7 th B2GM SVD Summary 19 November 2010 Markus Friedl (HEPHY Vienna)

Slides:



Advertisements
Similar presentations
The Belle II Silicon Vertex Detector Markus Friedl (HEPHY Vienna) for the Belle II SVD Group VCI, 13 February 2013.
Advertisements

17 February 2010 The Silicon Vertex Detector of the Belle II Experiment VCI 2010 M.Friedl, T.Bergauer, I.Gfall, C.Irmler, M.Valentan (HEPHY Vienna)
24 June 2010 Immanuel Gfall (HEPHY Vienna) CO 2 Cooling for PXD/SVD IDM Meeting.
A Low Mass On-chip Readout Scheme for Double-sided Silicon Strip Detectors 13th February 2013 C. Irmler, T. Bergauer, A. Frankenberger, M. Friedl, I. Gfall,
ATLAS SCT Endcap Detector Modules Lutz Feld University of Freiburg for the ATLAS SCT Collaboration Vertex m.
DC/DC Converters Markus Friedl (HEPHY Vienna) B2GM, 14 March 2012.
Electrical QA Markus Friedl (HEPHY Vienna) IPMU, 19 March 2012.
Belle-II Meeting Nov Nov Thomas Bergauer (HEPHY Vienna) Status of DSSD Sensors.
Milestones and Schedule of SVD Construction Markus Friedl (HEPHY Vienna) on behalf of the Belle II SVD Collaboration BPAC October 2012.
Summary of the SVD session 19 March 2009 T. Tsuboyama (KEK)
The Belle II Silicon Vertex Detector Readout Chain Markus Friedl (HEPHY Vienna) TWEPP2012, 19 September 2012.
The Origami Chip-on-Sensor Concept for Low-Mass Readout of Double-Sided Silicon Detectors M.Friedl, C.Irmler, M.Pernicka HEPHY Vienna.
Construction and Performance of a Double-Sided Silicon Detector Module using the Origami Concept C. Irmler, M. Friedl, M. Pernicka HEPHY Vienna.
Department of Semiconductor Detectors HEPHY Scientific Advisory Board 21 Oct Thomas Bergauer.
21 Sept 2009 Markus Friedl Electronics 1 Electronics 2 Machine Shop HEPHY Scientific Advisory Board Meeting.
DC/DC Converter Update Markus Friedl (HEPHY Vienna) B2GM, 22 July 2012.
M.Friedl, C.Irmler, M.Pernicka HEPHY Vienna
19 November 2009 Christian Irmler (HEPHY Vienna) APV25 and Origami Scheme 4 th Open Meeting of the Belle II Collaboration.
Electrical Quality Assurance Markus Friedl HEPHY Site Qualification, 6 August 2015.
18 November 2010 Immanuel Gfall (HEPHY Vienna) SVD IR Mechanics 7 th B2GM.
27 January 2010 Immanuel Gfall (HEPHY Vienna) Belle II SVD Mechanics and Cooling DEPFET Meeting Prag.
18 November 2010 Immanuel Gfall (HEPHY Vienna) SVD Mechanics IDM.
26 April 2013 Immanuel Gfall (HEPHY Vienna) Belle II SVD Overview.
23 July 2012 Thoms Bergauer (HEPHY Vienna) Sensor Irradiations and Testbeams 12 th B2GM Bad Aibling.
APV25 for SuperBelle SVD M.Friedl HEPHY Vienna. 2Markus Friedl (HEPHY Vienna)11 Dec 2008 APV25 Developed for CMS by IC London and RAL (70k chips installed)
Origami Chip-on-Sensor Design: Progress and New Developments 19th September 2012 TWEPP 2012, C. Irmler (HEPHY Vienna) TWEPP 2012, Oxford University.
DAQ Scheme and Beam Test Results H. Asano, M. Friedl, H. Hyun, T. Higuchi, C. Irmler, Z. Natkaniec, W. Ostrowicz, M. Pernicka, T. Tsubuyama.
Status of SVD Readout Electronics Markus Friedl (HEPHY Vienna) on behalf of the Belle II SVD Collaboration BPAC October 2012.
Construction and Test of the First Belle II SVD Ladder Implementing the Origami Chip-on-Sensor Design 29 Sept TWEPP 2015, C. Irmler (HEPHY Vienna)
The Belle II Silicon Vertex Detector Florian Buchsteiner (HEPHY Vienna)
25 Oct 2011 The Silicon Vertex Detector of the Belle II Experiment IEEE NSS 2011 Thomas Bergauer (HEPHY Vienna) Valencia.
The Mechanical Structure for the SVD Upgrade
SVD Mechanics Markus Friedl (HEPHY Vienna) BPAC, 26 October 2015.
18 March 2009 Thomas Bergauer Prototype batch of DSSD from commercial vendors & Proposal for SVD Layout HEPHY Vienna.
Tasks and time scale T. Tsuboyama (KEK). DSSD production Test production by Micron and SINTEF (Talk by M. Valentan) HPK decided to restart DSSD business.
11 June 2015 Thomas Bergauer (HEPHY Vienna) Belle II SVD beam Test SPS 2015 SPS users meeting.
Construction and Status of the Origami Module Prototype C. Irmler, M. Friedl HEPHY Vienna.
APV25, Clock and Trigger M.Friedl HEPHY Vienna. 2Markus Friedl (HEPHY Vienna)18 Mar 2009 APV25 Please refer to my December 2008 meeting slides for details.
10 September 2010 Immanuel Gfall (HEPHY Vienna) Belle II SVD Upgrade, Mechanics and Cooling OEPG/FAKT Meeting 2010.
Origami and PA design 6 February 2012 Christian Irmler (HEPHY Vienna) 1 Common SVD-PXD Meeting.
Overview SVD 21 Jan C. Irmler (HEPHY Vienna) 7 th Belle II VXD Workshop, Prague.
SVD DAQ 25 Jan 2011 Belle2 DAQ T. Tsuboyama (KEK)
APVDAQ Status Markus Friedl 22 January M.Friedl: APVDAQ Status2 Introduction What APVDAQ Can Do What APVDAQ Cannot Yet Do What APVDAQ Cannot Do.
SVD DAQ Status Koji Hara (KEK) 2012/7/19 DAQ workshop1.
Prototype of the SVD Finesse Transmitter Board (FTB) (Sender Part for HSD Link) wacek ostrowicz 14 slides The Prototype of the SVD FTB Recent.
Origami and Cooling 24th September 2012 C. Irmler (HEPHY Vienna) Joint PXD and SVD Meeting Göttingen.
Status of the SVD DAQ Koji Hara (KEK) 2012/1/16 TRG/DAQ meeting1.
SVD Cables & Pipes Markus Friedl (HEPHY Vienna) B2GM, 24 July 2012.
25th April 2013 C. Irmler (HEPHY), Y. Onuki (IPMU) Ladder Assembly Procedure Belle II – New Collaborators Meeting.
25 April 2013 Thomas Bergauer (HEPHY Vienna) Components and ladder quality control and testing procedures Belle II Vienna-Pisa meeting.
SVD Status Markus Friedl (HEPHY Vienna) SVD-PXD Göttingen, 25 September 2012.
Electrical Tests of Modules and Ladders Markus Friedl (HEPHY Vienna) 2 October 2014.
13 Januar 2011 Immanuel Gfall (HEPHY Vienna) Annekathrin Frankenberger (HEPHY Vienna) SVD Cooling Cooling Meeting Karlsuhe.
SVD FADC Status Markus Friedl (HEPHY Vienna) Wetzlar SVD-PXD Meeting, 5 February 2013.
Schedule 24 September 2012 Christian Irmler (HEPHY Vienna) Joint PXD and SVD Meeting Göttingen.
SVD Slow Control Markus Friedl (HEPHY Vienna) DAQ/SC Kickoff Meeting, 8 November 2012.
SVD Summary Markus Friedl (HEPHY Vienna) Wetzlar SVD-PXD Meeting, 6 February 2013.
Silicon Vertex Detector Schedule 23 July 2012 Christian Irmler (HEPHY Vienna) 12 th Open Meeting of the Belle II Collaboration.
SVD FADC SVD-PXD Göttingen, 25 September 2012
SVD Electronics Constraints
SVD Introduction Wetzlar SVD-PXD Meeting, 4 February 2013
Electronics & Machine Shop
Markus Friedl (HEPHY Vienna)
Christoph Schwanda (HEPHY Vienna) For the Belle II SVD group
Cooling pipes and Space for Services
Comments to the SVD4 structure
Trigger session report
BPAC, 17 October 2017 VXD GND/EMC Markus Friedl (HEPHY Vienna)
SVD group organization, schedule, milestones
C. Irmler, M. Friedl, M. Pernicka HEPHY Vienna
Presentation transcript:

7 th B2GM SVD Summary 19 November 2010 Markus Friedl (HEPHY Vienna)

Agenda 19 November 2010Markus Friedl (HEPHY Vienna)2 SVD Summary Please look at slides for details.

7 th BG2M SVD Mechanics 18 November 2010 Immanuel Gfall (HEPHY Vienna)

Service Ways 18 November 2010Immanuel Gfall (HEPHY Vienna)4 Ribbon Cables CAD study to show if service space is available Almost straight cable paths are possible Study shows that there is still space left SVD Mechanics

Support Assembly Built around beam pipe SVD support structure is split into halves Beam mask needs to be split as well 18 November 2010Immanuel Gfall (HEPHY Vienna)5 Beam Mask End Rings Support Cone Patch Panel Space SVD Mechanics

Cooling: CO 2 Blow System 18 November 2010Immanuel Gfall (HEPHY Vienna)6 T= 23°C P=57bar T> -20°C P=57bar T= -20°C P=20bar SVD Mechanics

SVD Readout Electronics Markus Friedl (HEPHY Vienna)

Location of FADCs & Power Supplies At side of KLM Accessible during running Alternatively on top of KLM (but then locked) Ideally here 1 rack on each side (forward, backward) + power supplies 18 November 2010Markus Friedl (HEPHY Vienna)8

