Systems Engineer Space Science Laboratory.
System issues System decomposition / Product tree System specification: function, performance, interfaces, budget Work-breakdown structure.
GLAST LAT ProjectDOE/NASA Mechanical Systems Peer Review, March 27, 2003 Document: LAT-PR-0XXXX Section 6.0 Subsystem Verif. Test Plan 1 GLAST Large Area.
SECCHI Consortium Meeting, July 2001 SECCHI Ground Data Systems and Data Processing Nathan Rich NRL/Interferometrics
Oct 17, 2001SALT PFIS Preliminary Design Review Fabrication and Test Plan 1 Southern African Large Telescope Prime Focus Imaging Spectrograph Fabrication.
Refined ECSS Software Process Model Elements SD-TN-AI-0570, Issue 5 APPENDIX D.
1 WP4 – System Testbed Trial 2 preparation Barcelona 3/03/05 Marco Bobbio Pallavicini - Carlo Gavazzi Space SpA.
GLAST LAT ProjectCDR/CD3 Review May 12-16, 2003 Document: LAT-PR-01967Section XX 1 GLAST Large Area Telescope: LAT System Engineering WBS Dick Horn.
GLAST LAT ProjectI&T&C Pre PDR, October 2, 2001 E. do Couto e Silva1 I&T&C Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer B. Grist.
Test and Integration Robyn Allsman LSST Corp DC3 Applications Design Workshop IPAC August , 2008.
GLAST LAT ProjectCDR/CD3 Review May 12-16, 2003 Document: LAT-PR Section 15 Manufacturing Process 1 GLAST Large Area Telescope Manufacturing Process.
Herschel/Planck January 13, 2005PACS IQR - SCI-PT/ ggonzale: Herschel PACS Instrument Qualification Review Review Objectives and Organisation G.Crone/G.Pilbratt.
THE PROJECT LIFE CYCLE PROJECT MANAGEMENT LIFE CYCLE LSU 01/18/2005 PROJECT LIFE CYCLE 1.
EE400D DOCUMENTATION INSTRUCTIONAL SERIES CRITICAL DESIGN REVIEW.
DPE CSSW Process Model Annex A WP-400 ECSS Case Study.
PACS IIDR ESTEC 01/02 March 2001 System Engineering 1 PACS Instrument Intermediate Design Review (IIDR) Reinhard Katterloher System Engineering DDVP, Model.
24b - 1 NASA’s Goddard Space Flight Center LRO Safety Dave Bogart Code 302 August 16-17, 2005.
Solar Probe Plus A NASA Mission to Touch the Sun March 2015 Instrument Suite Name Presenter's Name.
PACS IIDR ESTEC 01/02 March 2001 Integration and Testing1 PACS Instrument Intermediate Design Review (IIDR) Reinhard Katterloher Integration and Testing.
20c - 1 NASA’s Goddard Space Flight Center Propulsion Chuck Zakrwski NASA/GSFC Code 597 August 16-17, 2005.
Preparation Examples ACD has provided a website of their CDR preparation status I encourage everyone to view posted material, including the CDR Dry Run.
GLAST LAT ProjectCDR/CD-3 Review May 12-16, 2003 Document: LAT-PR Section 5 IOC Subsystem 1 GLAST Large Area Telescope: IOC Subsystems WBS: 4.1.B.
GLAST LAT ProjectCAL Peer Design Review, Mar 17-18, 2003 P. Dizon Naval Research Lab Washington DC GLAST Large Area Telescope Calorimeter Subsystem Gamma-ray.
I. Preliminary Design Review 1. Product specification 2. Project scope 3. Technical approach/solution to the Design Problem 4. Working Schedule (Gantt.
GLAST LAT ProjectFace to Face, 14 April 2004 LAT System Engineering 1 GLAST Large Area Telescope: EGSE and Interface Verification Pat Hascall SLAC System.
GLAST LAT ProjectPeer Review & CDR Preparation Document: LAT-PR Preparation Schedule Subsystems Peer Reviews –ACD January 7-8, 2003 –CALMarch.
TRIO-CINEMA 1 UCB, 2/08/2010 System Design Dave Curtis UCB/SSL Space Sciences Laboratory University of California, Berkeley.
Athena Italian and CNES/IRAP Meeting
Accelerator Readiness Review October 31, 2006
I&T&C Organization Chart
THEMIS Mission Assurance
0.0 Instrument Suite Name Presenter’s name
Peer Review Agenda (Suggested).
Test and Verification C. J. Sweeney Boston Univ..
GLAST Large Area Telescope:
GLAST Large Area Telescope: I&T Integration Kickoff Meeting
GLAST Large Area Telescope
GLAST Large Area Telescope:
Integration, Test, and Verification
Lockheed Martin Canada’s SMB Mentoring Program
GLAST Large Area Telescope
GLAST Large Area Telescope:
Introduction and Overview
PSS verification and validation
Integration & Test Instrument Operations Coordination
DOE Review of the LCLS Project October 2006
GLAST Large Area Telescope:
Presentation transcript:

Development programs and model philosophy1 Preliminary design review Prototype program Critical design review Qualification program Qualification review Flight program Flight acceptance review Preliminary design program

Development programs and model philosophy2 Preliminary design ( system design, architectural design) Established at PDR: Design choices, trade-offs Design choices, trade-offs Internal and external interfaces frozen Internal and external interfaces frozen Internal and external environment Internal and external environment Functions and performances Functions and performances Design & performance verification program Design & performance verification program Feasibility of critical items Feasibility of critical items EGSE and test-equipment planning EGSE and test-equipment planning Start prototype program PDR

Development programs and model philosophy3 Critical design review Revisit PDR more accurately Documentation: Specification, ICD, drawings Specification, ICD, drawings User manuals User manuals Plans: AIV, test equipment, qualification, verification control etc Plans: AIV, test equipment, qualification, verification control etc FM-design ready Start qualification program CDR

Development programs and model philosophy4 Qualification review Established at QR: Functions and performances verified Functions and performances verified Manufacturing / workmanship verified for launch and space environment Manufacturing / workmanship verified for launch and space environment QR

Development programs and model philosophy5 Acceptance review Established at Flight acceptance review: Functions and performances verified Functions and performances verified Manufacturing / workmanship verified for acceptance Manufacturing / workmanship verified for acceptance Instrument characterization and calibration Instrument characterization and calibration AR

Development programs and model philosophy6 Development programs and highlights PDR CDR QR AR prototype qualification flight Specifications frozen Interfaces frozen Environment known Trade-offs made ICDs, specs, User manuals Verification control matrix Plans Functions, performance verified workmanship tested at Qualification- level Functions, performance verified workmanship tested at acceptance level Instrument calibrated, characterized

Development programs and model philosophy7 Concurrent programs for all units prototype qualification flight Unit #3 Unit #2 Unit #1

Development programs and model philosophy8 Shortcut to proto-flight model CDR AR protoflight Specifications frozen Interfaces frozen Environment known Trade-offs made ICDs, specs, User manuals Verification control matrix Plans Functions, performance verified workmanship tested at Qualification- level Functions, performance verified workmanship tested at acceptance level Instrument calibrated, characterized

Development programs and model philosophy9 EMQMFMSTM remark Detector subsystem hardware IDC cryostat FEA ADR ST ST/JT AAC CDE PSU radiator calorimeter array in-flight calibration source CAP CDP flight harness Detector subsystem software IDC-software CDP-software cmd/hk database

Development programs and model philosophy10 EMQMFMSTM remark Telescope subsystem hardware Tube Mirror module Cover tac Heaters thermistors flight harness telescope subsystem software cmd/hk database