1 BROOKHAVEN SCIENCE ASSOCIATES Transition to Installation Erik Johnson ASD Deputy Director and Interface Manager NSLS-II CFAC Meeting November 9-10, 2009.

Slides:



Advertisements
Similar presentations
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Transition to Operations Erik D. Johnson, Deputy ALD for Programs Science Advisory Committee April 4, 2011.
Advertisements

1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Beneficial Occupancy Readiness Evaluation Plan Update Brian Heneveld, P.E., CIH NSLS-II BORE Coordinator Conventional.
1 BROOKHAVEN SCIENCE ASSOCIATES Environment, Safety and Health Steve Hoey, ESH Manager NSLS-II Project Advisory Committee Meeting March 29, 2012.
1 BROOKHAVEN SCIENCE ASSOCIATES Storage Ring - Conventional Facilities Interfaces Erik Johnson, Accelerator Systems Interface Manager Accelerator Systems.
1 BROOKHAVEN SCIENCE ASSOCIATES Electrical Power Status Thomas Nehring Conventional Facilities Advisory Committee Review October 5-6, 2010.
Rodd Pope, SLAC Undulator System April 16-17, 2007 FAC Meeting 1 Undulator System Assembly, Installation, and Integration.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Authorization Basis Steve Hoey, NSLS-II ESH Manager Project Advisory Committee February 8-9, 2011.
Richard M. Boyce FAC Review – Accelerator Installation October 29-31, Installation – Accelerator Systems Installation Planning.
Jo Beth Folger MMF Site and October 14, Conventional Facilities – MMF Presentation Outline Facility Design.
Richard M. Boyce FAC October 29-31, Installation Planning Integration process – IMT update Installation Planning &
D. Schultz FAC 6/17/08 1 e-Beams Systems Update People Progress the last review LTU and Dump Installation Status Undulator.
Bob Law FAC Oct 24, Sector 20 Project Overview Sector 20 Site Plan Description Organizational Chart Schedule Cost.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Accelerator Installation Plan Gregory Fries Project Engineer, Accelerator Systems Division CFAC Review of NSLS-II.
1 BROOKHAVEN SCIENCE ASSOCIATES Transition to Operations Erik D. Johnson, Deputy ALD for Programs NSLS-II Project Advisory Committee February 8-9, 2011.
Electrical & Control CM40 Daresbury Laboratory. CM40 Electrical Infrastructure Update RRM2 Latest Latest on Installation Progress Rack Allocations Racks.
1 BROOKHAVEN SCIENCE ASSOCIATES As-Built Drawings and Commissioning Status Steve Sawch Assistant Director for Construction Management NSLS-II Conventional.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Project Update Aesook Byon NSLS-II Deputy Project Director CFAC October 5, 2010.
1 BROOKHAVEN SCIENCE ASSOCIATES LOB - Ring Building Construction Coordination Michael P. Bromfield Construction Engineer NSLS-II Conventional Facilities.
1 BROOKHAVEN SCIENCE ASSOCIATES Authorization Basis Plan Steven Hoey, ESH Manager NSLS-II Project Advisory Committee Meeting December 10 – 11, 2009.
1 BROOKHAVEN SCIENCE ASSOCIATES Construction Management Status Steve Sawch Assistant Director for Construction Management NSLS-II Conventional Facilities.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS – II EFAC Review Conventional Facilities Briefing Marty Fallier Director for Conventional Facilities National Synchrotron.
1 BROOKHAVEN SCIENCE ASSOCIATES Conventional Facilities & Beam Stability Marty Fallier Director for Conventional Facilities NSLS-II Beam Stability Workshop.
Open Workbench By Wilmer Arellano Spring Statement Of Work (SOW) A statement of work (SOW) is a document used in the Project Development Life Cycle.
1 BROOKHAVEN SCIENCE ASSOCIATES Ring Building Construction Status Steve Sawch Assistant Director for Construction Management NSLS-II Conventional Facilities.
Machine Advisory Committee Review APS Upgrade Installation Plan and Schedule John Noonan November 15, 2006.
1 BROOKHAVEN SCIENCE ASSOCIATES Plans for LOBs and Site Master Plan Martin Fallier, Conventional Facilities Division Director CFAC Review March 10-11,
1 BROOKHAVEN SCIENCE ASSOCIATES CF Role in NSLS-II Operations Marty Fallier Conventional Facilities Advisory Committee Review October 5-6, 2009.
1 BROOKHAVEN SCIENCE ASSOCIATES Ring Building Construction Status Michael P. Bromfield Construction Engineer NSLS II Conventional Facilities Advisory Committee.
BROOKHAVEN SCIENCE ASSOCIATES National Synchrotron Light Source II Project Management Jim Yeck Deputy Director (Project Management)
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS – II ASAC Review Conventional Facilities Briefing Marty Fallier Director for Conventional Facilities National Synchrotron.
1 BROOKHAVEN SCIENCE ASSOCIATES CFAC Review Martin Fallier Director, Conventional Facilities Conventional Facilities Value and Risk Management May 8, 2008.
