THIS IS A SINGLE WELD PROCEDURE. UP TO 99 WELD PROCEDURES CAN BE CREATED. ROBOT WILL ARRIVE WITH 1-2 INSTALLED FOR TESTING PURPOSES. A WELD PROCEDURE IS.

Slides:



Advertisements
Similar presentations
SPiiPlus Feedback Tuning
Advertisements

EPOCH 1000 Series Software Update New Features - March 2010.
QUICK GUIDE MANUAL GV-DVR System Organization 2. Specification.
LINE MOTION POSITION TRAVEL TERMINATION # TYPE DATA SPEED WORLD 50% 1: L P [1] 2000 IPM FINE 2: L P [2] 2000 IPM FINE 3: L P [3] 2000 IPM FINE 4: L P [4]
SUS DATA QUALITY DASHBOARD USER GUIDE NAVIGATION MENU Select a place to start… Navigating the front screen Navigating the data item validity screens Viewing.
Operating the Harmonizer
Microsoft Office XP Microsoft Excel
RoboCell and Cell Setup
User Friendly Item Maintenance A Family of Enhancements For iSeries 400 DMAS from  Copyright I/O International, 2006, 2007, 2008, 2010 Skip Intro Exit.
GMAW (MIG Welding) SECTION OVERVIEW:
ASENT_FMECA_LAB.PPT FMECA Lab Last revised 08/14/2014.
Programming The Hexcorder
Gas Metal Arc Welding (GMAW)
Mobileye Setup Wizard Version User manual
Enhanced Surface Tension Transfer for Pipe Welding
Jim Cuhel Welding Engineer Miller Electric Mfg. Co.
Control Panel Overview Key pad: A Qwerty Keypad, used to enter an address. Programmable Features: The programmable features allow you to program.
1 Lab Equipment. 2 TopicSlides DC Power Supply3-4 Digital Multimeter5-8 Function Generator9-12 Scope – basic controls13-20 Scope – cursors21-24 Scope.
Using the Unity 98 Cordless Response System Directions : Courtesy of IHC public relations.
Exceed Series Decorative Stitch Patterns The Exceed series also has a Decorative Pattern menu where intricate patterns can be selected. The Exceed Quilt.
CTS130 Spreadsheet Lesson 13 Working with Lists. Copying Data between Workbooks  Use the [Copy ]and [Paste] Buttons  Use the CTRL+[C] and CTRL + [V]
AccuMax Multi-Point Injection Mechanics
UPCOMING TRIPS The 'Upcoming Trips' tab (on the Travel Center home page) displays all current trips, booked online or with a Connexxus CSU Travel Agent.
1 Semester 2 Module 2 Introduction to Routers Yuda college of business James Chen
Basic equipment setup and welding procedures
GMAW Principles SECTION OVERVIEW:
How to Create a Book Purchase Request using Books in Print?
TRANSMILLE PATs The New Alternative To Fast, Easy & Efficient Portable Appliance Testing.
Copyright © Texas Education Agency, All rights reserved. 1 Web Technologies Website Development with Dreamweaver.
Using Backstage Lesson 2. Objectives Software Orientation: Backstage View Backstage view’s left-side navigation pane (see figure on the next slide) gives.
CTS130 Spreadsheet Lesson 3 Using Editing and Formatting Tools.
Using FunctionUsing Function Lesson 5 © 2014, John Wiley & Sons, Inc.Microsoft Official Academic Course, Microsoft Word Microsoft Excel 2013.
DEFINITION OF SPRAY TRANSFER KELVIN LONGDEN PROCEDURES DEPARTMENT.
Website Development with Dreamweaver
Instructors begin using McGraw-Hill’s Homework Manager by creating a unique class Web site in the system. The Class Homepage becomes the entry point for.
SETUP\Weld\Equip \\\\\\\\\\\JOINT\\10\% 1/17 Welder:Lincoln Electric PowerWave+ArcLnk 1 Process: 1 Wire diameter: [ ] Gas mixture: [ ] Description: [
1 The EDIT Program The Edit program is a full screen text editor that allows you to: Create text files Create text files Edit an existing text files Edit.
CREATING A TEST IN WORD 2007 Also creating and using equations in Word 2007 Jeff Klamm Tec 539.
i-Pendant for the R-J30iB Controller
Grade 11 Welding Simulation Lesson
IC 3 BASICS, Internet and Computing Core Certification Key Applications Lesson 11 Organizing the Worksheet.
Page 1 Non-Payroll Cost Transfer Enhancements Last update January 24, 2008 What are the some of the new enhancements of the Non-Payroll Cost Transfer?
Histo-Labels Easy to use and fun to setup. Create and edit all label menus to fulfill your slide labeling requirements. Print to any printer installed.
Select the Services Purchase Order Menu Select Add Recycling Services Purchase Order to create a new Services Purchase Order.
CIS111 PC Literacy Getting Started with Windows XP.
Chester High School ● Take Attendance ● Set up the grade book ● Enter assignments ● Record Scores ● Running Reports.
Using Advanced Options Lesson 14 © 2014, John Wiley & Sons, Inc.Microsoft Official Academic Course, Microsoft Word Microsoft Word 2013.
Asttraining.com Scan Procedures for Ford EEC-V OBD II Systems.
Overview of MSWS Control of 212-LC July 15, 2006.
Online Catalog Tutorial. Introduction Welcome to the Online Catalog Tutorial. This is the place to find answers to all of your online shopping questions.
1 2 Left Click 3 Left Click 4 Left Click NOTE: Your screen may look different; however, find the Start button (lower left corner); then All Programs; ending.
1 Excel Lesson 2 Organizing the Worksheet & Formulas Microsoft Office 2010 Introductory Pasewark & Pasewark.
2D Design – A Guide! SECTION 1.
Pasewark & Pasewark Microsoft Office 2003: Introductory 1 INTRODUCTORY MICROSOFT EXCEL Lesson 4 – Worksheet Formulas.
Subtractive Manufacturing Exercise #1 Step #2 Key Fob Project Using Velocity CNC Software for the CNC Milling Machine Note: In order to use this set of.
Copyright © Texas Education Agency, All rights reserved.1 Web Technologies Motion Graphics & Animation.
Example 7 Multiplying with Technology Chapter 7.3 Use technology to compute BA and AB if and.  2009 PBLPathways.
CUSTOMER ORDERING QUICK REFERENCE GUIDE November 9, 2015.
GMAW FCAW and MCAW Gas Metal Arc Welding Flux Core Arc Welding
1 i-Pendant for the R-J3iC & R-30iA Controllers ArcTool Version (GMAW) i Pendant New.
Spring Hill Assembly1 InnoSys Park Brake Tool Master Control Panel Screens 1 3-Mar-2008.
Purchase Orders Notes:.
Train Body The next series of slides will guide you through the construction of the train body. Start a new drawing and save it as Train Body.
MIG Welding. MIG – Metal Inert Gas, also referred to as GMAW. GMAW – Gas Metal arc welding.
Chapter 16 GMAW and FCAW: Equipment Assembly and Adjustment Miller Electric Mfg. Co.
Setting up Categories, Grading Preferences and Entering Grades
GAS METAL ARC WELDING (GMAW)
Using Charts in a Presentation
Digital Chart Recorder Operation
Two methods to observe tutorial
Presentation transcript:

