Monterey Model: Strategies for an Efficient Public-Public Partnership Case Studies toward Success George Helms General Services Superintendent.

Slides:



Advertisements
Similar presentations
A CDM Company CDM Waterless Urinals and Garbage Disposal Systems: Two Examples of Institutional Water Efficiency An Analysis of Water Use at the.
Advertisements

Energy Savings Opportunities in Controls, Lighting, Air Conditioning, Water Heating and Refrigeration Chuck Thomas, P.E. CEM Lead Engineer.
NJ SmartStart Buildings New Jersey Higher Education Partnership for Sustainability (HEPS) January 20, 2012 Presenter: BPU President Robert Hanna.
ENERGY CONSUMPTION: MANZANITA HALL ENERGY UPGRADES BEN COHNDANNY GARNETT AUSTIN FROGGEPAUL SAIGEON MATT DUNCAN.
T OPPORTUNITIES FOR ENERGY EFFICIENCY AT TRIBAL GAMING FACILITIES.
Energy Conservation Program Overview A Presentation to the Board of Education June 7, 2011 Prepared by Facilities and Planning.
Denver Place North & South Towers Case Study Matt Urquhart Amerimar Realty Management Company Jack Wolpert E-Cube, Incorporated.
1 Conservation: An Alternative Energy Source for Local Communities Ted Coates, Power Manager September 20, 2008.
How to Hit a Homerun Saving Energy and Updating Facilities Presented by Shirley McNutt.
ELECTRIC HYBRID HEAT PUMP WATER HEATERS
Investing in our Community Using Stimulus Funds to Develop a Home Energy Retrofit Program May 2009.
ENERGY EFFICIENCY FOR END-USERS.  CSU Chancellors office coordinates the efforts to accomplish the goals established by Assembly Bill 32 for green house.
Industrial Heating & Piping Co. Madawaska School Department Energy upgrades to the heating system at the Madawaska High and Middle School.
Franklin County Technical School Performance Contract Project.
Get Ready: Changes Impacting the Water Heater Marketplace George M. Chapman Senior Program Manager Consortium for Energy Efficiency © 2015 Consortium for.
Toward a Sustainable Campus. Outline A. Global Sustainability Movement in Higher Education B. Resources C. What can be done? D. “Toward a Sustainable.
Month Year Working together to achieve your desired outcomes, by delivering service excellence. Building Engineering Solutions for the optimisation of.
Solar Energy Technology for Commercial Facilities John Archibald American Solar, Inc. Association of Energy Engineers Baltimore Chapter.
Trane’s DOE GHP Super ESPC Fort Knox Energy Program
Performance Contracting The Honeywell One Source Solution.
The Efficiency of Energy Efficiency Program Tom Van Paris Vice President-Member Services & Communications October 18, 2012.
Getting Green Building Automation. Why is Building Automation a Green Technology? There are programs starting all over the nation that focus on alternative.
Charles F. Hurley Building Case Study B.J. Mohammadipour Bureau of State Office Buildings.
Siemens sans siemens sans bold siemens sans italic siemens sans italic bold siemens sans black siemens black italic Siemens Building Technologies.
Total Energy Usage As A Measure of Building Performance 30% Building Energy Savings Through an Energy Lifecycle Approach to Building Construction, Retro-fitting,
Solar Options The “Greening” of Local Communities.
GETTING HELP FOR LARGE ENERGY EFFICIENCY IMPROVEMENTS AT A SMALL COLLEGE Anne Duncan, Environmental Sustainability Coordinator Terry Rowe, Sales Team Leader.
Monterey Model Community based partnerships. MONTEREY IS THE DoD’S BEST DEVELOPED COMMUNITY PARTNERSHIP MODEL.
ALACHUA COUNTY ENERGY CONSERVATION STRATEGIES COMMISSION EAR RECOMMENDATIONS CREATING A RESOURCE EFFICIENT AND RESILIENT COMMUNITY.
“Sustainability serves as a lens through which business decisions are examined. Sustainability is not the responsibility of one department or the task.
Green Building Demonstration Project Adam Saling City of San Diego.
