March 7, 2007 CLAS12 Drift Chamber Review Mac Mestayer Drift Chambers for CLAS12 - Mac Mestayer Context: how does it fit within CLAS12 ? Specifications:

Slides:



Advertisements
Similar presentations
SOCRAT: a SOftware for Clas12 Reconstruction And Tracking 04/25/10 S. Procureur (CEA-Saclay)
Advertisements

Gas-based tracking for SuperBelle Beam background Upgrade plan Summary Shoji Uno (KEK) April, 20-22, nd Joint Super B factory WS in Hawaii.
Drift chamber for super-Belle Present performance and background Idea for upgrade Upgrade plan Summary Shoji Uno (KEK) Jan-20 th, 2003 at Super B-factory.
Monte-Carlo simulations and reconstruction for 12-degree ep-elastic Luminosity Monitor A.Kiselev OLYMPUS Collaboration Meeting DESY, Hamburg,
Study of two pion channel from photoproduction on the deuteron Lewis Graham Proposal Phys 745 Class May 6, 2009.
BES III Main Drift Chamber MDC group Yuanbo Chen June 5,2002, Beijing.
Central Neutron Detector March ’11 Update Central Neutron Detector March ’11 Update Daria Sokhan IPN Orsay CLAS 12 GeV Workshop Paris, France – 9 th March.
HPS Test Run Setup Takashi Maruyama SLAC Heavy Photon Search Collaboration Meeting Thomas Jefferson National Accelerator Facility, May 26-27,
HLab meeting 10/14/08 K. Shirotori. Contents SksMinus status –SKS magnet trouble –Magnetic field study.
MdcPatRec Tracking Status Zhang Yao, Zhang Xueyao Shandong University.
June 9, 2008What’s a Drift Chamber? Mac Mestayer Drift Chambers: The Science behind the Art What are they? how do they work? ionization of the gas by particles.
PHENIX Drift Chamber operation principles Modified by Victor Riabov Focus meeting 01/06/04 Original by Sergey Butsyk Focus meeting 01/14/03.
DC12 Commissioning Status GOALS: establish operating conditions, determine initial calibration parameters and measure operating characteristics for the.
Rosen07 Two-Photon Exchange Status Update James Johnson Northwestern University & Argonne National Lab For the Rosen07 Collaboration.
Muon Detector Jiawen ZHANG Introduction The Detector Choices Simulation The structure and detector design The Expected performance Schedule.
NanoPHYS’12 – December 17-19, 2012 K. Nakano, S. Miyasaka, K. Nagai and S. Obata (Department of Physics, Tokyo Institute of Technology) Drift Chambers.
EPS-HEP 2015, Vienna. 1 Test of MPGD modules with a large prototype Time Projection Chamber Deb Sankar Bhattacharya On behalf of.
A search for deeply-bound kaonic nuclear states in (in-flight K -, N) reaction Hiroaki Ohnishi RIKEN.
Mitglied der Helmholtz-Gemeinschaft Calibration of the COSY-TOF STT & pp Elastic Analysis Sedigheh Jowzaee IKP Group Talk 11 July 2013.
Preliminary results of a detailed study on the discharge probability for a triple-GEM detector at PSI G. Bencivenni, A. Cardini, P. de Simone, F. Murtas.
Mac Mestayer DC12 Status: as of Feb., 2008 Decide on endplate, feedthrough, wire material –guidance from small prototype chambers mainly electrical stand-off.
Latifa Elouadrhiri Jefferson Lab Hall B 12 GeV Upgrade Drift Chamber Review Jefferson Lab March 6- 8, 2007 CLAS12 Drift Chambers Simulation and Event Reconstruction.
Luca Spogli Università Roma Tre & INFN Roma Tre
Positional and Angular Resolution of the CALICE Pre-Prototype ECAL Hakan Yilmaz.
SksMinus status Hyperball collaboration meeting 2009/3/11 K. Shirotori.
9 September 2004The Straw Tube Chamber1 The CDC Curtis A. Meyer Carnegie Mellon University Physics Requirements and Specifications Prototype Construction.
Main Drift Chamber Yuanbo Chen Ihep Motivation (MDC IV) The BGO crystal used in L3 will be used for BES III ’ s Calorimeter. The space for MDC.
Silicon Detector Tracking ALCPG Workshop Cornell July 15, 2003 John Jaros.
Progress on the beam tracking instrumentation Position measurement device Tests performed and their resolution Decision on electronics Summary.
March 7, 2007 CLAS12 Drift Chamber Review Mac Mestayer CLAS12 Drift Chamber Construction - Mac Mestayer Technical Details of Construction —buy endplates.