THIS IS A SINGLE WELD PROCEDURE. UP TO 99 WELD PROCEDURES CAN BE CREATED. ROBOT WILL ARRIVE WITH 1-2 INSTALLED FOR TESTING PURPOSES. A WELD PROCEDURE IS MADE UP OF 3 SUB SCREENS: 1. PROCEDURE 2. MODE 3. SCHEDULES HERE, WELD PROCEDURE 1 IS SETUP FOR A CV WELDING PROCESS USING AN ARGON BLEND OF GAS. A NEW WELD PROCEDURE CAN BE CREATED OR AN EXISTING ONE CAN BE CHANGED TO CREATE A NEW PROCEDURE, WITH CURSOR ON ANY WELD PROCEDURE NUMBER PRESS F3- CMD., CURSER TO COPY WP, ENTER, A PROMPT WILL APPEAR AT BOTTOM ASKING TO ENTER A DESINATION PROCEDURE NUMBER, KEY IN AN UNUSED NUMBER FROM 1-99, ENTER, PRESS F-KEY FOR YES. THEN EDIT COPIED PROCEDURE NUMBER AS NEEDED. THE + / - SYMBOL IN FRONT OF EACH SETUP ITEM NOTES IF A SETUP SCREEN IS IN A COLLAPSED VIEW OR EXPANDED VIEW. IN THE EXAMPLE SCREEN, ALL 3 SETUP SCREENS ARE COLLAPSED. TO EXPAND THE VIEW, CURSOR TO DESIRED ITEM, PRESS F2-DETAIL JH LINE 0 \T1\ ABORTED\\\JOINT\100\% DATA\Weld\Procedure\ \\\\\\\ 0 1/12 + Procedure 1 [ ] + Mode 11 [CV ArMix ] + Schedules Procedure 2 [ ] + Mode 13 [RapidArc ArMix ] + Schedules [ TYPE ] DETAIL [ CMND ] [ VIEW ] HELP F2 F3 WELD PROCEDURE SCREEN PRESS DATA, F1-TYPE, WELD PROCDURES, ENTER 7