Gamma Irradiation (3-5 October 2010) Mol (Belgium) 1.25MCi (all rods) 60 Co source (  ) under water 3.4 MRad (water) per hour at peak position Performed in the middle of beam SPS (CERN) 18 November 2010Markus Friedl (HEPHY Vienna)9 SVD Readout Electronics

Parts for Irradiation 18 November 2010Markus Friedl (HEPHY Vienna)10 Origami module Micron trapezoidal module Micron baby modules Electronics SVD Readout Electronics

Irradiation Summary w.r.t. Electronics Voltage Regulator (LHC4913) –Literature says it withstands 100MRad, confirmed to 70MRad –Perfectly fits our needs Humidity Sensor (SHT21)  –Not radiation hard –Radiation tolerant sensors used in LHC are not available anymore (company disappeared) –CERN people try different concept with cooled mirror (condensation) and reflectivity measurement –I am afraid this will not be too bulky to install in Belle II SVD –Presently, I can only think of humidity measurements outside the radiation area (=dry air blown in and sucked out of SVD volume) 18 November 2010Markus Friedl (HEPHY Vienna)11 SVD Readout Electronics

SVD Finesse Transmitter Board (FTB) (Sender Part for HSD Link) slides wacek ostrowicz Version 12 For SVD session of VII B2GM ( )

SVD Finesse Transmitter Board (FTB) (Sender Part for HSD Link) wacek ostrowicz2/6 General view – 40 sets of two boards PIXEL DAQ Giessen Box opt F E E l e c t r o n i c s TTD RJ45 #1 #81 #80 RJ45 … #2 COPPER#40 opt FRB COPPER#2 opt FRB COPPER#1 opt FRB … #1#40 FTB#80 opt FADC#80 RJ45 FTB#2 opt FADC#2 RJ45 FTB#1 opt FADC#1 RJ45 SVD electronics SVD-CONTROLLER (SVDctlr) FCRB RJ45 SVD tracker

SVD Finesse Transmitter Board (FTB) (Sender Part for HSD Link) wacek ostrowicz5/6 SVD FINESSE COPPER in Cracow Prototype - tests setup FPGA Spartan6 RJ45 OpTr DRIVERS POWER OSC 42MHz 160 pin connector ext POWER Regs handl DRIVERS Clock distrib RJ45 config FPGA Spartan6 RJ45 OpTr DRIVERS POWER OSC 42MHz 160 pin connector ext POWER Regs handl DRIVERS Clock distrib RJ45 config FTB prototype – FINESSE adapter SVD FINESSE

First results of the beam test at SPS 2010 C. Irmler, M. Valentan (HEPHY Vienna)

The devices under test Origami 6” module Micron Wedge moduleMicron Baby module Pitch p, n# strips p, ninterm. Strip p,np-stopThickness Origami75, , 512yes, yesatoll320 Wedge sensor50-75, , 512yes, yescombined304 Baby sensor50, , 256yes, no3 different304 First Beam Test Results 18 November 2010C. Irmler, M. Valentan (HEPHY Vienna)16

Origami module performance Signal and SNR of Origami #2, p-side, -10 °C First Beam Test Results 18 November 2010C. Irmler, M. Valentan (HEPHY Vienna)17

Origami Cooling cooling of APV chip surface used adapted APV settings for subzero cooling coolant: water with glycol anti-freeze best -10 deg. C Cooling First Beam Test Results 18 November 2010C. Irmler, M. Valentan (HEPHY Vienna)18

First results, SNR References [1] and [2] favor combined pattern Worst option according to our measurements! [1] IEEE Transactions On Nuclear Science 45 (1998) Iwata et.al. - Optimal P-Stop Pattern for the N-Side Strip Isolation of Silicon Microstrip Detectors [2] IEEE Transactions On Nuclear Science 45 (1998) Unno et.al. - Evaluation of P-stop Structures in the N-side of N-on-N Silicon Strip Detector First Beam Test Results 18 November 2010C. Irmler, M. Valentan (HEPHY Vienna)19

21 SVD material budget

22 p T =.1 to.2 GeV Cellular automaton algorithm

23

SVD: Straight vs. Slanted Markus Friedl (HEPHY Vienna)

Items from Ushiroda-san’s List Performance –See next presentation by Zbynek Cost –Barrel needs +31 sensors (  +150k€), +310 APV25 chips & additional FADCs (  +150k€), FTBs, Copper boards,… –Total  +400k€ Service Space, Mechanical Feasibility –No problem (see Immanuel‘s talk on mechanics) Beam Masks –Not affected at important location (close to IP) 18 November 2010Markus Friedl (HEPHY Vienna)28 SVD: Straight vs. Slanted

How to Proceed? 1. Let’s see Zbynek’s results 2. Let’s start discussion Decision may be deferred to Cracow meeting (13/14 December 2010) There was a discussion including tracking & alignment. Then the decision was taken in favor of slanted option. 18 November 2010Markus Friedl (HEPHY Vienna)29

18 November 2010C. Irmler, M. Valentan (HEPHY Vienna)33 First beam test results