SLA – Oct. 07 BDS-KOM1 Installation Overview Acknowledgment: F. Peters, M. Munro, J. Kim G. Aarons, C. Corvin, P. Rodriguez Fred Asiri/SLAC.
BROOKHAVEN SCIENCE ASSOCIATES National Synchrotron Light Source II Project Management Jim Yeck NLSL II Deputy Director (Project Management)
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Project Baseline Jim Yeck NSLS-II Deputy Project Director NSLS-II PAC Meeting November 20, 2007.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Project Status Steve Dierker Associate Laboratory Director for Light Sources NSLS-II Project Director Accelerator.
1 BROOKHAVEN SCIENCE ASSOCIATES Abstract Magnet and Girder Integration Lewis Doom, NSLS-II Project National Synchrotron Light Source II (NSLS-II) will.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Status & Charge to ASAC Steve Dierker Associate Laboratory Director for Light Sources, NSLS-II Project Director.
1 BROOKHAVEN SCIENCE ASSOCIATES ASD Procurements Gregory Fries Liaison/Manufacturing Engineer NSLS-II ASAC October 22-23, 2009.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Update Steve Dierker Associate Laboratory Director for Light Sources NSLS-II Project Director Conventional Facilities.
1 BROOKHAVEN SCIENCE ASSOCIATES Installation & Integrated Testing Status & Plans Gregory Fries, ASD Project Engineer 9 th ASAC meeting for NSLS-II Project.
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
1 BROOKHAVEN SCIENCE ASSOCIATES Ring Building Overview Marty Fallier, Conventional Facilities Director ASAC Meeting July 18, 2008.
1 BROOKHAVEN SCIENCE ASSOCIATES Conventional Facilities Steve Dierker Director, NSLS-II Conventional Facilities Division NSLS-II User Workshop July 17,
1 NSTX Outage - Plan 1. 2 NSTX Outage – Diagnostic considerations 2 1.Erik Perry will be the manager of the construction activities in the Test Cell.
1 BROOKHAVEN SCIENCE ASSOCIATES ASAC Meeting NSLS-II Project July , 2008 G. Ganetis Power Supplies & Electrical Utilities ASAC Meeting National Synchrotron.
Paolo Guglielmini - TS / CV LHCb Install Meeting - 20/04/2005 LHCb Install Meeting 20/04/05 TS / CV / Detector Cooling Installations.
Transport of the CLIC Modules and Elements CLIC Workshop October 2007 Two Beam Hardware and Integration Working Group Keith Kershaw (CERN)
1 BROOKHAVEN SCIENCE ASSOCIATES EFAC Review Conventional Facilities Update Marty Fallier Director for Conventional Facilities May 10, 2007.
The Building 180 Cryogenic infrastructure water cooling system Status Update Stefano Moccia, EN-CV Coordination meeting 14/10/15.
Extraction Michael Bevins May 17, GeV Upgrade - Beam Transport Injection, Linac, Extraction, & Correctors Preliminary Design and Safety Review.
ILC Test Facility at New Muon Lab (NML) S. Nagaitsev Fermilab April 16, 2007.
NSTX Upgrade Test Cell Initial Schedule Vent vacuum vessel by 9/19 No vessel entry at this time Period of removals prior to start of outage: 9/19 – 10/14.
1 BROOKHAVEN SCIENCE ASSOCIATES CFAC Review Marty Fallier NSLS-II Conventional Facilities Schedule Review December 13, 2006.
1 BROOKHAVEN SCIENCE ASSOCIATES Accelerator Systems Installation F. Willeke, ASD Director 6 th ASAC October 22-23, 2009.
1 BROOKHAVEN SCIENCE ASSOCIATES CF Coordination with Technical Divisions Ove Dyling Conventional Facilities Advisory Committee Review October 5-6, 2010.
1 BROOKHAVEN SCIENCE ASSOCIATES Accelerator Installation Gregory Fries, Project Engineer 8 th ASAC meeting for NSLS-II Project May 10-11, 2011.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS – II CFAC Review Conventional Facilities Overview Scope & Schedule Marty Fallier Director for Conventional Facilities.
Each converter 3 racks (fighting for 2?) Access from front and rear of each rack! 56 racks total + 6 racks Ethernet/control Existing RF equipment to be.
September 30, 2008 Jim Van Dyke, Web:
1 BROOKHAVEN SCIENCE ASSOCIATES Getting the NSLS-II Accelerator ‘on-line’ Erik Johnson, Steve Hoey, Ferdinand Willeke NSLS-II PAC Meeting December 10-11,
Details on the Accelerator Installation Plan E. Sargsyan & L. Lari 20 April 2016.
Open Workbench By Wilmer Arellano Spring This is just an example, you can customize as you like.
Proton PMG September 3 rd 2015 Cons Gattuso AD Shutdown Manager.
RFQ Installation Plan PIP-II Meeting, 14-July-2015 C. Baffes for R. Andrews, A. Chen, Y. Czajkowski, S. Kazakov, R. Pasquinelli, D. Peterson, O. Pronitchev,
1 BROOKHAVEN SCIENCE ASSOCIATES Conventional Facilities Schedule Steve Sawch Asst. Director, Construction Management CF Advisory Committee Review of the.
Accelerator Installation Plan: Graphical representation E. Sargsyan & L. Lari DRAFT - March March 2016.
Installation Global System
Undulator System Installation
Extraction Michael Bevins May 17, 2007
Conventional Facilities
Presentation transcript:

1 BROOKHAVEN SCIENCE ASSOCIATES Transition to Installation Erik Johnson ASD Deputy Director and Interface Manager NSLS-II CFAC Meeting November 9-10, 2009

2 BROOKHAVEN SCIENCE ASSOCIATES How to get there from here Issues to address in orchestrating the transition Beneficial occupancy conditions for installation Systematic handoff of completed storage ring building spaces for technical installation Access to completed spaced for installation while construction continues Interaction of installation activity with LOB construction

3 BROOKHAVEN SCIENCE ASSOCIATES Installation and Operation Zones RF L 1 Key Points: Utilities and infrastructure are segmented as shown BOD handovers aligned with support infrastructure Installation and testing within these segments Linac/Booster test/commission may overlap with construction activities B

4 BROOKHAVEN SCIENCE ASSOCIATES Phasing of Construction and Installation Beneficial Occupancy Installation

5 BROOKHAVEN SCIENCE ASSOCIATES ASD Technical installation (preliminary) n.b. Technical installation is gross equipment location and component testing Subsystem testing, Integrated testing and commissioning follow

6 BROOKHAVEN SCIENCE ASSOCIATES Red lines indicate boundaries of Pentant 1 Block arrow shows likely experimental floor loading location - back trucks into building to unload - laydown area, some storage/stock area The first slice; Pentant 1 plus…

7 BROOKHAVEN SCIENCE ASSOCIATES Crosswalk Building to Machine

8 BROOKHAVEN SCIENCE ASSOCIATES Pentant 1 installation Zones Exp’l floor Tunnel Service Building Mezzanine Four zones to consider Note also colors….. Note the numbers – Dark boxes are in tunnel components Light are ‘on the floor’

9 BROOKHAVEN SCIENCE ASSOCIATES Map out schedule by area Note color of bars Dates from the project schedule but organized by the space they utilize

10 BROOKHAVEN SCIENCE ASSOCIATES Viewed as a Gantt chart schedule 1 of 2 About 20 week duration for installation Note color of bars

11 BROOKHAVEN SCIENCE ASSOCIATES Even Cell Components G3 G5G6G2G4 G1 Black border indicates an even cell ID Section

12 BROOKHAVEN SCIENCE ASSOCIATES Odd Cell Components G1 G3 G5G6G2G4 ID Section Water manifolds are shown schematically as a double red line (Aluminum) a double green line (Copper) Red border indicates an odd cell