AT RIGHT, SEE A DETAILED VIEW OF THE PROCEDURE SUB SCREEN. TOOLS SUCH AS BURNBACK, GAS FLOW TIMES AND STRIKE WIRE FEED SPEED ARE SETUP HERE: WELD EQPT- 1 EXCEPT FOR MULTI ARM CELLS SCHEDULES-CAN BE SET TO 1-32 RUNIN-DISABLED EXCEPT FOR ALUMINUM BURNBACK-ENABLED WIRE STICK RESET-ENABLED RAMPING-RAMPING TRAVEL SPEED OR WIRE FEED SPEED HEATWAVE-OPTION FOR ALUMINUM WEAVING GAS PURGE-.35 SEC GAS PREFLOW-0 SEC GAS POSTFLOW-.20 SEC AS PRE-TIME-300 FOR FASTSTART AE PRE-TIME-100 FOR FASTSTART STRIKE WIRE FEED SPEED-USED AS THE RUNIN PROCEDURE TO START THE ARC, SLOW FEED RATE, IPM, TO GET A SMOOTH ARC ESTABLISHED JH LINE 0 \T1\ \\JOINT\100\% DATA\Weld\Procedure\ 11\\\\\\\ 1/24 - Procedure 1 [ ] Weld equipment: 1 Manufacturer: Lincoln Electric Model: PowerWave+Enet File name: AWE1WP01 Schedules: 5 Runin: DISABLED Burnback: ENABLED Wirestick resets: 3 ENABLED Ramping: DISABLED Heatwave: DISABLED Gas purge: 0.35 sec Gas preflow: 0.00 sec Gas postflow: 0.20 sec Arc Start pre-time: 0 msec Arc End pre-time: 0 msec Strike wire feed speed: 80 IPM [ TYPE ] DETAIL [ CMND ][ VIEW ] HELP PROCEDURE SCREEN (EXPANDED) 8 PLACE CURSOR ON + PROCEDURE, PRESS F2-DETAIL KEY

SELECTED MODE DESCRIPTION, 13 IS POWERWAVE MODE NUMBER FOR SETTING SEARCH CRITERIA FOR A NEW MODE. THE ROBOT SEARCHES THE PW MEMORY FOR PROCESSES WHICH HAVE ALL THE DESIRED ITEMS: PROCESS- GMAW, FCAW: F4-CHOICE MODE- PULSE, NON-PULSE, STT:F4-CHOICE WIRE- STEEL, ALUM.: F4-CHOICE AFTER 3 LINES ARE SET, PRESS F3-CMD, CURSOR TO LINE SEARCH, ENTER. ROBOT SEARCHES PW MEMORY FOR ALL MATCHES TO CRITERIA, THEN DISPLAYS THE MATCHES JH LINE 0 \T1\ ABORTED\\\JOINT\100\% DATA\Weld\Procedure\ 1\ 2/15 + Procedure 1 [ ] - Mode 13 [RapidArc ArMix ] Process GMAW-P Wire.035 in Steel Gas Ar CO2 Search Process: GMAW Mode: Pulse Wire: Steel [ TYPE ] DETAIL [ CMND ] [ VIEW ] HELP IN THIS SCREEN, DETAILS OF THE WELDING MODE ARE DEFINED LIKE WIRE TYPE, SIZE AND GAS. MODE SCREEN (EXPANDED) 9 PLACE CURSOR ON + MODE, PRESS F2-DETAIL KEY

