Name Event Date Name Event Date 1 CERN F. Zimmermann & W. Scandale HHH, CARE Meeting, Paris, April 17-18, 2007 High Energy High Intensity Hadron Beams.

Slides:



Advertisements
Similar presentations
CERN Robert Aymar – WelcomeCARE-HHH BEAM07, CERN, 1 October, 2007 CARE-HHH-APD event BEAM’07 "Finalizing the Roadmap for the Upgrade of the LHC and GSI.
Advertisements

Study of the Luminosity of LHeC, a Lepton Proton Collider in the LHC Tunnel CERN June F. Willeke, DESY.
A.KOVALENKO SUPERCONDUCTING MAGNETS for NICA BOOSTER & COLLIDER NICA ROUND TABLE DISCUSSION - 3 JINR, Dubna, November 05, 2008.
CERN W. Scandale & F. Zimmermann HHH, CARE’07, CERN, October 29-31, 2007 High Energy High Intensity Hadron Beams
Two Scenarios for the LHC Luminosity Upgrade Walter Scandale, Frank Zimmermann Special PAF meeting We acknowledge the support of the European.
Name Event Date Name Event Date 1 CERN F. Zimmermann CARE06, INFN, Frascati, November 17, 2006 High Energy High Intensity Hadron Beams
Two Scenarios for the LHC Luminosity Upgrade Walter Scandale, Frank Zimmermann ACES workshop We acknowledge the support of the European Community-Research.
CERN F. Ruggiero & W. Scandale CARE Steering Committee, Paris, 11/04/2006 High Energy High Intensity Hadron Beams CARE-HHH Network: coordinators: F. Ruggiero.
Name Event Date Name Event Date 1 CERN W. Scandale & F. Zimmermann HHH, CARE 08, CERN, High Energy High Intensity Hadron Beams
SLAC Accelerator Department The PEP-II Accelerator John T. Seeman Assistant Director of the Technical Division Head of the Accelerator Department SLUO.
Name Event Date Name Event Date 1 LHC Upgrade We acknowledge the support of the European Community-Research Infrastructure Activity under the FP6 "Structuring.
Overview of Possible LHC IR Upgrade Layouts CARE HHH-2004 Workshop CERN 8-11 November 2004 J. Strait, N.V. Mokhov, T. Sen Fermilab bnl - fnal - lbnl -
European Design Study Towards a TeV Linear Collider WP 2 : Beam Delivery System Co-ordinator: Deepa Angal-Kalinin CCLRC, Daresbury Laboratory.
Crab Cavities in IR1 and IR5 Some considerations on tunnel integration What will be the situation in the tunnel after the LHC IR Phase-1 Upgrade. What.
HL-LHC WP2 Brainstorming Meeting 1 Purpose of this meeting:  Introduce the main objectives of the new HL-LHC project: Prepare technical proposal by 2013.
E. Todesco DESIGN STUDY FOR THE LHC UPGRADE WP3: MAGNETS E. Todesco CERN, Geneva, Switzerland Thanks to O. Bruning, G. De Rijk, T. Nakamoto, J. M. Rifflet,
CERN F. Ruggiero CARE Steering Committee, CERN, 05/04/ 2004 High Energy High Intensity Hadron Beams CARE-HHH Network: coordinators: F. Ruggiero and W.
Francesco Ruggiero my key encounters with Francesco LEP dispersion & beam lifetime optics fundamentals, resistive wall transverse beam echoes.
HHH network Activity for the next 18 months Walter Scandale CERN CARE 06 Frascati, 16 November 2006.
Name Event Date Name Event Date 1 CERN W. Scandale & F. Zimmermann HHH, CARE 08, CERN, High Energy High Intensity Hadron Beams
Thoughts on crab cavity noise, Fritz Caspers, Bandwidth of cavity structure with loaded Q is nearly always MUCH higher than generator bandwidth.
Paris 5 September 2005 HHH Status progress W. Scandale CERN Accelerator Technology Department CARE-HHH Network: coordinators: F. Ruggiero and W. Scandale.
ESGARD NETWORK ACTIVITIES L. Rossi AT Division - CERN Workshop on Advanced Accelerator Magnets Archamps, F, March 2003.
FP7 - IA EUROLUMI Network Walter Scandale, Frank Zimmermann ESGARD-OMIA meeting CERN,
US LHC Accelerator Research Program Jim Strait For the BNL-FNAL-LBNL LHC Accelerator Collaboration DOE Meeting 18 April 2003 brookhaven - fermilab - berkeley.
1 BNL LARP Accelerator Physics Program Resources BNL role in national program BNL Accelerator Physics Program.
Global Design Effort ILC Crab Cavity Overview and requirements Andrei Seryi SLAC on behalf of ILC Beam Delivery and Crab-Cavity design teams Joint BNL/US-LARP/CARE-HHH.