Muon detection in NA60  Experiment setup and operation principle  Coping with background R.Shahoyan, IST (Lisbon)
PERFORMANCE OF THE PHENIX SOUTH MUON ARM Kenneth F. Read Oak Ridge National Lab & University of Tennessee for the PHENIX Collaboration Quark Matter 2002.
CLAS12 Drift Chamber Prototyping
DC12: Tracking/simulation needs CLAS12 Drift Chambers – Physics specifications high efficiency at large solid angle (5 o to 40 o ; 50% f coverage.
2002 LHC days in Split Sandra Horvat 08 – 12 October, Ruđer Bošković Institute, Zagreb Max-Planck-Institute for Physics, Munich Potential is here...
March 7, 2007 CLAS12 Drift Chamber Review Mac Mestayer CLAS12 Drift Chamber Construction - Mac Mestayer Technical Details of Construction —buy endplates.
Momentum Corrections for E5 Data Set R. Burrell, G.P. Gilfoyle University of Richmond, Physics Department CEBAF The Continuous Electron Beam Accelerating.
J-PARC でのハイパー核ガンマ線分光実験用 散乱粒子磁気スペクトロメータ検出器の準備 状況 東北大理, 岐阜大教 A, KEK B 白鳥昂太郎, 田村裕和, 鵜養美冬 A, 石元茂 B, 大谷友和, 小池武志, 佐藤美沙子, 千賀信幸, 細見健二, 馬越, 三輪浩司, 山本剛史, 他 Hyperball-J.
1 A CLUster COUnting Drift Chamber for ILC …and… can we adapt this chamber to SuperB ? F.Grancagnolo, INFN – Lecce, Italy.
The Detector Performance Study for the Barrel Section of the ATLAS Semiconductor Tracker (SCT) with Cosmic Rays Yoshikazu Nagai (Univ. of Tsukuba) For.
Review of Micromegas Tracking Detectors for CLAS12 – May 7, 2009 Reviewers: Madhu Dixit, Mac Mestayer Presentations covered the following topics: –detector.
March 7, 2007 CLAS12 Drift Chamber Review Mac Mestayer Drift Chambers for CLAS12 - Mac Mestayer Context: how does it fit within CLAS12 ? Specifications:
The BoNuS Detector: A Radial Time Projection Chamber for tracking Spectator Protons Howard Fenker, Jefferson Lab This work was partially supported by DOE.
CLAS12 Torus Magnetic Field Mapping Torus Magnetic Field - qualitative look at the field distribution How well do we need to know the B-field? - momentum.
CDC Upgrade Beam background Simulation study Idea for upgrade Upgrade plan Summary Shoji Uno (KEK) Mar-20 th, 2008.
Hall-B Meeting : July 17, 2006 Mac Mestayer Problems in the CLAS Drift Chambers We’ve had a couple of problems: ~60 severe* / year 16 broken wires 5 -
Drift Chamber Review Jefferson Lab 6-8 March 2007 CLAS12 Drift Chamber Electronics R. Chris Cuevas Group Leader -- Fast Electronics Jefferson Lab Physics.
1 PANDA FWD Meeting, GSI-Darmstadt, Preparation of the TDR for the forward tracker University Ferrara + Jagiellonian University, Cracow Main.
BABAR  &  L. de Brunhoff Drift Chamber System BABAR Drift Chamber Project Co-System Managers D.B.MacFarlane, McGill University A.J.S.Smith, Princeton.
Tracking software of the BESIII drift chamber Linghui WU For the BESIII MDC software group.
G. Finocchiaro – INFN LNF XI SuperB General Meeting DCH-I parallel session LNF, 1 December 2009.
Precision Drift Tube Detectors for High Counting Rates O. Kortner, H. Kroha, F. Legger, R. Richter Max-Planck-Institut für Physik, Munich, Germany A. Engl,
Drift Chamber Prototyping Plans at ODU Gail Dodge, Tom Hartlove, Mac Mestayer Nov. 18, 2005 Goals for FY06: Design 144 cell prototype of R1 Drift Chamber.
FWD Meeting, Torino, June 16th, News from Cracow on the forward tracking J. Smyrski Institute of Physics UJ Tests of CARIOCA and LUMICAL preamplifiers.
Charged Particle Tracking for CLAS12
Garfield studies of cell layouts
CLAS12 Forward Tracking: Status and Challenges
S.Movchan Straw prototype beam test into the NA48 infrastructure
CLAS12 Beamline Configurations
Layout of Detectors for CLIC
Tracking results from Au+Au test Beam
BoNuS: Radial-Drift TPC using Curved GEMs
WBS: : Tracking for CLAS12
Drift Chambers for CLAS12 -Mac Mestayer
Region I: stringing 1/3 done on 1st chamber!
CLAS12 Tracking Design (ca. 2005) a basic design parameters
Feb. 2, 2007 CLAS12 Upgrade Workshop Mac Mestayer
DC monitoring - calibration - simulation - corrections
Preparation of the CLAS12 First Experiment Status and Time-Line
Niels Tuning (Outer Tracker Group LHCb)
Presentation transcript:

March 7, 2007 CLAS12 Drift Chamber Review Mac Mestayer Drift Chambers for CLAS12 - Mac Mestayer Context: how does it fit within CLAS12 ? Specifications: physics  tracking specs.  design concepts  design Design concepts: –‘regions’  superlayers  layers  cells –‘umbrella’ design: minimize  dead – planar layout, triangular boxes: accuracy Simulations, Prototyping Issues Planned improvements and conclusion

March 7, 2007 CLAS12 Drift Chamber Review Mac Mestayer Toroidal magnet ∫ B dl ~ 3 T-m 6 “sectors” between coils 3 “regions” of DC ! 2 superlayers/region 6 layers/superlayer 112 wires/layer sense wires Drift Chambers for CLAS12

March 7, 2007 CLAS12 Drift Chamber Review Mac Mestayer electron beam –shift in  ~ 1 mrad  2.5% shift in cross-sections small cross-sections –L = /cm 2 /sec measure hadronic state (esp. excl. reactions) –reject extra particles (missing mass) |dp| ~ 50 MeV/c, sin  p &  p ~ 20 MeV/c –other cuts: co-planarity, etc.  ~5 mrad forward-going particles –5 o minimum lab angle broad coverage in center-of-mass –minimize dead area Tracking: physics  design spec’s

March 7, 2007 CLAS12 Drift Chamber Review Mac Mestayer Goals:Specifications: measure cross-section accurately  ~ 1 mrad dp/p < 1% select an exclusive reaction; e.g. only one missing pion  p <.05 GeV/c  p <.02 GeV/c sin   p <.02 GeV/c small cross-sections L = /cm 2 /s high efficiency good acceptance  ~ 50% at 5 o Design Specification

March 7, 2007 CLAS12 Drift Chamber Review Mac Mestayer measure charged tracks (5 o – 40 o ) CLAS12 Drift Chambers DC’s: same concept as present chambers - but planar hexagonal cells 6 sectors, 3 regions 2 super-layers/region 6 layers/super-layer 112 wires/layer (24192) angled endplates on-board pre-amps

March 7, 2007 CLAS12 Drift Chamber Review Mac Mestayer Torus magnetic field ∫B∙dl ~ 3 T-m highest field for forward tracks

March 7, 2007 CLAS12 Drift Chamber Review Mac Mestayer Drift chamber layout Six sectors: Region 1 Design Principles: –large solid angle (minimize dead area) –accurate (250  m position accuracy) –practical (install, survey, calibrate) –cost effective ~2m central SVT and target

March 7, 2007 CLAS12 Drift Chamber Review Mac Mestayer accurate construction endplates, “boxes” practical: install, survey, calibrate, repair –planar chambers –identical cells –triangular boxes –self-supporting Planar chambers “triangular” shape Dave Kashy’s talk Error Budget: individual sources < 25  m

March 7, 2007 CLAS12 Drift Chamber Review Mac Mestayer Wire Layout Staggered “Brick-Wall” Hexagonal hit wires shown in yellow circles represent drift distances field sense field sense. sense field sense field 6 sense layers, 2 guard layers, 14 field layers: 1 superlayer

March 7, 2007 CLAS12 Drift Chamber Review Mac Mestayer DC design details gas: Ar/CO 2 (92:08) gain ~ 5 ∙ 10 4 (sensitive to ionization electrons) drift velocity ~ 25 to 50  m/ns time windows: ~ 150, , 500 ns material choices: –wire: 30  m W, 140  m Al, 140  m stainless steel (SS) –endplates: aluminum, Stesalit, aluminum –Noryl plastic feed-throughs, SS insert –gas system: SS, small sections of Nylon, Al-Mylar –FR4 circuit boards

March 7, 2007 CLAS12 Drift Chamber Review Mac Mestayer Drift Velocity Calculation 20  m wire 2325 V 88:12 AR:CO 2 30  m wire 2475 V 92:08 AR:CO 2 same gain 58% faster - and more linear ! use 30  m wire! R3 cell

March 7, 2007 CLAS12 Drift Chamber Review Mac Mestayer Design based on “slanted” endplates endplates minimize dead area 8 mm

