Progress Report of Planning Interconnection Sub Working Group Presented to The 8 th Meeting of HAPUA Working Group No.2 - Transmission Kuala Lumpur, Malaysia.

Slides:



Advertisements
Similar presentations
ICP 7-th Regional Coordinators Meeting World Bank, Washington D.C.
Advertisements

Calista AVCP Regional Energy Plan. Preliminary Planning and Stakeholder Involvement Resource Inventory and Data Analysis Develop and Review Draft Energy.
ASEAN TOURISM DEVELOPMENT 2011
The Internal Meeting of HAPUA Working Group No.2-Transmission The Progress on AIMS-II Jakarta, Indonesia 25 February 2009.
Economic Criteria for Transmission Planning in the ERCOT Region Public Utility Law Seminar DeAnn Walker August 3, 2012.
Development of ISSAI 5300 on IT AUDIT
DEVELOPMENT OF A REGIONAL ENERGY MARKET IN THE MEKONG AREA by Piyasvasti Amranand National Energy Policy Office, Thailand ENERGY WEEK April 1999,
1 PROPOSAL FOR PROCEDURES AND SCOPE OF SHA DATA COLLECTION UNDER THE CO-OPERATION BETWEEN OECD, EUROSTAT AND WHO 7 th Meeting of Health Accounts Experts.
The Internal Meeting of HAPUA Working Group No. 2 Dr. Suthep Chimklai (Project Coordinator) Jakarta, Indonesia 25 February 2009.
3 Dec 2003Market Operations Standing Committee1 Market Rule and Change Management Consultation Process John MacKenzie / Darren Finkbeiner / Ella Kokotsis,
Joint Meeting APGCC Chairman & WG 2, 5 and 6
Generation & Trading CIST REGIONAL ENERGY MARKET IN SOUTH EAST EUROPE (REM) 3rd South East Europe Energy Week – 1 to 4 th June 2004.
HAPUA WORKING GROUP NO. 1: GENERATION (HWG1) 10 th Meeting on 26 th Feb 2009, Jakarta, Indonesia PROGRESS REPORT AND ACTION PLAN FOR 2009 BY MR. AHMAD.
Preparation of update data set and information for Agriculture Sector Moe Moe Than Myanmar.
3rd WG meeting, Brussels Proposed Plan for Governance of the Washington Group Prepared by: Jennifer Madans, Barbara Altman, Beth Rasch (USA); Renée Langlois.
1 Bilateral Interconnection Agreement Model Presented to HAPUA Working Group 5 (ESI Services), Project 6 By Power Purchase Agreement Division Electricity.
SPS policy – Information Presentation Presentation to ROS June 16, 2004.
PROJECT COORDINATOR REPORT
FERC Order No. 698 Procedures for Providing Hourly Consumption Data Spectra Energy Pipelines June 20, 2008.
Agenda 6.7- Exchanging Information and Creating Awareness in a Structured Basis between Peak Bodies 12 th Meeting AWGWRM Vietnam, 25 – 26 July 2012 Exec.
WG2 – Transmission: SWG (O&M) Progress Report to HAPUA Working Group No. 2 – Transmission Oct 2010.
STATUS REPORT SWG SO by PLN HAPUA MEETING WORKING GROUP 2 – TRANSMISSION SUB WORKING GROUP– SYSTEM OPERATION 6th Oct 2010, Kuala Lumpur - Malaysia.
HAPUA WG No.5 (ESI Services) Updates The WG2, 5, 6 and Chairman of APGCC Meeting Jakarta, Indonesia ● 26 February 2009 By WG 5 Project Coordinator: MR.
Chung Hwa Middle School
Standards Review Subcommittee Update August 17, 2010.
4-1. Introduction 1/10 APERC Workshop at EWG47, Kunming, China 19 May Oil and Gas Emergency Exercises 4-1. Introduction Kazutomo IRIE General Manager,
Working Group 8 – E9-1-1 Best Practices September 23, 2011 Robin Howard Chair WG 8 – E911 Best Practices.
