DuPont Barksdale and Chequamegon Projects Update July 22, 2008 DuPont CRG.

Slides:



Advertisements
Similar presentations
Chequamegon National Forest Clover and Cabin Lake Sites – Site Investigation Update and Path Forward.
Advertisements

BoRit Superfund Site Timeline
U.S. Environmental Protection Agency Lovers Lane Lead Site Jeffrey A. Lippert, OSC.
Vermilion County Brownfield Assessment Grant. Overview Brownfield Basics USEPA Brownfield Assessment Grant Vermilion County Assessment Grant Site Selection.
Floyd County Board of Commissioners Special Town Hall Meeting Topic: Update on status of Georgetown WWTP.
SWMU 48, 62 and AOC G/SWMU 49 Update Joint Base Charleston Weapons Partnering Meeting December 4, 2013.
Status of 8-Hour Ozone NAAQS Program in Clark County Presentation to Air Quality Forum May 10, 2005.
Federal Mogul Department for Environmental Protection Kentucky Division of Waste Management February 10, 2015 Presented by Chris Jung To Protect and Enhance.
Fort Bliss Energy, Water, and Solid Waste Sustainability Initiatives Draft Environmental Impact Statement (EIS) Public Meetings June & 13, 2013.
Environmental Investigation by Con Edison Former E115th Street Gas Works November 13, 2007.
Vermont Yankee VSNAP Presentation February 22, 2011 Mike Romeo Director NSA.
Enviromental aspects of Brownfield Regeneration Barbara Vojvodíková, Marcela Maturová „This project has been funded with support from the European Commission.
Update on the Remedial Action at the Artillery Impact Area Buffer Zone MRS November 6, 2014 Jeff Fitzmayer Parsons.
Airport Road Waste Disposal Area April 28, 2005 The University of North Carolina at Chapel Hill.
DuPont Barksdale and Chequamegon Projects Update December 12, 2007 DuPont CRG Great Lakes Visitors Center.
Colorado School of Mines Research Institute Site DRAFT REMEDIAL INVESTIGATION/FEASIBILITY STUDY AND PROPOSED PLAN.
EnviroSense, Inc. An Overview of Environmental Factors in Developing Brownfields Sites in Massachusetts Presented By: Eric S. Wood, P.Hg., PG, LSP President.
Former DuPont Barksdale Works Project Update June 07, 2006 Great Lakes Visitors Center DuPont CRG.
THE ADVANCED TECHNOLOGY ENVIRONMENTAL AND ENERGY CENTER (ATEEC) Summative External Evaluation July 1, 2013 – June 30, 2014 PRELIMINARY OUTLINE.
1. Identify Stakeholders 2. Establish the Criteria 3. Identify Potential Sites 4. Initial Screening/ Evaluations & Short List 5. Specific Site Study 6.
Investigating Ground Water Contamination at Ohio’s C&DD Landfills Aaron Shear Ohio’s Solid Waste and C&DD Program Annual Meeting May 9, 2013.
Former DuPont Barksdale Works Project Update August 3, 2005 DuPont Corporate Remediation Group Great Lakes Visitors Center.
Enviromental aspects of Brownfield Regeneration Barbara Vojvodíková, Marcela Maturová „This project has been funded with support from the European Commission.
ACTIVITY NAME Former Naval Station Treasure Island, CA TIDA Board of Directors Meeting 9 July 2014.
Forest harvesting practices are a suite of BMPs that minimize the environmental impacts of road building, log removal, site preparation and forest management.
Former DuPont Barksdale Works Project Update December 14, 2005 Great Lakes Visitors Center DuPont CRG.
An Overview of Environmental Investigations January 22, 2002 Presented by: DuPont Corporate Remediation Group.
Procedures and Processes Phase II: Evaluation CRM Phases I-III This presentation uses materials taken from Ricardo Elia’s Cultural Resources Archaeology.
Underground Storage Tank Compliance Act of 2005 Bill Torrey UST/LUST Regional Program Manager US EPA – New England EBCNE April 19, 2006.
Spectron Superfund Site Proposed Plan Contaminated Shallow Soils U.S. EPA Region III June 26, 2003 Philadelphia, PA Robert J. Sanchez US EPA - Remedial.
History and Cleanup at Chemical Commodities, Inc. Jeff Field US EPA Region 7 1.
Former DuPont Barksdale Works Project Update December 14, 2004 DuPont Corporate Remediation Group Great Lakes Visitors Center.
