ULDC SCADA Present Status Scada is extensively used Data storage and retrieval being done DDC being used.Automatic Triggering to be programmed. State Estimator on a truncated mode run by all constituents Similar Day forecasting being done
Task Force Agenda Areas Identified for Improvement –Network Configuration –Errors in Telemetry –Database Errors –Status indications –Transformer Taps –Alarm filtering
Training needs analysis –User level training for system operators –Workshops for EMS software –System administration Aix/Router/ NMS –TDS Database administration
Hardware Test Bench
Maintenance Philosophy Constituents - Regular Maintenance Power Grid -Major/Special Maintenance Annual Maintenance Contract Sites - First Level GEH - On Call Support
Annual Maintenance Contract Response Time RLDC during Working Hours 0Hrs RLDC during other Hours 4Hrs SLDC/SCC24Hrs RTU’S48hrs Consumables to be provided by constituents Spares in the scope of GEH Extension of contract by one year at same rates possible.
Annual Maintenance Contract Philosophy Sites - First Level GEH - On Call Support Staffing Hard Ware 2 Engineers Soft Ware 2 Engineers Firm Ware/RTU 2 Engineers