Eurostat Assessment of the reliability of 2011 First Estimates Agricultural Accounts and Prices Working Party 3 DECEMBER 2012 Room Document.
Progress on the Activities Outlined in the Recommendations of SWG-1 2nd Meeting of the Statistical Working Group June 2009, Ankara, Turkey Dr. Sıdıka.
International Recommendations for Energy Statistics (IRES): A progress report Fourth Meeting of the UN Committee of Experts on Environmental-Economic Accounting.
1 Approved Terms of Reference for HAPUA Working Group No.5-ESI Services Project 6 Bilateral Contract Benchmarking.
Earthquake Response Cooperation Initiative Phase 1 Progress Report By Chinese Taipei May 19, 2001 APEC EWG 21 Kuala Lumpur, Malaysia.
Inception Report: 21st March, 2012
ASEAN Cooperation on Standards and Conformance Background Participation of stakeholders in the ACCSQ activities ACCSQ structure Measures undertaken Progress.
Doc.: IEEE Submission November 2007 Michael Lynch, Nortel Networks Update on IEEE IMT Advanced RR-TAG was directed to take.
Periodic Reporting Europe and North America Progress report and future strategy 11 March 2004 Information Meeting UNESCO Headquarters.
WP6 – Monitoring and Evaluation 17th November 2014 Rome.
REPORT TO EWG MEMBER (CORRESPONDENCE) Plan of Actions for (May) (June) (July) (August) (September)
process and procedures for assessments
Institutional Strengthening Expert, ARISE
Harmonizing Standards and Enhancing Technical Capacity in Measurement and Verification of Energy Savings of projects or organizations (CTI A) Dr.
CHU HAI COLLEGE OF HIGHER EDUCATION DEPARTMENT OF COMPUTER SCIENCE Preparation of Mid-Term Progress Report Bachelor of Science in Computer Science.
Mexico 8th Meeting of the Steering Committee of INTOSAI Committee on
Suggestion for next steps for PGA for REDD+ in Vietnam
PRC Information Session
ICP 7-th Regional Coordinators Meeting World Bank, Washington D.C.
26th February 2015 Teleconference
Agenda and expected outcomes
College of Alameda Integrated Planning and Budgeting Process
<month year> doc.: IEEE <030158r0> March 2004
Budget Community of Practice (BCOP)
Doc A6465/17/02, /02a and /02b Ag.no "Annex 2" supplement to Eurostat Annual Report, October 2016 Working Group on Articles A64 and A65 of the Staff.
Budget Community of Practice (BCOP)
Reliability Standards Development Plan
Ag. No Transparency Consultation
JRC-Institute for Environment and Sustainability
26th February 2015 Teleconference
Ag.no.17.1 Advancing the SRQ collection date
Point 8: A revision policy for the UOE data collection History
Next Steps Advisory group debrief call Circulate meeting summary
2016 AES – Draft Commission Regulation implementing Regulation (EC) No 452/2008 Agenda item 2.3 DSS Meeting 3-4 April 2014.
Mexico 8th Meeting of the Steering Committee of INTOSAI Committee on
Draft Mandate and Proposed Approach for the Drafting Group on
11-12 September 2007 Kuala Lumpur, Malaysia S.Kimura/IEEJ
UOE timeliness standards
EC BIAC & MBB Costs Studies
Adult Education Survey Anonymisation Point 6
European Statistical System Network on Culture (ESSnet Culture)
Role of the External Examiner
International Training Centre of the ILO
Presentation transcript:

