January 13, 2004D. Rubin - Cornell1 CESR-c BESIII/CLEO-c Workshop, IHEP January 13, 2004 D.Rubin for the CESR operations group.

Slides:



Advertisements
Similar presentations
ILC Accelerator School Kyungpook National University
Advertisements

Linear Collider Damping Rings Andy Wolski Lawrence Berkeley National Laboratory USPAS Santa Barbara, June 2003.
1 ILC Bunch compressor Damping ring ILC Summer School August Eun-San Kim KNU.
Study of the Luminosity of LHeC, a Lepton Proton Collider in the LHC Tunnel CERN June F. Willeke, DESY.
CESR as Light Source David L. Rubin for the CESR Operations Group Cornell University Laboratory for Elementary-Particle Physics.
KEKB Design 1.Parameters 2.Collider Ring 3.Interact Region 4. Magnet, RF, Instabilities 5.Recent progress with crab crossing.
CESR-c Status CESR Layout - Pretzel, Wigglers, solenoid compensation Performance to date Design parameters Our understanding of shortfall Plans for remediation.
October 28, 2002D. Rubin - Cornell1 CESR-c and CLEO-c Physics Extending the energy reach of CESR D.Rubin, Cornell University CLEO-c physics program Accelerator.
Operational Status of CESR-c James A. Crittenden Accelerator Physics Seminar Wilson Lab 28 July 2006.
Wilson Lab Tour Guide Orientation 11 December 2006 CLASSE 1 Focusing and Bending Wilson Lab Tour Guide Orientation M. Forster Mike Forster 11 December.
Overview of ILC Plans D.Rubin April 17, D. Rubin2 ILC R&D Activities and Plans 1.Positron Source 2.Damping Ring 3.Low Emittance Transport - damping.
July 22, 2005CESRc miniMAC1 Introduction to CESRc Optics M. Billing.
Beam-beam studies for Super KEKB K. Ohmi & M Tawada (KEK) Super B factories workshop in Hawaii Apr
CESR Beam-Beam Effects at CESR Mark A. Palmer Cornell University July 14, 2001.
Experimental Plan for Achieving Low Emittance in CesrTA David Rubin Cornell Laboratory for Accelerator-Based Sciences and Education.
January 15, 2005D. Rubin - Cornell1 CESR-c Status -Operations/Luminosity December/January vs September/October -Machine studies and instrumentation -Simulation.
July 22, 2005Modeling1 Modeling CESR-c D. Rubin. July 22, 2005Modeling2 Simulation Comparison of simulation results with measurements Simulated Dependence.
ALPHA Storage Ring Indiana University Xiaoying Pang.
Topic Three: Perturbations & Nonlinear Dynamics UW Spring 2008 Accelerator Physics J. J. Bisognano 1 Accelerator Physics Topic III Perturbations and Nonlinear.
Ultra-Low Emittance Storage Ring David L. Rubin December 22, 2011.
Simulation of direct space charge in Booster by using MAD program Y.Alexahin, N.Kazarinov.
ALCW at SLAC, January 7, 2004J. Rogers, A Damping Ring Primer1 A Damping Ring Primer J. Rogers Cornell University Linear collider emittance requirements.
Emittance Growth from Elliptical Beams and Offset Collision at LHC and LRBB at RHIC Ji Qiang US LARP Workshop, Berkeley, April 26-28, 2006.
Beam-Beam Simulations for RHIC and LHC J. Qiang, LBNL Mini-Workshop on Beam-Beam Compensation July 2-4, 2007, SLAC, Menlo Park, California.
6. betatron coupling sources: skew quadrupoles, solenoid fields concerns: reduction in dynamic (& effective physical) aperture; increase of intrinsic &
Beam dynamics on damping rings and beam-beam interaction Dec 포항 가속기 연구소 김 은 산.
October 4-5, Electron Lens Beam Physics Overview Yun Luo for RHIC e-lens team October 4-5, 2010 Electron Lens.
Simulation of direct space charge in Booster by using MAD program Y.Alexahin, A.Drozhdin, N.Kazarinov.
CASA Collider Design Review Retreat HERA The Only Lepton-Hadron Collider Ever Been Built Worldwide Yuhong Zhang February 24, 2010.
Operational Status of CESR-c James A. Crittenden Laboratory for Elementary-Particle Physics Cornell University 27 June 2006.
