2010 Honda Civic 4-door. HMIN Weld Department The White Body is Welded in the Spot Robot Station and then sent to C-Line.

Slides:



Advertisements
Similar presentations
European ATFM From current operation towards the future Patrick Ky
Advertisements

Enter. The Scene Type text here Choice A1 Text for decisions Guidelines Guideline text Click on A, B or C A B C Choice B1 Choice C1 Click on A, B or C.
The following photo essay shows a 2011 Hyundai Equus Sedan being transformed from a running passenger car into a specialized platform used for photographing.
Bus 480 – Lecture 2 Transportation and Assignment models
Advanced Steel Manufacturing and Stamping
An Overview of the Production Process. -Stable Workforce -Controlled Environment -Less Waste -Repetitive Tasks -Lean Manufacturing Principles -Just-in-time.
No. 5 Entry THE ACCIDENT SCENE First right panel off the No. 2 conveyor belt The victim was moving the continuous miner cable into the crosscut by hand.
Process Analysis If you cannot describe what you are doing as a process, you do not know what you are doing. W.E. Deming.
Export Flow Chart Ready From Carriage Airport to Airport Airport to Consignee Door Tracing & Tracking After Delivery Service.
HOW TO MAKE CAR GERMAN STYLE. VOLKS WAGON’S TRANSPARANT FACTORY.
THE PROJECT BRIEF… BUILD A CONTEMPORARY HOME ON A SMALL INNER CITY BLOCK WITH NO ROOM FOR ONSITE STORAGE OR SCAFFOLD.
Bell Ringer #3 1.List 3 places you should NOT park. 2.Oops…You just parked in one of those places that you’re NOT supposed to park…describe in detail what.
LOCAL ASSISTANCE 5 – YEAR PLAN Facilities Department Mark Thissell.
Decorative Tooling for the Finishing Industry
KTH Parts Industries, Inc.. ◆ Established on May 16, 1984 ◆ Production Started on Sep. 10, 1985 ◆ Initial Shareholders K Kikuchi Press Kogyo T Takao Kinzoku.
Excel Environ Racks Simon Robinson. Ranges Sizes Features Environ v. formal surround; enclose.
LAYCO EQUIPMENT BY YARGUS MANUFACTURING
Guru Ram Dass Body Builders. Works: 60/7,8, Naresh Park Extn, Najafgarh Road, Nangloi, Delhi-41. Guru Ram Dass Body Builder, Delhi.
PRODUCTION FACILITY HIGHLIGHTS. FAST FACTS: 550,000 Square Feet $40 Million Investment ISO9001 Certification.
Corvette Assembly Process Body Shop and Paint Shop NCRS National Convention July 20, 2011 John Hinckley.
Corvette Assembly Process Trim-Frame-Engine Dress NCRS National Convention July 20, 2011 John Hinckley.
POLAIR One of the biggest manufacturers of professional cold equipment pcs./year pcs./year 2.5 millions.m 2 Cold rooms Refrigerated.
Template: 3BGB D0001 Rev - Body-in-White Assembly systems and products Simultaneous Engineering Simulation Process and Design Installation and Commissioning.
1 Site Selection & Area Allocation. 2 Maximizing Existing Facilities Consider the Following Areas for Cube Utilization: Under the floor. Basements are.
OM&PM/Class 3b1 1Operations Strategy 2Process Analysis –Class 2a+2b: Process Flow Analysis –Class 3a: Applications in Manufacturing 3Lean Operations –Class.
AUTOMOTIVE ASSEMBLY PROCESSES John L. Evans, Ph.D.
Department of Industrial and Engineering Technology College of Science and Technology Morehead State University IET 317 Group 5 Project Group Members:
1 Case Study based on a trip on Nov 19, 02 NUMMI.
Appendices Subpart R Steel Erection
COMPANY PROFILE.
Shelton School District Precise Vehicle Placement
ELF Aerodynamic Analysis
Collaboration among sales, production, planning, purchasing, maintenance and management to positively impact the bottom line.
Work Cell Design and Control
JINAN BULLEX VEHICLE CO., LTD. ( The truck body) The FRP Sandwich PU Panel now is the best Refrigerated Truck Body Materials and the materials is become.