Progress Report of Planning Interconnection Sub Working Group Presented to The 8 th Meeting of HAPUA Working Group No.2 - Transmission Kuala Lumpur, Malaysia 6 th October 2010 by Dr. Thana Boonyasirikul

Presented to The 8 th Meeting of HAPUA Working WG No.2-Transmission 2 The Meeting of APGCC#5 & HAPUA WC#11 (9-11 November 2009, Chiang Mai, Thailand) Presented the generation results of AIMS-II based on the input of 11 September 2009 The Meeting of PI SWG - Transmission Team #2 (1-3 December 2009, Bangi, Malaysia) Set up the Transmission Study Methodology The Special Meeting of PI SWG - Transmission Team : Sub System A (29 December 2009, Udon Thani, Thailand) -Transmission analysis was partially done for selected years -Transmission data of Laos System were received -Agreed to simplify transmission data of Myanmar and Vietnam The Meeting of PI SWG - Transmission Team #3 (3-4 March 2010, Bandung, Indonesia) -Discussion on preliminary results of Power System Study -Agreed on minor changes of criteria and assumption on Power System Study -Updated APGCC Work Plan The Special Meeting of WG2:Transmission-PI SWG (Discussion on AIMS-II) (28 June 2010, Petchburi, Thailand) -Key Finding and Issues of AIMS-II Generation Report -Discussion on AIMS-II Transmission -Results of the Steady State and Dynamic Simulation Related Meeting Events ( )

Presented to The 8 th Meeting of HAPUA Working WG No.2-Transmission 3 Completion of AIMS-II *Report on Generation System Study was circulated to Member Countries on 24 May 2010 *Minor corrections were made upon member comments and resubmitted to all members on 14 September 2010 *Member countries accepted AIMS-II results and reports prepared by PI SWG. *Submission of AIMS-II Final Results to member countries on November 2010 *AIMS-II can be used as a reference for implementation by concerned parties. Further studies are required to be carried out as necessary. Conclusions and Recommendations -The study indicates a saving of 788 MUSD with ASEAN interconnection network which is based on the data dated 29 September It is noted that the nature of input for AIMS-II study is dynamic. The result should be referred to the date of data availability. -The final AIMS-II report shall be composed of 4 reports, Generation System Study, Transmission System Study, Appendix and Executive Summary. Works Accomplished and Outcomes

Presented to The 8 th Meeting of HAPUA Working WG No.2-Transmission 4 Work Plan for AIMS-II Report AIM-II ReportLeaderStatusSubmission Generation System Study Report EGAT, Thailand Completed 6 th APGCC, 12 th HWC and 26 th Council Transmission System Study Report TNB, Malaysia Completed8 th Meeting of HAPUA WG No.2 Appendix EGAT and TNB Completed8 th Meeting of HAPUA WG No.2 Executive SummaryNPC, Philippines In progressPrior the 13 th Working Committee Meeting

Presented to The 8 th Meeting of HAPUA Working WG No.2-Transmission 5 Issues to be completed by a week after the 4 th Meeting *The PI SWG Leader requested all member countries to provide the statistical data of peak demand (MW) and energy demand (GWh) for the first 6 months of 2010 to Thailand delegate for the data collection. Issues to be examined by a week after the 4 th Meeting -Assumptions for Energy Price/Fuel Price shall be examined/identified to be put in the generation study report AIMS – II Report Structure is changed to: Volume I – Executive Summary Volume II – Generation Study Report Volume III – Transmission Study Report Volume IV – Appendices - Terms of Reference - Power Interconnection Sub working Group - Work Plan of Power Interconnection Sub Working Group - Power Development Plans of ASEAN Member Countries - Power Flow/Stability Diagrams (hard copy / CD files) Findings from the 4 th Meeting of PI SWG

Presented to The 8 th Meeting of HAPUA Working WG No.2-Transmission 6 Harmonization of Reliability Criteria for ASEAN Countries Future Work Plan Discussion on reliability criteria and data requirement for Planning Criteria Establishment of common reliability criteria and assumption Data collection and implementation Discussion on harmonization and validation of results Establishment of reliability criteria for the benchmarking of planning criteria among ASEAN countries Comparison reliability criteria among ASEAN countries Amendment and fine-tune Not Applicable Applicable

Presented to The 8 th Meeting of HAPUA Working WG No.2-Transmission 7 Harmonization of Reliability Criteria Tentative Schedule

Presented to The 8 th Meeting of HAPUA Working WG No.2-Transmission 8 Harmonization of Reliability Criteria Tentative Schedule

Presented to The 8 th Meeting of HAPUA Working WG No.2-Transmission 9