November 14, 2004First ILC Workshop1 CESR-c Wiggler Dynamics D.Rubin -Objectives -Specifications -Modeling and simulation -Machine measurements/ analysis.
1 Proposal for a CESR Damping Ring Test Facility M. Palmer & D.Rubin November 8, 2005.
Lecture 5 Damping Ring Basics Susanna Guiducci (INFN-LNF) May 21, 2006 ILC Accelerator school.
Nonlinear Dynamic Study of FCC-ee Pavel Piminov, Budker Institute of Nuclear Physics, Novosibirsk, Russia.
E-cloud studies at LNF T. Demma INFN-LNF. Plan of talk Introduction New feedback system to suppress horizontal coupled-bunch instability. Preliminary.
Motivation and Overview David Rubin Cornell Laboratory for Accelerator-Based Sciences and Education.
ILC luminosity optimization in the presence of the detector solenoid and anti-DID Reine Versteegen PhD Student CEA Saclay, Irfu/SACM International Workshop.
By Verena Kain CERN BE-OP. In the next three lectures we will have a look at the different components of a synchrotron. Today: Controlling particle trajectories.
February 5, 2005D. Rubin - Cornell1 CESR-c Status -Operations/Luminosity -Machine studies -Simulation and modeling -4.1GeV.
CESR Test Accelerator Optics Correction and Tuning Tools David Sagan Cornell University.
2 February 8th - 10th, 2016 TWIICE 2 Workshop Instability studies in the CLIC Damping Rings including radiation damping A.Passarelli, H.Bartosik, O.Boine-Fankenheim,
Present MEIC IR Design Status Vasiliy Morozov, Yaroslav Derbenev MEIC Detector and IR Design Mini-Workshop, October 31, 2011.
CESR as Light Source David Rubin for the CESR Operations Group Cornell University Laboratory for Elementary-Particle Physics.
Optics with Large Momentum Acceptance for Higgs Factory Yunhai Cai SLAC National Accelerator Laboratory Future Circular Collider Kick-off Meeting, February.
BINP tau charm plans and other projects in Turkey/China A. Bogomyagkov BINP SB RAS, Novosibirsk.
Operated by JSA for the U.S. Department of Energy Thomas Jefferson National Accelerator Facility Alex Bogacz IDS- NF Acceleration Meeting, Jefferson Lab,
CESR-c Plans for CESR (or Life Without CLEO) Mark A. Palmer David L. Rubin Second ILC Accelerator Workshop August 18, 2005.
Effect of high synchrotron tune on Beam- Beam interaction: simulation and experiment A.Temnykh for CESR operating group Cornell University, Ithaca, NY.
MDI and head-on collision option for electron-positron Higgs factories
Benchmarking MAD, SAD and PLACET Characterization and performance of the CLIC Beam Delivery System with MAD, SAD and PLACET T. Asaka† and J. Resta López‡
Beam-beam effects in eRHIC and MeRHIC
Large Booster and Collider Ring
Coupling Correction at the Australian Synchrotron
First Look at Nonlinear Dynamics in the Electron Collider Ring
Pretzel scheme of CEPC H. Geng, G. Xu, Y. Zhang, Q. Qin, J. Gao, W. Chou, Y. Guo, N. Wang, Y. Peng, X. Cui, T. Yue, Z. Duan, Y. Wang, D. Wang, S. Bai,
Jeffrey Eldred, Sasha Valishev
Laboratoire de L’Accélérateur Linéaire
CASA Collider Design Review Retreat Other Electron-Ion Colliders: eRHIC, ENC & LHeC Yuhong Zhang February 24, 2010.
The design of interaction region
XII SuperB Project Workshop LAPP, Annecy, France, March 16-19, 2010
LHC (SSC) Byung Yunn CASA.
M. Tigner, R. Helms, M. Palmer, D. Rubin, D. Sagan Cornell University
The Proposed Conversion of CESR to an ILC Damping Ring Test Facility
Low Emittance Tuning David Rubin Cornell Laboratory for
Beam-Beam Effects in the CEPC
Electron Rings Eduard Pozdeyev.
ICFA Mini-Workshop, IHEP, 2017
Proposal for a CESR Damping Ring Test Facility
Fanglei Lin, Yuhong Zhang JLEIC R&D Meeting, March 10, 2016
Fanglei Lin JLEIC R&D Meeting, August 4, 2016
Presentation transcript:

January 13, 2004D. Rubin - Cornell1 CESR-c BESIII/CLEO-c Workshop, IHEP January 13, 2004 D.Rubin for the CESR operations group