SITE STATUS UPDATE TOP STOP PETROLEUM RELEASE SITE GUNNISION, UTAH Morgan Atkinson – Division of Environmental Response and Remediation, Project Manager.
Former DuPont Barksdale Works Project Update October 5, 2004 DuPont Corporate Remediation Group Great Lakes Visitors Center.
Former DuPont Barksdale Works Project Update May 19, 2004 DuPont Corporate Remediation Group Great Lakes Visitors Center.
Review of Current Conditions Report and Work Plan for Area 1 Presented by The Great Plains/Rocky Mountain Technical Outreach Services for Communities.
Former DuPont Barksdale Works Project Update December 14, 2006 Great Lakes Visitors Center DuPont CRG.
All About Sanitary Surveys David Edmunds Environmental Program Specialist ADEC Drinking Water Program Sustained Compliance: What It Means to Public Water.
State and Tribal Government Working Group November 12, 2008 FERNALD NATURAL RESOURCE DAMAGES SETTLEMENT.
Area I Burn Pit Santa Susana Field Laboratory RCRA Facility Investigation Work Plan February 19, 2008 Laura Rainey, P.G. Senior Engineering Geologist California.
What is a Public Health Assessment? “The evaluation of data and information on the release of harmful substances into the environment in order to assess.
Active Corrosion Process Nisource – COH/CKY. Objectives  Understanding the terminology –Active Corrosion –& Suspected Areas of “Active Corrosion”  Developing.
Corrective Action Program: Working with Your Local Agency to Solve Local Problems James Clay County of San Diego Department of Environmental Health Site.
Utilities’ Update on Energy Savings Assistance Program Studies Ordered in D LIOB Meeting August 21, 2013 Sacramento, California.
Think safe. Act safe. Be safe. LEHR Site Annual Soil Management Plan Training Sue Fields, Environmental Health & Safety Sept,
Former DuPont Barksdale Works Project Update July 14, 2004 DuPont Corporate Remediation Group Great Lakes Visitors Center.
Underwater archaeology combines fields of study including: Anthropology Chemistry Ethnography Geology History Oceanography.
Results of 2001 Barksdale Site Investigation April 2, 2002 Presented by: DuPont Corporate Remediation Group.
1 FORMER COS COB POWER PLANT From Characterization to Redevelopment Brownfields2006 November 14, 2006.
Marshall Landfill Site.  Patrick Cabbage, Hydrogeologist/Site Manager  Bill Fees, Engineer  Carol Bergin, Public Involvement Coordinator.
Environmental Site Assessments Hazardous Materials/ Regulated Substances Categorical Exclusion Training Class.
Melissa Boggs California Department of Fish and Wildlife, Office of Spill Prevention and Response.
Laboratory Decommissioning : Essential Tools and Lessons Learned Jim Carscadden Division of Environmental Protection Office of Research Facilities.
 Clean Water Act 404 permit  Ohio EPA Division of Surface Water 401 water quality certification  Ohio Revised Code 6111 – Placement of dredged materials.
GEORGIA PACIFIC WEST PROPOSED INTERIM ACTION Public Meeting & Open House – July 12, 2011.
1 EASTERN MUNICIPAL WATER DISTRICT Water Use Efficiency Master Plan Elizabeth Lovsted, PE Senior Civil Engineer January 16, 2016.
Omaha Riverfront Redevelopment Project Brownfields 2004 C. Dale Jacobson, P.E., DEE.
Fort Detrick Installation Restoration Program Area B Groundwater November 1, 2010 Fort Detrick, Maryland A Sustainable Community of Excellence.
Proposed Plan for No Further Action
Placer County Water Agency Middle Fork American River Project FERC Project No February 26, 2008.
Chemical Metals Industries, Inc. (CMI)
RINGWOOD MINES/LANDFILL SITE PUBLIC MEETING December 6, 2016
DuPont Barksdale Site Sampling and Analytical Presentation
Review for Final.
Presentation of 2002 Barksdale Investigations and Path Forward
Brownfield Corrective Action with Revised RRS
Chemical Metals Industries, Inc. (CMI)
Olusola Ayilara, P.E., P.G. PST-DCRP Section, Remediation Division
Board of Public Utilities August 17, 2017
Indiana Finance Authority (IFA)
Presentation transcript:

