1 TBG17 Progress Report TBG6 Meeting New Delhi Forum October 2 - 6, 2006.

Slides:



Advertisements
Similar presentations
Doc.: IEEE wng0 Submission November, 2013 Pat Kinney, Kinney ConsultingSlide 1 Project: IEEE P Working Group for Wireless Personal.
Advertisements

THE STANDARDS DEVELOPMENT PROCESS STEP 1 PUBLIC AND COMMITTEE PROPOSAL STAGE PUBLIC AND COMMITTEE PROPOSAL CLOSING DATE FIRST TECHNICAL COMMITTEE MEETING.
TMG Report to the Plenary UN/CEFACT TMG Report Chair: Gunther Stuhec Vice Chair: Christian Huemer.
TBG17 TBG17 – June 2010 Interim Meeting Hello and Welcome to Germany.
Proposed TC Issues Process Martin Chapman. Purpose An issues driven process helps to 1.Untangle un-conflate problems 2.Narrow focus to solving particular.
UN/CEFACT Forum, Bonn Germany 2004 Closing Plenary 12 th March 2004 UN/CEFACT U NITED N ATIONS C ENTRE F OR T RADE F ACILITATION A ND E LECTRONIC B USINESS.
SIP working group status Keith Drage, Dean Willis.
U NITED N ATIONS C ENTRE F OR T RADE F ACILITATION A ND E LECTRONIC B USINESS United Nations Economic Commission for Europe UN/CEFACT UN/CEFACT Core Components.
14 May th UN/CEFACT Plenary1 Applied Technologies Group Chair Mark Crawford Vice Chairs Gait Boxman Jostein Frømyr
30 March th UN/CEFACT Forum - Dublin1 10th UN/CEFACT FORUM March Dublin, Ireland Forum Host & Supporting Sponsors:
Slide 1 UBL Forum Tim McGrath Vice Chair UBL Technical Committee Allerod, Denmark November UBL and UN/CEFACT a status report.
Copyright © Open Applications Group, Inc. All rights reserved 1 © Copyright 2009 Open Applications Group Improving OAGIS with Ontology Technology.
UN/CEFACT Forum Wednesday, 16 March 2005 Lunch & Learn ATG XML NDR Mark Crawford ATG2 Chair U NITED N ATIONS C ENTRE F OR T RADE F ACILITATION A ND E LECTRONIC.
UN/CEFACT TMG Closing Plenary Syndey Face-to-Face Interim Meeting 9-13 January 2006 at Newport Mirage Hotel.
Second Annual Japan CDISC Group (JCG) Meeting 28 January 2004 Julie Evans Director, Technical Services.
th UN/CEFACT Forum ● TMG Closing Plenary1 7th UN/CEFACT Forum: Lyon, France Techniques & Methodologies Group (TMG) Closing Plenary 30 September.
Applied Technologies Group Report Chair: Mark Crawford Vice Chair: Jostein Frømyr Vice Chair: Gait Boxman.
ATG Applied Technologies Group Report Chair: Mark Crawford Vice Chair: Gait Boxman Vice Chair: Jostein Frømyr.
ISURF -An Interoperability Service Utility for Collaborative Supply Chain Planning across Multiple Domains Prof. Dr. Asuman Dogac METU-SRDC Turkey METU.
UN/CEFACT Common Methodologies Mark Crawford, SAP Mike Rowell, Oracle Philipp Liegl, TUWIEN.
UN/CEFACT TMG Closing Plenary  New Delhi, IndiaSlide 1 UN/CEFACT TMG Closing Plenary New Delhi, India 02 – 06 October 2006.
Slide 1 IEEE 802 Response to FDIS comments on IEEE 802.1AS 20 March 2014 Authors: NameCompanyPhone .
UN/CEFACT TMG Closing Plenary  Zurich, SwitzerlandSlide 1 UN/CEFACT TMG Closing Plenary Zurich, Switzerland 10 – 14 December 2007 Gunther Stuhec,
IEEE /r3 Submission September 2008 John Notor, Cadence Design Systems, Inc.Slide 1 IEEE IMT-Advanced Review Process Date:
UN/CEFACT TMG Meeting UN/CEFACT TMG Meeting Closing Plenary 6 – 10 June 2005 Walldorf/Germany.
OASIS UBL TC Meeting Jon Bosak, Sun Microsystems Chair, OASIS UBL Technical Committee Closing Plenary Burlington, Massachusetts 4 October 2002.
UN/CEFACT Technical Update AFACT TMC 16Jun2015 Tehran, Iran.
Learning Objects Metadata IEEE P Learning Technology Standards Committee London, UK March 16, 2000 Chair: Wayne Hodgins.
Status of Collaboration with UN/CEFACT Tim McGrath UBL Plenary Stockholm Sept
XML Working Group Joan Ugljesa NDIA PMSC August 7,
A way to proceed… Martin Forsberg. We have a few problems with huge impact on development and adoption We have: No control over versioning Names and definitions.