January 13, 2004D. Rubin - Cornell2 CESR-c Energy reach 1.5-6GeV/beam Electrostatically separated electron-positron orbits accomodate counterrotating trains Electrons and positrons collide with ±~3.5 mrad horizontal crossing angle 9 5-bunch trains in each beam (768m circumference)

January 13, 2004D. Rubin - Cornell3 CESR-c IR Summer 2000, replace 1.5m REC permanent magnet final focus quadrupole with hybrid of pm and superconducting quads Intended for 5.3GeV operation but perfect for 1.5GeV as well

January 13, 2004D. Rubin - Cornell4 CESR-c IR  * ~ 10mm H and V superconducting quads share same cryostat 20cm pm vertically focusing nose piece Quads are rotated inside cryostat to compensate effect of CLEO solenoid Superimposed skew quads permit fine tuning of compensation At 1.9GeV, very low peak  => Little chromaticity, big aperture

January 13, 2004D. Rubin - Cornell5 CLEO solenoid 1T(  )-1.5T(  ) Good luminosity requires zero transverse coupling at IP (flat beams) Solenoid readily compensated even at lowest energy  *(V)=10mm E=1.89GeV  *(H)=1m B(CLEO)=1T

January 13, 2004D. Rubin - Cornell6 CESR-c Energy dependence Beam-beam effect In collision, beam-beam tune shift parameter ~ I b /E Long range beam-beam interaction at 89 parasitic crossings ~ I b /E ( for fixed emittance ) (and this is the current limit at 5.3GeV) Single beam collective effects, instabilities Impedance is independent of energy Effect of impedance ~I/E

January 13, 2004D. Rubin - Cornell7 CESR-c Energy dependence (scaling from 5.3GeV/beam to 1.9GeV/beam) Radiation damping and emittance Damping Circulating particles have some momentum transverse to design orbit (P t /P) In bending magnets, synchrotron photons radiated parallel to particle momentum  P t /P t =  P/P RF accelerating cavities restore energy only along design orbit, P-> P+  P so that transverse momentum is radiated away and motion is damped Damping time  ~ time to radiate away all momentum

January 13, 2004D. Rubin - Cornell8 CESR-c Energy dependence Radiation damping In CESR at 5.3 GeV, an electron radiates ~1MeV/turn ~>  ~ 5300 turns (or about 25ms) SR Power ~ E 2 B 2 = E 4 /  2 at fixed bending radius 1/  ~ P/E ~ E 3 so at 1.9GeV,  ~ 500ms Longer damping time Reduced beam-beam limit Less tolerance to long range beam-beam effects Multibunch effects, etc. Lower injection rate

January 13, 2004D. Rubin - Cornell9 CESR-c Energy dependence Emittance L ~ I B 2 /  x  y = I B 2 / (  x  y  x  y ) 1/2  x ~  y (coupling) I B /  x limiting charge density Then I B and therefore L ~  x CESR (5.3GeV),  x = 200 nm-rad CESR (1.9GeV),  x = 30 nm-rad

January 13, 2004D. Rubin - Cornell10 CESR-c Energy dependence Damping and emittance control with wigglers

January 13, 2004D. Rubin - Cornell11 CESR-c Energy dependence In a wiggler dominated ring 1/  ~ B w 2 L w  ~ B w L w  E /E ~ (B w ) 1/2 nearly independent of length (B w limited by tolerable energy spread) Then 18m of 2.1T wiggler ->  ~ 50ms -> 100nm-rad <  <300nm-rad

January 13, 2004D. Rubin - Cornell12 Optics effects - Ideal Wiggler B z = -B 0 sinh k w y sin k w z Vertical kick ~  B z

January 13, 2004D. Rubin - Cornell13 Optics effects - Ideal Wiggler Vertical focusing effect is big,  Q ~ 0.1/wiggler But is readily compensated by adjustment of nearby quadrupoles Cubic nonlinearity ~ (1/ ) 2 We choose the relatively long period -> = 40cm Finite width of poles leads to horizontal nonlinearity

January 13, 2004D. Rubin - Cornell14 7-pole, 1.3m 40cm period, 161A, B=2.1T Superconducting wiggler prototype installed fall 2002

January 13, 2004D. Rubin - Cornell15 Wiggler Beam Measurements -Measurement of betatron tune vs displacement consistent with modeled field profile and transfer functon