DuPont Barksdale and Chequamegon Projects Update July 22, 2008 DuPont CRG

July 22, 2008Former DuPont Barksdale Works2 Purpose of Meeting Barksdale: Provide a status update on site priorities and public commitments. Provide a summary of on-going 2008 site activities. Chequamegon-Nicolet National Forest: Provide a status update on site investigation activities at the Cabin Lake and Clover sites.

Former DuPont Barksdale Works Project Update

July 22, 2008Former DuPont Barksdale Works4 Project Priorities Current Priorities:  Identify priority source areas and take appropriate action.  Evaluate for potential off-site surface water issues and take appropriate action. Priorities Addressed: Continue to provide drinking water that meets appropriate Wisconsin regulatory standards for all site-related compounds to residents with impacted wells. Develop plan for long-term drinking water supply and implement as appropriate. Fulfill commitments on Home Value Protection Plan.

July 22, 2008Former DuPont Barksdale Works5 Project Priorities Other Commitments: Continue to work with WDNR in the investigation/cleanup of site- related impacts. Continue to be available and communicate with neighbors.

Summary of 2008 Barksdale Work

July 22, 2008Former DuPont Barksdale Works7 Continue to fulfill water supply commitments Site Investigation Site clearing. Grid sampling of 200 locations. Biased sampling at 300 plus locations. Geophysical work to determine subsurface anomalies. Using explosive detection device (FIDO). Summary of 2008 Work

July 22, 2008Former DuPont Barksdale Works8 map of 08 inv priorities.

July 22, 2008Former DuPont Barksdale Works9 Recovery and Disposal of Residual Site Materials: Removed approximately 800 pounds of DNT. TNT recovery and disposal planned. Evaluation of Remedial Technologies: Field scale bio-pilot being conducted. Continued laboratory studies at GA Tech. University of Waterloo DNX studies. Synthesis of DNX isomers: Completed in early Developing screening values. Summary of 2008 Work

July 22, 2008Former DuPont Barksdale Works10 Alternative Water Supply Waterline Completed December Provides Municipal Drinking Water Access to: 47 Homes 8 Undeveloped Parcels Over 6 million gallons of water delivered through the pipeline since installation.

July 22, 2008Former DuPont Barksdale Works11 Clearing Work Sites

July 22, 2008Former DuPont Barksdale Works12 Residual Product Removal DNT Removal: Discovered solid DNT below a floor slab during Bio Cell preparation at former Trivelene Sweating House.

July 22, 2008Former DuPont Barksdale Works13 Screening with Geophysics (EM61)

July 22, 2008Former DuPont Barksdale Works14 FIDO Analysis Equipment

July 22, 2008Former DuPont Barksdale Works15 Screening with Vacuum Cartridges MEVA SAMPLING PROCESS Clear brush and ground cover. Survey 1-acre grid corners and stake 1/16 th acre sub-squares. Vacuum the surface of each sub-square and record conditions during collection. Return the cartridge to the testing office, incubate the cartridge and analyze with the FIDO detector.

July 22, 2008Former DuPont Barksdale Works16 Sample MEVA results

July 22, 2008Former DuPont Barksdale Works17 TNT Located by MEVA TNT found by FIDO visible only after tall grass & sheet metal hiding it was removed.