J. Strait Fermilab 16 October 2006 Consideration on LHC upgrade from A US perspective.
Scenarios for the sLHC and the vLHC Walter Scandale, Frank Zimmermann CERN HCP2007 We acknowledge the support of the European Community-Research Infrastructure.
Frank Zimmermann, LHCb Upgrade Meeting Overview of LHC Machine Upgrade Plans from an LHCb Perspective - Frank Zimmermann LHCb Upgrade Meeting CERN, 5 August.
Flat-beam IR optics José L. Abelleira, PhD candidate EPFL, CERN BE-ABP Supervised by F. Zimmermann, CERN Beams dep. Thanks to: O.Domínguez. S Russenchuck,
Plan for Review of FCC- ee Optics and Beam Dynamics Frank Zimmermann FCC-ee Design Meeting 31 August 2015.
US LHC Accelerator Research Program (LARP) Background  Proposed in 2003 to coordinate efforts at US labs related to the LHC accelerator (as opposed to.
Joint IR Studies: Operating Margins Nikolai Mokhov Fermilab bnl - fnal- lbnl - slac US LHC Accelerator Research Program LARP Collaboration Meeting SLAC.
Frank Zimmermann, HHH 2 nd quarter 2006 CARE-HHH progress 2 nd quarter 2006 Francesco Ruggiero, Walter Scandale, Frank Zimmermann (substituting for F.R.)
LHC-CC Validity Requirements & Tests LHC Crab Cavity Mini Workshop at CERN; 21. August Remarks on using the LHC as a test bed for R&D equipment.
ECLOUD04, Panel Discussion, April 2004F. Zimmermann Panel Discussion future machines: higher intensity shorter bunch spacings and/or higher charge per.
Beam-beam compensation at RHIC LARP Proposal Tanaji Sen, Wolfram Fischer Thanks to Jean-Pierre Koutchouk, Frank Zimmermann.
Updates on Tevatron and LARP Vladimir Shiltsev FNAL/Accelerator Physics LARP/Accelerator Systems.
EuCARD-AccNet CERN-GSI Workshop on Modeling Electron-Cloud Effects welcome! CERN, Geneva, 7-8 March 2011, BE Auditorium Meyrin
Overview of Wire Compensation for the LHC Jean-Pierre Koutchouk CARE-HHH Meeting on beam-beam effects and beam-beam compensation CERN 08/28/2008.
E. Todesco LAYOUT FOR INTERACTION REGIONS IN HI LUMI LHC E. Todesco CERN, Geneva Switzerland Acknowledgements: B. Dalena, M. Giovannozzi, R. De Maria,
08/11/2007M. Giovannozzi – CARE-HHH-APD IR’071 Optics issues for Phase 1 and Phase 2 upgrades Massimo Giovannozzi, CERN Outline: –Option for Phase 1 and.
E. Todesco, Milano Bicocca January-February 2016 Unit 2 Magnets for circular accelerators: the interaction regions Ezio Todesco European Organization for.
Tentative conclusions. Beam parameters new parameter sets with acceptable electron cloud & pile-up events 25 ns spacing ultimate beam with low  * - may.
Introduction of Accelerators for Circular Colliders 高亮度 TAU-CHARM 工厂 & 先进光源, 2014/09.
Global Collaborations Towards LHC Crab Cavity J. P. Koutchouk Thanks to Rama Calaga and Rogelio Tomas Crab Cavity Validity Requirement Workshop August.
Name Event Date Name Event Date 1 CERN LHC Phase-II Upgrade Scenarios CERN-KEK Committee, 3 rd meeting, Friday 12 December CERN Lucio Rossi – CERN/AT.
Name Event Date Name Event Date 1 CERN Super-LHC We acknowledge the support of the European Community-Research Infrastructure Activity under the FP6 "Structuring.
Lucio Rossi The High Luminosity LHC Project Distinguished Lecturer 2013.
Turnaround time in modern hadron colliders & store-length optimization
High Energy High Intensity Hadron Beams
contribution to the round table discussion
Energy deposition studies on magnets. Aim. First applications
LUMI06 preliminary conclusions
D0 and its integrability
WP3 status Interaction Region design
High Energy High Intensity Hadron Beams
PROPOSALS FOR HIGH INTENSITY – HIGH ENERGY PROTON BEAMS
CLIC-ILC BDS & MDI work.
HEHIHB - WP1 Accelerator Magnet Technology
LHC Accelerator Upgrade
CSP Meeting CERN CERN Accelerators in th November 2010
Measurements, ideas, curiosities
Frank Zimmermann & Walter Scandale
SLHC-PP kick-off meeting, CERN 9 April 2008
Thursday Summary of Working Group I
High Energy High Intensity Hadron Beams
High Energy High Intensity Hadron Beams
LHC Machine Advisory Committee, CERN 12th June 2008
Presentation transcript:

Name Event Date Name Event Date 1 CERN F. Zimmermann & W. Scandale HHH, CARE Meeting, Paris, April 17-18, 2007 High Energy High Intensity Hadron Beams Network coordinated by W. Scandale and F. Zimmermann Input from L. Bottura, J.-P. Koutchouk, E. Laface, L. Rossi, D. Tommasini, K. Wittenburg,

Name Event Date Name Event Date 2 CERN F. Zimmermann & W. ScandaleHHH, CARE Meeting, Paris. April 17-18, 2007 CARE-HHH network Coordinate and integrate the activities of the accelerator and particle physics communities in a worldwide context, towards achieving superior High-Energy High-Intensity Hadron Beam facilities for Europe  road map for the upgrade of the European accelerator infrastructure (LHC and GSI accelerator complex)  coordinate activities and foster future collaborations  dissemination and outreach WP1: Advancements in Accelerator Magnet Technologies (AMT) WP2: Novel Methods for Accelerator Beam Instrumentation (ABI) WP3: Accelerator Physics and synchrotron Design (APD) Participating institutes: CEA, CERN, CSIC-CIEMAT, CCLRC, DESY, GSI, INFN, PSI, TEU, WUT Associated institutes: CRPP, ENEA, TUBE, ESRF, UPSA, FZK, TEMF, US-LARP (BNL,FNAL,LBNL,SLAC), JINR, IHEP, KEK Additional collaborations: Texas A&M U., U. Geneva, U. Bologna

Name Event Date Name Event Date 3 CERN F. Zimmermann & W. ScandaleHHH, CARE Meeting, Paris. April 17-18, 2007 activities since CARE’06 Events: 3 HHH workshops held + HHH-US-LARP coordination meetings 8 further workshops/symposia planned Dissemination and outreach: presentations at 2 LHC-detector upgrade workshops, at 3 CERN & INFN management meetings, 3 departmental/project seminars 3 HHH workshop proceedings close to completion 3 articles published in CERN Courier HHH web sites maintained & developed Exchanges and education: several Russian, 2 US, and 1 EU accelerator physicist plus 3 representatives of European industry supported for HHH workshops 1 EU scientist supported for 2-week visit to CERN 5 doctoral students recruited for summer 2007: 3 EU summer students