January 13, 2004D. Rubin - Cornell16

January 13, 2004D. Rubin - Cornell17

January 13, 2004D. Rubin - Cornell18

January 13, 2004D. Rubin - Cornell19

January 13, 2004D. Rubin - Cornell20 6 wigglers installed spring 2003

January 13, 2004D. Rubin - Cornell21 6 Wiggler Linear Optics Lattice parameters Beam energy[GeV]1.89  * v [mm]  * h [m] Crossing angle[mrad] Q v Q h Number of trains Bunches/train Bunch spacing[ns] Accelerating Voltage[MV] Bunch length[mm] Wiggler Peak Field[T] Wiggler length[m] Number of wigglers  x [mm-mrad]  E /E[%]

January 13, 2004D. Rubin - Cornell22 Machine Status Commissioning with 6 wigglers beginning in August Measure and correct linear optics -Characterize - wiggler nonlinearity -Injection -Single beam stability -Measure and correct “pretzel” dependent /sextupole differential optics

January 13, 2004D. Rubin - Cornell23 Wiggler Beam Measurements Beam energy = 1.89GeV -Optical parameters in IR match CESR-c design -Measure and correct betatron phase and transverse coupling - Measurement of lattice parameters (including emittance) in good agreement with design

January 13, 2004D. Rubin - Cornell24 Wiggler Beam Measurements -Injection 1 sc wiggler (and 2 pm CHESS wigglers) -> 8mA/min 6 sc wiggler -> 50mA/min 1/  = 4.5 s -1 1/  = 10.9s -1

January 13, 2004D. Rubin - Cornell25 Wiggler Beam Measurements 6 wiggler lattice -Injection 30 Hz 68mA/80sec60 Hz 67ma/50sec

January 13, 2004D. Rubin - Cornell26 Wiggler Beam Measurements -Single beam stability 1/  = 4.5 s -1 1/  = 10.9s -1 2pm + 1 sc wigglers 6 sc wigglers

January 13, 2004D. Rubin - Cornell27 Measurement and correction of linear lattice Measured - modeled Betatron phase and transverse coupling

January 13, 2004D. Rubin - Cornell28 Sextupole optics Modeled pretzel dependence of betatron phase due to sextupole feeddown Difference between measured and modelled phase with pretzel after correction of sextupoles

January 13, 2004D. Rubin - Cornell29 Beam profiles due to horizontal excitation Best luminosity Solenoid compensation Coupling parameters in the interaction region

January 13, 2004D. Rubin - Cornell30 CESR-c Peak Luminosity

January 13, 2004D. Rubin - Cornell31 CESR-c integrated luminosity

January 13, 2004D. Rubin - Cornell32 1-jan-2004

January 13, 2004D. Rubin - Cornell33 2.5pb -1 /day 28-Dec-2003

January 13, 2004D. Rubin - Cornell34 CESR-c parameters ParameterMeasured (Design) Beam energy[GeV]1.88 (1.88) Luminosity[10 30 /cm 2 /s ] 45 (300) I b [ma/bunch]1.7 (4) I beam [ma/beam]55 (180) vv (0.04) hh Wigglers6 (12)  E /E[10 -4 ] 0.8 (0.81)  [ms] 110 (55) B w [T]2.1(2.1)  * v [mm] 13 (10)  h [nm]160 (220)

January 13, 2004D. Rubin - Cornell35 CESR-c Status Remaining 6 (of 12) wigglers will be installed is spring 2004 Double damping decrement -> Faster injection -> Higher single beam current -> Reduced sensitivitiy to current limiting parasitic crossings -> Higher beambeam current limit -> Increased tune shift parameter Machine studies/beam instrumentation in progress -> Improved correction of linear and nonlinear optical errors -> More precise and reliable correction of coupling errors -> Improved tuning “knobs” and algorithms

January 13, 2004D. Rubin - Cornell36 CESR-c design parameters

January 13, 2004D. Rubin - Cornell37 Machine modeling -Wiggler transfer map -Compute field table with finite element code -Tracking through field table -> transfer maps

January 13, 2004D. Rubin - Cornell38 Machine modeling - Fit analytic form to field table

January 13, 2004D. Rubin - Cornell39 Machine modeling -Wiggler map Fit parameters of series to field table Analytic form of Hamiltonian -> symplectic integration -> taylor map

January 13, 2004D. Rubin - Cornell40 Simulation -Machine model includes: -Wiggler nonlinearities -Beam beam interactions (parasitic and at IP) -Synchrotron motion -Radiation excitation and damping -Weak beam -200 particles - initial distribution is gaussian in x,y,z - track ~ turns