THE SEARCH RESULTS ARE NOW DISPLAYED, AS A RESULT OF PRESSING THE F3-CMD KEY, CURSOR TO SEARCH, ENTER. THE VARIOUS MATCHES ARE NUMBERED THIS NOTES THAT THE CURSER IS ON LINE 1 OF 11 TOTAL MATCHES FOUND. DETAILS OF EACH MODE MATCH NUMBER PRESS F2-SELECT TO LOCK IN THE DESIRED MATCH. THE PREVIOUS MODE SETUP SCREEN WILL APPEAR NEXT, DISPLAYING THE MODE. PW MODE / MEMORY NUMBER JH LINE 0 \T1\ ABORTED\\\JOINT\\10\% SETUP\Eq\Search\\\\\\\\\\\\\\\ 0 1/11 PROCESS PULSE WIRE MATERIAL GMAW Steel # WIRE DIA DESCRIPTION in [GMAW Steel ] [CV CO2 ] [ ] in [GMAW Steel ] [CV ArMix ] [ ] [ TYPE ] SELECT HELP F2 SEARCH RESULT SCREEN 10

SCHEDULES SCREEN (EXPANDED) 11 PLACE CURSOR ON + SCHEDULES, PRESS F2-DETAIL KEY JH LINE 0 \T1\ ABORTED\\JOINT\100\% DATA\Weld\Procedure\ 11\\\\\\\ 3/21 - Schedules Schedule IPM Speed Time Runin Schedule Schedule Schedule Schedule Schedule Burnback Wirestick [ TYPE ] DETAIL [ CMND ][ VIEW ] HELP LISTED FIRST IS THE RUNIN PROCEDURE, FOLLOWED BY A SERIES OF WELD SCHEDULES. THE NUMBER OF SCHEDULES IS SET IN THE WELD PROCEDURE SCREEN, UP TO 32 PER PROCEDURE WITH A MAXIMUM 100 SCHEDULES AVAILABLE FOR USE. FINAL ITEMS SHOWN ARE THE BURNBACK AND WIRESTICK RESET PROCEDURES. FIRST COLUMN INDICATES SCHEDULE NUMBER OR ITEM. SECOND COLUMN INDICATES WIRE FEED SPEED. THIRD COLUMN INDICATES TRIM/VOLTAGE SETTING. FOURTH COLUMN IS FOR WELDING TRAVEL SPEED. FIFTH COLUMN IS FOR DELAY TIME FOR CRATER FILLING TO SETUP A WELD SCHEDULE, FIRST MAKE SURE THE DESIRED MODE HAS BEEN SETUP IN THE MODE SETUP SCREEN. THEN CURSER TO DESIRED SCHEDULE NUMBER AND PRESS F2-DETAIL. SEE SCREEN BELOW:

WELD SCHEDULE DETAIL VIEW 12 TEST1 LINE 0 \T1\\\\\\\\JOINT\\10\% DATA\Weld\Procedure\\\\\\\\\\\ 1/8 1 Weld Procedure 1 [\\\\\\\\\\\\\\\\] [CV ArMix GMAW # 11] [.035 in Steel Ar CO2 ] 2 Weld Schedule 28 [Schedule ] 3 Heatwave mode None 4 WFS 0.0 IPM 5 Volts 0.00 Volts 6 Pinch Travel speed 50.0 IPM 8 Delay Time \0.00 sec Feedback Arc Current 0.0 Amps Feedback Arc Voltage 0.0 Volts [ TYPE ]SCHEDULE HELP > LINE 1-NOTES WHICH WELD PROCEDURE IS BEING DISPLAYED AND CURRENT MODE DETAIL LINE 2- NOTES WHICH WELD SCHEDULE IS BEING VIEWED LINE 3- OPTIONAL HEATWAVE SETTING: STEP WITH WEAVING, RAMP WITH WEAVING, PULSE ON WEAVING. LINE 4- KEY IN DESIRED WIRE FEED SPEED LINE 5- FOR POWERWAVE CV PROCESSES, KEY IN DESIRED WELD VOLTAGE(0-50). FOR POWERWAVE PULSE PROCESSES, KEY IN DESIRED TRIM VALUE(.5-1.5) LINE 6-FOR PINCHING THE ARC; WAVE CONTROL FOR PULSE, ADJUST FREQUENCY LINE 7-FOR WELDING TRAVEL SPEED IF WELD SPEED IS USED IN THE PROGRAM LINE 8-FOR CRATER FILL STT ONLY: LINE 5 WILL INDICATE BACKGROUND CURRENT, TYPICAL RANGE IS FROM AMPS LINE 6 WILL INDICATE PEAK CURRENT, TYPICAL RANGE IS FROM AMPS