Name Event Date Name Event Date 4 CERN F. Zimmermann & W. ScandaleHHH, CARE Meeting, Paris. April 17-18, 2007 workshops since CARE’06 4th CARE-HHH-ABI workshop on Simulation of BPM Front-End Electronics and Special Mechanical Designs, Lüneburg, Germany, 30 November - 1 December 2006, Proceedings CARE-Conf HHH 4th CARE-HHH-ABI workshop on Simulation of BPM Front-End Electronics and Special Mechanical Designs, Lüneburg, Germany, 30 November - 1 December 2006, Proceedings CARE-Conf HHH Joint CARE-HHH-APD, CARE-ELAN, and EUROTeV mini-workshop on E-Cloud Clearing (ECL2), CERN, Geneva, 1-2 March 2007 Joint CARE-HHH-APD, CARE-ELAN, and EUROTeV mini-workshop on E-Cloud Clearing (ECL2), CERN, Geneva, 1-2 March 2007 CARE-HHH-APD mini-workshop on Crystal Channeling for Large Colliders: Machine and Physics Applications (CC-2007), CERN, March 2007 CARE-HHH-APD mini-workshop on Crystal Channeling for Large Colliders: Machine and Physics Applications (CC-2007), CERN, March 2007

Name Event Date Name Event Date 5 CERN F. Zimmermann & W. ScandaleHHH, CARE Meeting, Paris. April 17-18, 2007 major presentations INFN CSN1 Meeting, Frascati, 28 November “H8-RD22 Experiment to test Crystal Collimation for the LHC” W. Scandale LHCb Upgrade Workshop, Edinburgh, 11 January, “LHC Upgrade Plan and Ideas - Scenarios and Constraints from the Machine Side,” invited talk, F. Zimmermann Joint AB & LHC Project Seminar, CERN, 18 January 2007 – “Baseline Scenario for the LHC Luminosity Upgrade, summary of the CARE-HHH LHC-LUMI-06 workshop” W. Scandale, F. Zimmermann ATLAS & CMS Detector Electronics Upgrade Workshop, CERN, March “Two Scenarios for the LHC Luminosity Upgrade” W. Scandale LHC Project Seminar, CERN, 15 March “H8-RD22 Experiment to Test Crystal Collimation for the LHC” W. Scandale

Name Event Date Name Event Date 6 CERN F. Zimmermann & W. ScandaleHHH, CARE Meeting, Paris. April 17-18, 2007 deliverables & milestones compared with original plan (CARE’06) Stones (MS) and Intermediate Deliverables (ID). The workshop on Coil Manufacturing Optimization was postponed to 2004: HHH & HHH-APD web site => OK 2005: creation of first web-based beam dynamics code repository => OK : web based database for s.c. cables and magnets => OK, 40% complete => OK, 40% complete web reference for IR optics => OK booster synchrotron optics => delayed to 2007 structured list of intensity limits => nearing completion scaling laws for magnet and cryogenic cost => summer student 2 summer students + 1 doctoral student

Name Event Date Name Event Date 7 CERN F. Zimmermann & W. ScandaleHHH, CARE Meeting, Paris. April 17-18, 2007 WP1: Advancements in Accelerator Magnet Technologies (AMT)

Name Event Date Name Event Date 8 CERN F. Zimmermann & W. ScandaleHHH, CARE Meeting, Paris. April 17-18, 2007 Superconductors Database (SDB) database structure complete database structure complete web interfaces complete web interfaces complete since January’07 collaboration with FNAL and BNL on magnet & cable data sharing since January’07 collaboration with FNAL and BNL on magnet & cable data sharing main work left to do: creation of automatic tools which import data from existing databases, e.g., for LHC, Tevatron and RHIC, to SDB core main work left to do: creation of automatic tools which import data from existing databases, e.g., for LHC, Tevatron and RHIC, to SDB core this last task will be completed with the help of two summer students in 2007 this last task will be completed with the help of two summer students in 2007 Courtesy E. Laface