Evaluation of Remedial Technologies

July 22, 2008Former DuPont Barksdale Works19 Barksdale Field DNT Bio-Pilot 2008

July 22, 2008Former DuPont Barksdale Works Bio-Pilot Work Overview Reduction of DNT via biodegradation observed by GA Tech in studies funded by DuPont. Small field-scale pilot conducted in 2007 at Barksdale results promising, pilot scaled up in Pilot locations chosen based on manufacturing history (predominately DNT). Work started in June 2008 at four locations.

July 22, 2008Former DuPont Barksdale Works Pilot Locations Lydol House (4 cells from 2007) Trivilene No. 1 Sweating House TNT No. 4 Bi/Tri House TNT No. 2 Wash House

July 22, 2008Former DuPont Barksdale Works22 map of 08 inv priorities. SITES

Sweating Ho Trivilene #1 Sweating House

July 22, 2008Former DuPont Barksdale Works24 #1 Trivilene Sweating House Cell

TNT #4 Bi-Tri House BiTri Ho

July 22, 2008Former DuPont Barksdale Works26 TNT #4 Bi-Tri House Cell

TNT #2 Wash House Wash Ho BiTri Ho Neut. Ho divert SW

July 22, 2008Former DuPont Barksdale Works28 Barksdale Bio-Pilot June 2008 TNT02 Wash House Cell Prior to first tilling

July 22, 2008Former DuPont Barksdale Works29 # 2 Wash House Cell

July 22, 2008Former DuPont Barksdale Works30 Typical debris removed by raking

July 22, 2008Former DuPont Barksdale Works31 Lydol House Cells

July 22, 2008Former DuPont Barksdale Works32 Tractor with Howard Rotovator 700 DUT

July 22, 2008Former DuPont Barksdale Works33 Tilling No. 2 Wash House

July 22, 2008Former DuPont Barksdale Works34 Pilot Status All locations tilled approximately once per month Periodic sampling for Nitramine and nitroaromatic organic compounds pH Nitrogen, Phosphorus, and Potassium Adjust pH in cells as necessary

July 22, 2008Former DuPont Barksdale Works35 Continue to investigate high priority areas on-site: Focus on high priority areas, including characterization and remediation. Barksdale Path Forward

July 22, 2008Former DuPont Barksdale Works36 Map of priority areas of investigation. Use map from April 2

July 22, 2008Former DuPont Barksdale Works37 Continue biodegradation studies. Continue to address DNX isomer and As/Pb issues. Continue public interaction and water supply commitments. Barksdale Path Forward

Chequamegon-Nicolet National Forest Update

July 22, 2008Former DuPont Barksdale Works39

July 22, 2008Former DuPont Barksdale Works40 Chequamegon-Nicolet National Forest Project Summary: DuPont working in conjunction with the US Forest Service (USFS) to investigate two sites (Cabin Lake and Clover) in the Chequamegon- Nicolet National Forest. Delineation of debris, via geophysical surveying, was the first investigation step: Delineation completed at Cabin Lake in late 2006, while debris delineation was completed at Clover in May Debris delineation report submitted to USFS on June 7, 2007.

July 22, 2008Former DuPont Barksdale Works41 Chequamegon-Nicolet National Forest Completed field portion of the Phase II Archaeological investigation in June 2008 Approximately 1,500 man hours of field work. Excavated 188 Shovel Test Pits (STPs) and 17 Test Units (TUs). Recovered artifacts that appear to be associated with past logging activities. Artifacts shipped to URS’ archaeology lab in Maryland for further study and curation preparation. Report preparation underway. Expected submittal to agency before the end of the calendar year. USFS and Wisconsin State Historical Preservation Office will determine if the site is eligible for National Historic Register of Places.

July 22, 2008Former DuPont Barksdale Works42 Chequamegon-Nicolet National Forest Path Forward: Once the archaeological work is reported and a determination as to what extent, if any, the logging site will need to be addressed as part of planned environmental work at Cabin Lake, DuPont will submit the final work plan for environmental investigation of the Clover and Cabin Lake sites to USFS for review. The environmental investigations at Clover and Cabin Lake are planned for 2009, pending USFS approval to proceed.

July 22, 2008Former DuPont Barksdale Works43 Questions or comments?