DETAIL VIEW OF WELD SCHEDULE WITH 13 HEATWAVE (OPTION) ENABLED JH LINE 0 \T1\ ABORTED\\\\JOINT\100\% DATA\Weld\Procedure\\\\\\\\\\\ 0 1 1/8 1 Weld Procedure 1 [\\\\\\\\\\\\\\\\] [RapidArc ArMix GMAW-P # 13] [.035 in Steel Ar CO2 ] 2 Weld Schedule 3 [Schedule ] 3 Heatwave mode Step with weaving Left Center Right WFS IPM Trim UltimArc Travel speed 55.0 IPM 8 Delay Time \0.00 sec Feedback Arc Current 0.0 Amps Feedback Arc Voltage 0.0 Volts [ TYPE ]SCHEDULE HELP > IF HEATWAVE IS ENABLED IN THE WELD PROCEDURE SETUP SCREEN, THE DETAILED VIEW OF THE WELD SCHEDULE WILL APPEAR AS SHOWN ABOVE. HEATWAVE USES DIFFERENT PROCEDURES FOR THE CENTER OF THE WEAVE AND LEFT AND RIGHT SIDE OF THE WEAVE.

WELD SYSTEM SCREEN 14 ( MENU, SETUP, F1-TYPE, WELD SYSTEM) JH LINE 0 \T1\ ABORTED\\\JOINT\\10\% SETUP\Weld\System\\\\\\\\\\\\\ 0 1/22 NAME VALUE Monitoring Functions 1 Arc loss: ENABLED\ 2 Gas shortage: DISABLED 3 Wire shortage: DISABLED 4 Wire stick: ENABLED 5 Power supply failure: ENABLED 6 Coolant shortage: DISABLED Weld Restart Function 7 Return to path: ENABLED 8 Overlap distance: 0 mm 9 Return to path speed: 200 mm/s Scratch Start Function 10 Scratch start: ENABLED 11 Distance: 7 mm 12 Return to start speed: 50 mm/s 13 Retry count: 1 Repeat Touch Retry Function 14 Repeat Touch Retry: ENABLED 15 Retry count: 2 Weld Speed Function 16 Default speed: 50 IPM Other Functions 17 On-The-Fly: ENABLED 18 Weld from teach pendant: ENABLED 19 Remote gas purge: DISABLED 20 Remote wire inch: DISABLED 21 Gas purge key: ENABLED 22 Gas purge time: 5\\ sec [ TYPE ] HELP

WELD EQUIPMENT SCREEN 15 ( MENU, SETUP, F1-TYPE, WELD EQUIPMENT) JH LINE 0 \T1\ ABORTED\JOINT\\10\% SETUP\Weld\Equip\\\\\\\\\\\\\\ 0 1/8 Welder:Lincoln Electric PowerWave+Enet Feeder Gear 1 AutoDrive\4R220\Std Spd (35T) 2 WIRE+ WIRE- speed: 50 IPM 3 High WIRE+ speed: 200 IPM 4 Feed forward/backward: ENABLED Timing: 5 Arc start error time: 1.40 sec 6 Arc detect time: sec 7 Arc loss error time: 0.25 sec 8 Gas detect time: 0.05 sec [ TYPE ] HELP