Notes from: ______________ ______________ Bell Work: Complete handout Check in homework A#5.33 pg #7, 10, 16, 18, 20, 22 Notes – Section 5.4 –
Utdallas.edu/~metin 1 based on a trip on Nov 19, 02 NUMMI.
Corvette Assembly Process Chassis And Final Assembly NCRS National Convention July 20, 2011 John Hinckley.
Manufacturing Systems
Automobile Manufacturing Plant. ASSEMBLY PROCESS  The Parts  Start With the Frame  Installing the Parts  Engine and Transmission Installed  Building.
The Kick out Delivery Chute is a reload station for line operators to manually reload a block. After manually loading the block onto our Kick out chute,
Vicinity Map Gillis W Long Center, Carville, LA Bldg 15 Stairwell Painting (1 st and 2 nd Floor) September 30, 2015.
Mr. Roboto Keith Wood. Robitz!!!! Robot- a machine that can move and interact with various objects, has some processing ability and be able to be programmed.
Project cash flow n A B Example 1: Consider the following two mutually exclusive investment projects. Assume.
EXAMPLE : A welding robot in an automobile plant looks for a small magnetic dot to perform a spot weld. The robot has an 85% success rate for.
And Their Impact on the Assembly Line John D. Hall.
2005 North Carolina Department of Commerce Division of Community Assistance With funding from the Appalachian Regional Commission Virginia A. Faust, AICP.
Porsche. View over Porsche Platz to Plant II and the Porsche Centre in Stuttgart-Zuffenhausen.
Front Structure Load and Weld Station
The manufacturing of the motorcycle By Donald Goldman.
At The Fab Lab Three Lakes. MDC 30’ Overton Car Interiors for 3D Printing.
The Process of Making The Best CO2 Machine! Agricultural Mechanics / Woodshop Mr. Weaver The Process of Making The Best.
By:- Rajat Pundir R STUDY OF PROCESS &MAKING OF PROCESS SHEETS PLANT ENGINEERING DEPARTMENT This is the department on which I have worked on.
26’ Mobile Kitchen. 26’ Catering Kitchen Trailer In stock and ready for delivery. Trailer details/features General Features: Aluminum diamond plate.
PRECISION ARC ROBOTIC SYSTEMS
Site Selection & Area Allocation
Adjusting My Trade To Suit A New Animal
End of Line “Pass Through” Conveyor
INDENTIFYING BODY PANEL/KOMPONEN TO BE REPAIRED
BODY ASSEMBLY PROCESS LASER WELDING VS SPOT WELDING Title Only Slide.
AS/RS (Automated Storage/Retrieval System)
Cell #2 (2) Crankcases w/Liners.
molding eng. ass. welding stamping welding start end FA stamping
Facilities and Layout Planning
FRONT FRAME SUB T903 FIG 701A P1 212.
ASSEMBLY PROCESS FOR BODY STRUCTURES
Process Analysis “If you cannot describe what you are doing as a process, you do not know what you are doing.” W.E. Deming.
SPRAY PAINTING ROBOT Every metallic materials will be painted at the final stage of production in order to protect it from corrosion. In an automobile.
MAE 435 Progress Report II 4/2/13.
5’ Medium Horizontal Langstroth
Presentation transcript:

2010 Honda Civic 4-door

HMIN Weld Department

The White Body is Welded in the Spot Robot Station and then sent to C-Line.

Process Flow C2 B1-Zone B2-Zone Stamping Part Delivery To Pain t Dep t Overhead White Body Conveyor C3 C1 D-Zone Hood/TG Rear Door Frt Door C-Zone Material Delivery N S W E A-Zone Fr Co mp Rr Flr Fl Comp SR Station Roof GW Side Panel Rr Inner Fr Floor

What do we make? Final White Body Assembly Cycletime? # seconds Whos our Customer? Paint Department C-Zone : 26 White Body Capacity. A White Body (unpainted Steel Car body) exits the end of C-Line Conveyor every # seconds The entire C-Line Conveyor moves per set cycle-time. From: SR Station White Body Leave C-Line to Upstairs conveyor, then on to Paint Department.