U NITED N ATIONS C ENTRE F OR T RADE F ACILITATION A ND E LECTRONIC B USINESS Under the auspices of United Nations Economic Commission for Europe UN/CEFACT.
13 th UN/CEFACT Plenary Geneva, May 2007 UN/CEFACT Forum Report Forum Management Group Chair: Mike Doran Vice-Chair: Anders Grangard.
U NITED N ATIONS C ENTRE F OR T RADE F ACILITATION A ND E LECTRONIC B USINESS Under the auspices of United Nations Economic Commission for Europe UN/CEFACT.
UCM Team Update on 13th UN/CEFACT Forum Senegal November 2008 (condensed from closing plenary) Scott R. Hinkelman.
Rolling Resistance Standards Work at ISO (TC31 WG6) Prepared for GRB Review 19 Sep 2011 Angela Wolynski WG6 Convenor Informal document GRB (54th.
UN Economic Commission for Europe 18 th UN/CEFACT PLENARY Methodology & Technology Programme Development Area Report Peter Amstutz & Tim McGrath UN/CEFACT.
UN/CEFACT TMG Closing Plenary  Dublin, IrelandSlide 1 UN/CEFACT TMG Closing Plenary Chair: Gunther Stuhec Vice Chair: Christian Huemer Secretary:
Business Informatics Group Institute of Software Technology and Interactive Systems Vienna University of Technology Favoritenstraße 9-11/188-3, 1040 Vienna,
Technical Track Update Mavis Cournane, Chair Hong Kong Plenary 14 May 2004.
1 UBL Library Content Sub-Committee November 1st 2001.
Syntax and Methodology Issues Chris Hassler Kevin Smith.
TGDC Meeting, July 2011 Voluntary Voting System Guidelines Roadmap Nelson Hastings, Ph.D. Technical Project Leader for Voting Standards, ITL
Dictionary based interchanges for iSURF -An Interoperability Service Utility for Collaborative Supply Chain Planning across Multiple Domains David Webber.
1 UCM meeting notes 4/10/08 Mexico City Meeting Notes (S. Hinkelman) Agenda Categorize available use cases Review inventory of current contributions (for.
PRIIA 305 Diesel Electric Locomotive Specification Independent Review Larry Salci February 15, 2011 Washington, D.C.
UN Economic Commission for Europe Online Registry Developments Garret Minakawa Coen Janssen 3 September 2010 UN/CEFACT Forum International Conference Centre,
TBG17 TBG17 – February 2011 Interim Meeting Hello and Welcome to the US.
Joint BPS and ESS/ITS ATC/AFC Subcommittee Update November 2007 – January 2008 February 5, 2008.
Doc.: IEEE /0054r0 Submission March 2013 Mika Kasslin, NokiaSlide 1 TG1 Closing Report for March 2013 Notice: This document has been prepared.
UN/CEFACT TMG Closing Plenary  Vancouver, CanadaSlide 1 UN/CEFACT TMG Closing Plenary Vancouver, Canada 12 – 17 March 2006.
July 11, 2008OASIS SET TC OASIS Semantic Support for Electronic Business Document Interoperability (SET) TC Overview.
DEX Publication Project OASIS PLCS TC Face to Face meeting 10 March 2008 Trine Hansen.
Doc.: IEEE Submission November 2007 Michael Lynch, Nortel Networks Update on IEEE IMT Advanced RR-TAG was directed to take.
TBG1 - UBL Convergence Project Core Group Progress Report New Delhi - October 2006.
How to Conduct Robert’s Rules of Order Newly Revised 11 th Edition.
Applied Technologies Group Report Chair: Mark Crawford Vice Chair: Jostein Frømyr Vice Chair: Gait Boxman.
COMET Working Group Progress Report 11/13/03
Status of Collaboration With UN/CEFACT
Core Components and More
UBL: Library Content subcommittee
in UN/CEFACT and relationships with other standards initiatives?
doc.: IEEE /479r0 Mika Kasslin TGh chair
Hydrographic Services and Standards Committee
doc.: IEEE /479r0 Mika Kasslin TGh chair
Statewide Accountability
Comments on IMT-Advanced Review Process
17 April 2018 Progress report ccc General capacity requirements for SAIs for conducting IT audits.
International Trade & Business Process Group (TBG)
Presentation transcript:

1 TBG17 Progress Report TBG6 Meeting New Delhi Forum October 2 - 6, 2006

2 Summary TBG17 Stockholm Interim Meeting –Administrative Issues –Interactions with Forum Groups –P1 Items –Harmonization Results Post Stockholm Progress

3 TBG17 Stockholm Interim Meeting August 14 – 18, 2006

4 Administrative Issues Consensus was defined –Does not mean unanimity, disagreement is possible –Votes will be taken as necessary –Minority opinions will be written into the minutes upon request Next Meetings –13 – 17 November, 2006, Seoul –12 – 16 February, 2007, Redwood City (tentative) –7 – 11 May, 2007, Berlin (tentative) –Other possibilities: London, Washington D.C., Detroit

5 Interactions with Forum Groups

6 ATG2 Work continues on the eTendering schemas, and no issues were raised to be brought up in TBG17 There are still outstanding issues with the TBG1 Cross Industry Invoice message assemblies. An attempt was made to resolve them, but more input was needed, so they were referred back to TBG1 Among the issues raised by the TBG1 Cross Industry Invoice submission were some that need to be resolved via a CCMA technical specification. The issue was to be addressed at the FMG meeting on August 21 Mark Crawford reported on the convergence work between the NDRs and OAGi work. ATG2 will work on this as part of the new NDR proposal ATG2 will propose taking over responsibility for the core data types, decoupling it from CCTS

7 TMG Due to low participation levels, and a large number of comments from the first public review draft of CCTS, work on approving CCRS version 3 is progressing slowly. The hope is to have it completed by December, 2006 Unified Context Methodology (UCM) is close to finishing the first draft for public review

8 ICG The latest version of the UN/CEFACT profile for UN EBXML for RIM is available for review The question of who will build the registry is still unresolved

9 FMG FMG has agreed to align all its publications with the normal publication dates FMG has proposed that all code elements in the data library must have a TDED item and that the CC should reference it. TBG17 objects that while TDED is valuable, nowhere in CCTS is it referenced, and it should not be a requirement. A proposal to that effect will be submitted to FMG

10 P1 Items

11 Project Submission Status TBG6 eTendering, TBG1 Cross Industry Invoice, and TBG9 Small Scale Lodging have all been fully harmonized TBG6 PSCPM has been partially harmonized Only one new project had been submitted, a TBG2/3 joint project, but it was submitted too late for consideration at Stockholm A new spreadsheet was designed to track and publicize submission status

12 Publication Milestones for CCL06B 05 September – Final date for new items 12 September – Final date for change requests 15 September – Final date for new items/change requests to Editor 22 September – Final date for questions from Editors 26 September – Final date for responses from QA/harmonization 29 September – Draft due 04 October – Review during New Delhi Forum

13 Requirements for Publication in the CCL All components that constitute the content model of an ACC must be approved All components that constitute the content model of an ABIE must be approved A BBIE cannot be approved unless its supporting QDT (if any) is approved At least one ABIE based on an ACC must be approved for the ACC to be included All associated ABIEs in the CCL must be approved All similar CCs in the change request library must be harmonized Any ACC or ABIE that meets these requirements at publication time will be moved into the publication CCL

14 Versioning Versioning was a major issue of concern The scope of versioning is larger than just TBG17, so longer term decisions were deferred For CCL06B, the decision was made that: –All new submissions will be version 1.0 –All CCs from CCL06A will be version 1.1

15 P1 Documents Inconsistencies in interpretations of the Submission Guidelines document point out the need to update them to improve clarity and consistency Minor changes to the submission template spreadsheet were identified The Harmonization checklist will need to be updated to comply with the changes to the submission spreadsheet A draft harmonization process document was presented Garret Minakawa was to conduct a general review of the P1 documents for consistency and clarity

16 Miscellaneous Items It was agreed that GEFEG.FX would be the official editing tool for the TBG17 library GEFEG.FX will be an acceptable submission format for TBG17 TBG17 will publish a library of objects that have been harmonized but have not yet been published. It will be available on the TBG17 CORE.gov site. Kevin Smith volunteered to be the keeper of the controlled vocabulary

17 P1 Issues ASBIE Dictionary Names (Rule B25) –TBG17 decided to ask TMG to issue an official errata to clarify rule B25 to explicitly include associated object class qualifiers in the dictionary entry name Unqualified ABIEs –The issue of allowing unqualified ABIEs was first addressed in London –A large number of unanswered questions arose out of that discussion –Versioning tied to this issue –Two motions were put forward, neither gained majority support –The decision to allow unqualified ABIEs was deferred

18 P1 Issues (cont.) Name as a Representation Term –After reviewing the existing library, it was decided that allowing Name as a representation term would cause more confusion than clarity –The London decision was reversed –TBG17 will ask FMG to resolve the differences between the CCTS and the decision of TBG17 Generic Type Data Elements –Defined as BCC Property Term + Representation Term –CCL06A was reviewed for consistency Changes will be proposed for a future library –A definition list of generic type data elements will be provided

19 Harmonization PSCPM was the only project ready for harmonization at this meeting About a day and a half of the session was devoted to PSCPM harmonization During that time we harmonzied –2 ACCs –9 BCCs –3 ASCCs –8 ABIEs –50 BBIEs –14 ASBIEs –4 QDTs Overall, the project went from 30% harmonzied to 43%

20 Post Stockholm TBG17 Activities

21 Administrative Only one nomination was received for TBG17 Chair: Mary Kay Blantz. She was named chairman by acclamation Only one nomination has been received for TBG17 Vice Chair: Marion Royal. Since Marion does not have funding for travel to attend face-to-face meetings, additional nominees are desired

22 Library Issues A number of minor issues with the eTendering and Cross Industry Invoice submissions arose in the course of library publication. They have all been resolved

23 Harmonization In the 5 harmonization meetings since Stockholm, the following items have been harmonized –4 ACCs –28 BCCs –14 ASCCs –5 ABIEs –45 BBIEs –18 ASBIEs –6 QDTs We have gone from 43% harmonized to 65% harmonized (as of 19SEP06)