Sustainability and Public-Private Initiatives Sean Patton Director, Energy Solutions LOCKHEED MARTIN CORPORATION JUNE 8, 2012 Sustainability for the Future.
Femp.energy.gov 1 US DOE Perspective on Deep Energy Retrofits Cyrus Nasseri US Department of Energy Annex 61 Technical Day April 13, 2015.
Presidio of Monterey Partnerships August 5, 2012.
Developing and Issuing the RFP. Why should qualifications be your procurement focus? n Having the necessary range of capabilities is more important than.
KITSAP COUNTY ENERGY EFFICIENCY Autumn Salamack, Resource Conservation Manager Board of County Commissioners Office.
April, 2002Energy Audits1 April, 2002 Ryan Stroupe, Pacific Energy Center DeAnza College: ES 76 Energy Reliability and Your Organization Energy Auditing.
Phoenix Convention Center Phoenix, Arizona Lessons Learned from ARRA Projects Solution ShowcaseLessions Learned from ARRA Projects Walter Tersch, LEED.
LADWP WATER CONSERVATION IEPR Workshop August
Facility Improvement Program Town of Shirley June 17, 2013 Robert Reddish ABM Building Solutions.
Genesis. USA TRAINING PROGRAMS GreenPlumbers® training programs are designed to assist plumbers in understanding their role in relation to Environmental.
1 Drivers for Building Life Cycle Integrations Jim Sinopoli.
Business Networking Function – 2 nd July 2015 Proudly Sponsored by:
Slide 1 Fort Detrick Sustainability Planning Workshop #1 – Out Brief 1 Jul 08.
Demand Side Energy Management & Conservation Lighting Retrofits The University of Texas at Austin.
Energy Efficiency Solutions: Reduce Costs, Improve Infrastructure, Meet Environmental Goals Case Study: Towson University.
Self-Directed Energy Contracting Saving Your Buildings and Your Money.
Utah State University Logan Utah. Founded 1888 as a Land Grant Institution Host City – Logan, Utah (48,ooo+ population) ~ 15,000 Students (~ 28,700 students.
Introduction to Energy Management Doty, Steve & Turner, Wayne. (2009). Energy Management Handbook. Lilburn, GA: The Fairmount Press. Jacobsen, J. (2011).
Week 6 The Energy Walk Through. Possible elements of a walk through Understand on-site information collection and listing of essential data for collection.
Week 7 Utility Data Analysis. Essential Elements Identify sources for obtaining utility data: paper form, electronically or from the internet Review utility.
Request for Proposals: Energy Conservation Projects December 17, 2015.
01/15/16Prop 39 Update - Maintenance & Operations - Sustainability Initiatives Unit1 CALIFORNIA CLEAN ENERGY JOBS ACT LAUSD PROPOSITION 39 ENERGY EFFICIENCY.
HARVESTING LOW HANGING FRUIT EASY STEPS ANYONE CAN DO Broward College Energy Conservation Program Presented by Susyn Stecchi Broward College Energy Conservation.
Larry Baebler Jonathan Brown, P.E. April 20, 2015
Dan Burgoyne Department of General Services August 28, 2015.
Goal 4: Environmental To blend our residential and commercial properties with our “City of Parks and Trails” image to create sustainable framework of.
Lighting Beyond the Bulb LED Lighting and Lighting Management Solutions Todd Smith
Water Audits and Best Management Practice Life Cycle Cost Analyses for Army Medical and Health Care Facilities Presented By: Lisa Raysby Hardcastle, P.E.
Final Report on renewable energy feasibility for the Bridgeport Indian Colony Prepared by Josiah Johnston Renewable and Appropriate Energy Lab University.
McHenry County: A Decade of Sustainability. Background In 2004, McHenry County recognized a need to evaluate and improve the following inefficient facilities.
Back to the Basics: Climate and Energy Workshop Energy Efficiency Best Practices Karalee Browne.
Harness the Power of your Operating Budget to Enhance your Learning Environment MASBO Winer Conference – Jackson, MS.
APTA Sustainability Workshop 2016
Fort Stanwix National Monument Energy Audit Contract
New Programs for Businesses