13 BROOKHAVEN SCIENCE ASSOCIATES Typical cell rack groups Blue 234 Blue border indicates a rack group 2, 3, or 4 racks wide Cable tray is shown schematically as a double dashed line G3 G5G6G2G4

14 BROOKHAVEN SCIENCE ASSOCIATES Storage ring Pentant 1 installation: Week Exp’l floor Tunnel Service Building Mezzanine 23 Status: ~ 1/3 of material in building Installation starting 26 2 Activities: Prepare tunnel Stage components on floor Start cable tray on mezzanine

15 BROOKHAVEN SCIENCE ASSOCIATES Storage ring Pentant 1 installation: Week Exp’l floor Tunnel Service Building Mezzanine 23 Status: Most material in building Installation on mezzanine Begin in tunnel 26 4 Activities: Stage components on floor Start racks on mezzanine

16 BROOKHAVEN SCIENCE ASSOCIATES Storage ring Pentant 1 installation: Week Exp’l floor Tunnel Service Building Mezzanine 23 Status: Most material in building Installation on mezzanine Installation in tunnel 26 6 Activities: Tray and manifolds in place in tunnel Racks well underway Stage cable and start pulling

17 BROOKHAVEN SCIENCE ASSOCIATES Storage ring Pentant 1 installation: Week Exp’l floor Tunnel Service Building Mezzanine 23 Status: Multipole girder installation 26 8 Activities: Begin Girder installation Start populating racks Begin Utility installation in SB

18 BROOKHAVEN SCIENCE ASSOCIATES Storage ring Pentant 1 installation: Week Exp’l floor Tunnel Service Building Mezzanine 23 Status: Half way in schedule Activities: Girder installation Populating racks Utility installation in SB

19 BROOKHAVEN SCIENCE ASSOCIATES Storage ring Pentant 1 installation: Week Exp’l floor Tunnel Service Building Mezzanine 23 Status: Most wiring pulled Process utilities connected Activities: Girder installation Populating racks Terminating cables

20 BROOKHAVEN SCIENCE ASSOCIATES Storage ring Pentant 1 installation: Week Exp’l floor Tunnel Service Building Mezzanine 23 Status: About ¾ through schedule Activities: Girder installation Racks populated Terminating cables

21 BROOKHAVEN SCIENCE ASSOCIATES Storage ring Pentant 1 installation: Week Exp’l floor Tunnel Service Building Mezzanine 23 Status: About ½ vacuum complete Activities: Girder installation Cable pulls all done Testing underway

22 BROOKHAVEN SCIENCE ASSOCIATES Storage ring Pentant 1 installation: Week Exp’l floor Tunnel Service Building Mezzanine 23 Status: About 2/3 vacuum complete Activities: Girder installation Cable pulls all done Testing underway

23 BROOKHAVEN SCIENCE ASSOCIATES Storage ring Pentant 1 installation: Week Exp’l floor Tunnel Service Building Mezzanine 23 Status: All equipment in place System testing underway Activities: Final utility connections Equipment shakeout

24 BROOKHAVEN SCIENCE ASSOCIATES Requirements and Interfaces From Conventional Facilities Beneficial occupancy of pentant 1 including utilities Access on ring side through an area still held by contractor for material handling Access through vehicle tunnel for material handling to service building 1 Staging area outside of building (LOB 5 area) From ASD (NSLS-II) Coordination with contractor to allow construction to continue

25 BROOKHAVEN SCIENCE ASSOCIATES LOBs and installation coordination Key Issues: LOB construction not yet settled LOB 1, 2, and 3 in budget LOB 4 and 5 hoped for scope addittion if all goes well LOB will follow building phasing (roughly) May need to free LOB5 LOW before installation completed

26 BROOKHAVEN SCIENCE ASSOCIATES Access coordination Possible external access points Construction entrance in P5 LOB 2 Staging Loading dock

27 BROOKHAVEN SCIENCE ASSOCIATES Possible complications and wrinkles Epoxy painted experimental floor – need to protect? Construction of LOBs – could impact on availability or access depending on build-out and schedule Greater level of detail needed in some installation components XFD installation needs to be factored into schedule

28 BROOKHAVEN SCIENCE ASSOCIATES Summary Planning for transition well under way BORE process under development (ESH/CFD) Basic installation plan established for ASD XFD installation plan under development Coordination with contractor(s) going forward Need access to make use of turned over buildings May need laydown area outside of building Need to stay out of contractors way! Discussions already under way with Torcon