March 7, 2007 CLAS12 Drift Chamber Review Mac Mestayer Stiffening Frame: Extra Thickness where it Counts minimize dead area stiffening frame

March 7, 2007 CLAS12 Drift Chamber Review Mac Mestayer large solid angle (minimize dead area) –small aspect ratio pre-amp boards –extend in z to maximize azimuthal coverage –flanges stiffen frame; do not extend dead area Circuit Board Placement

March 7, 2007 CLAS12 Drift Chamber Review Mac Mestayer 1  A electrons Pre-amp 2 mV/  A Post-amp x 10 - x mV disc. drift chamber 75 ft. cable TDC’s Lecroy 1877 new circuit boards Chris Cuevas’ talk Electronics: Chamber  TDC

March 7, 2007 CLAS12 Drift Chamber Review Mac Mestayer Forward Tracker: Expected Resolution dp/p, d , d , dx - plotted versus p - at 35 o 1% 0.5 mrad 100 microns dominated by multiple scattering

March 7, 2007 CLAS12 Drift Chamber Review Mac Mestayer Forward Tracking: Momentum Resolution fractional momentum resolution vs. momentum different configurations

March 7, 2007 CLAS12 Drift Chamber Review Mac Mestayer Forward Tracking: Momentum Resolution 250  350  m fractional momentum resolution vs. momentum

March 7, 2007 CLAS12 Drift Chamber Review Mac Mestayer Performance: efficiencies; resolutions Rate studies: –extrapolation from present CLAS decrease solid angle, time window, thickness of DC cells –estimates of layer occupancy present studies show efficiency fall-off about 4% occupancy estimates don’t require track reconstruction –generate tracks with background; reconstruct tracks the best method Latifa Elouadrhiri’s talk

March 7, 2007 CLAS12 Drift Chamber Review Mac Mestayer Improved Rate Capability: relative to CLAS –factor of 3: one cell’s angular size 1/3 as large o instead of o, 70% as many wires –factor of 1.5: smaller time window thicker wire, higher field, faster gas –factor of ~ 5: better shielding larger solenoid, better absorber Tracking will be efficient at /cm 2 /s Performance: Drift Chamber Rate Capability Latifa Elouadrhiri’s talk

March 7, 2007 CLAS12 Drift Chamber Review Mac Mestayer Specifications:Design Features: L = /cm 2 /s - high efficiency with large backgrounds small cells six 6-layer superlayers 30  m wires  p/p < 1%  mrad planar chambers identical cells (easy to calibrate) ~linear drift velocity +/- 6 o stereo angle good acceptanceflanged frame low wire tensions  ~ 50% of 2  at 5 o reliabilityself-supporting structure Summary : specifications  design concepts

March 7, 2007 CLAS12 Drift Chamber Review Mac Mestayer Drift Chamber Design Decisions 6x6 layersrobust track-finding +/- 6 o stereo better  resolution than CLAS planar; self-supportingidentical cells, easy to calibrate, survey, repair 112 wires/layerenough for operation 30  m sense wire 92/08 Ar:CO 2 faster, linear distance-vs-time, strong, more reliable stringing low wire tensionthinner endplates on-chamber amplifiersgood signal/noise re-use hv, lv, ADB, TDClots of spares; cost savings; better segmentation

March 7, 2007 CLAS12 Drift Chamber Review Mac Mestayer Features that require most design work Chamber “boxes” - especially attachments, relative alignments, ease of installation and removal Region 2 attachment method; –specifications for torus On-chamber PCB’s - small space Region 3: outer “skin”, inner posts Cable routing - mundane but important Design Plans: Drift Chambers

March 7, 2007 CLAS12 Drift Chamber Review Mac Mestayer New features that require prototypes smaller cells, thicker wire, less CO 2 –higher voltages: leakage current, cathode emission –higher electro-static forces –less quenching pre-bowed endplate –accuracy of wire placement all-plastic feedthroughs –is wire sensitive near feedthrough? Prototyping Plans: Drift Chambers Stephen Bueltman’s talk

March 7, 2007 CLAS12 Drift Chamber Review Mac Mestayer Conclusions Design is a modest extrapolation –still a challenge to improve basic design: robust track-finding; good design resolution shielding: factor of ten; study permutations (mis-steering) gas, utilities, TDC’s fine; want better segmentation on-board electronics: good design; small footprint mechanical: minimize  dead ; design in tight specifications; practical considerations: easy to install, survey prototyping: discover flaws; refine procedures construction: many details We are ready for the challenge ! Latifa George Chris Dave Stephen