Developing and Issuing the RFP
APTA Sustainability Workshop 2016
Low Income Programs - Hydro One Experience
Presentation transcript:

Monterey Model: Strategies for an Efficient Public-Public Partnership Case Studies toward Success George Helms General Services Superintendent

A Look Inside PMSA PMSA PrinciplesMonterey Model: Our ProcessCase Study 1: Recycling Taxpayer $Case Study 2: Operation Hot ShowerCase Study 3: Sequestration PivotLessons Learned

CONSIDER THE FACTS! 172 Buildings (fully utilized) Greater than 2,000,000 ft 2 Facilities 14 Maintenance Persons 2 Electricians Field Staff 79 houses per person 561 house per electrician Maintenance Work Load

PMSA Principles IMPROVE – SAVE - INNOVATE

PMSA’s Process Employee Selection, Training, & Skill Sets Ownership Teams & Aggressive Preventative Maintenance Track All Warranties Combine Engineering with Maintenance Find No Cost Partners

Employee Selection and Training From Hiring To Honoring PMSA Process

“No Cost” Partners Creating Sustainable Growth By Looking Outside the Fence Line PMSA Process

Case Studies Case Study 1: Energy Rebate Fund AccountCase Study 2: Operation Hot Shower Case Study 3: Sequestration Pivot

B uilding 848 B uilding 660 The Energy Rebate Account Case Study 1: Recycling Tax Dollars Case Study 1

Bring Utility $$$ Back To Installation Utility Rebates Provide Real $$ For The Installation PMSA Process

Case Study 1: Energy Rebate Account Contractor Estimated: $280,000 City Completed Work For: $120,000 Presidio Yearly Savings: $98,000 Presidio Received: $59,000 Rebate ROI: 1.2 years 8 Buildings Bundled Into One Project What do you do? Case Study 1

Monterey Model Create an Energy Rebate Account Energy rebates stay at installation Draw down for additional energy projects What is possible? Leverage for additional Federal Energy Funds? Can you add annual utility savings into the fund? Is a self-funding installation possible? Case Study 1

Is a Self-Funding Installation Possible? Energy Project Rebates:$119,534 Current Annual Energy Savings from Projects:$453,891 Total Estimated Savings In The Past 6 Years:$2,100,000 April 2013 Looking Back Over 6 years Only focusing on 14 Energy Project Rebates Only focusing on the Annual Utility Savings Case Study 1

Operation Hot Shower Case Study 2

Challenge 6 Barracks lost hot water due to a significant room occupancy increase Water Temp: 78 degrees Recovery Time: 7 hours Student complaints on the rise Cost of additional storage tanks/install: $500,000 What do you do? Operation Hot Shower Case Study 2

Monterey Model Trending to determine demand peaks City HVAC Staff worked directly with City Engineers: –Increase the size of heat exchanger –Add high efficiency on-demand water heater to run during peak demand –Add circulation pump to reduce temperature stratification Cost Savings: $400,000 Case Study 2

Case Study 3: Sequestration Pivot Problem: –Army contract slashed by $1.9m (1/3) Challenge: –How to meet these cuts without Staff layoffs Case Study 3 What do you do?

Monterey Model: Public-Public Innovation Prioritize Work Orders –Health & Safety, Security, Energy Conservation Re-assign Maintenance Staff to work on projects Hold the line on Preventative Maintenance Case Study 3

Lessons Learned Additional Thoughts: –Look at your buildings as assets, not liabilities –Consistent and Open Dialogue with DPW, ENVR, and Contracting –“Listen to the Line” –Expect change –Cornerstones: Perseverance Competitive mindsets Constructively challenge

Additional Case Studies Case Study 4: Competitive Public EmployeesCase Study 5: Water Savings Through Retrofits Case Study 6: Lighting Upgrades

Case Study 4: Competitive Public Employees? Camp Roberts HVAC Upgrades Contractor Estimate: Replace 4 units at $460,000 City Approach: Replace 8 units plus the cooling towers at $287,000 30% Energy Savings Case Study 4

Camp Roberts HVAC Construction Case Study 4: Competitive Public Employees? Case Study 4

Case Study 5: Water Savings Through Retrofits April 2012 The Majority of the Presidios fixtures will be of peak water savings technology Funding resulted from other project savings City provides flexible bidding format using additive alternates Total Number of Toilets Retrofit1,115 toilets Total Number of Urinals Retrofit94 urinals Total Water Credits Generated for Future Use credit GALLONS OF WATER SAVED ANNUALLY2,316,152 gal Case Study 5

2.3 million gallons = 4 Olympic swimming pools Case Study 5: Water Savings Through Retrofits Case Study 5

Case Study 6: Camp Roberts Lighting Upgrades AMBAG Changed out all T-12 to T-8 lightsAMBAG Performed Audit and InstallationArmy Cost = $0.00Annual Energy Savings: $28,931 Case Study 6