Name Event Date Name Event Date 9 CERN F. Zimmermann & W. ScandaleHHH, CARE Meeting, Paris. April 17-18, 2007 SDB example SDB example Courtesy E. Laface

Name Event Date Name Event Date 10 CERN F. Zimmermann & W. ScandaleHHH, CARE Meeting, Paris. April 17-18, 2007 AMT activity OSOM AMT activity OSOM design of 2 T pulsed superferric magnet, follow-up of ECOMAG cable and coil in the iron configured to minimize loss; conceptual design that dissipates less than 10 W/m in the superconducting coil, and a warm iron (i.e. negligible loss power); two variants: wide iron and compact version with correction coil, both suitable for a PS upgrade. other options also examined, such as transmission-line magnets using large current (typically 100 kA), and open gap magnets; these options were discarded because of practical issues (bending radius, magnet size); summary report within next few weeks [L. Bottura] also ongoing: comparison of s.c. and n.c. options for fast cycling “PS2”

Name Event Date Name Event Date 11 CERN F. Zimmermann & W. ScandaleHHH, CARE Meeting, Paris. April 17-18, 2007 AMT exchanges F. Broggi (Milano) visited CERN for 2 weeks in April to work on heat deposition in low-  region F. Broggi (Milano) visited CERN for 2 weeks in April to work on heat deposition in low-  region Primary goal: change of energy deposition versus distance between triplet and IP. First study showed little dependence. Question byh US-LARP. Present activity: consolidate the conclusions and explore other parts of the parameter space; collaboration with C. Hoa/CERN on precise FLUKA description of IR1 and IR5, including exact magnetic fields (well advanced); set up a few PC's running the latest version of FLUKA (done); switch to latest FLUKA source (DPMJET), used at CERN; confirm the Valencia results with the latest descriptions, source and FLUKA version; prepare a study program of study showing parameter regions still to be explored; investigate these (aperture, insertion length, crossing angle) [J.-P. Koutchouk] E. Laface visited FNAL & BNL for 1 week to coordinate work on s.c. database E. Laface visited FNAL & BNL for 1 week to coordinate work on s.c. database

Name Event Date Name Event Date 12 CERN F. Zimmermann & W. ScandaleHHH, CARE Meeting, Paris. April 17-18, 2007 planned AMT workshops CARE-HHH-AMT workshop on Superconducting Magnets and Cables, 3.5 days, at CERN reviews of cables and magnet design for high field superconducting magnets CARE-HHH-AMT workshop on Superconducting Magnets and Cables, 3.5 days, at CERN reviews of cables and magnet design for high field superconducting magnets September: CARE-HHH-AMT workshop on Heat Generation and Heat Transfer in Superconducting Magnets (THERMOMAG’07), Paris, 2 days minimizing and evacuating heat in the next generation of superconducting magnets for high intensity particle accelerators, such as the IR magnet for the LHC luminosity upgrade and the fast cycling magnets for FAIR and for the LHC injector chain upgrade; identify the state of the art on (1) cooling techniques (fluids and regimes), (2) heat transfer mechanisms, (3) modeling of heat transfer from coils to cooling system, (4) heat transfer experiments; identify a common set of thermal design criteria September: CARE-HHH-AMT workshop on Heat Generation and Heat Transfer in Superconducting Magnets (THERMOMAG’07), Paris, 2 days minimizing and evacuating heat in the next generation of superconducting magnets for high intensity particle accelerators, such as the IR magnet for the LHC luminosity upgrade and the fast cycling magnets for FAIR and for the LHC injector chain upgrade; identify the state of the art on (1) cooling techniques (fluids and regimes), (2) heat transfer mechanisms, (3) modeling of heat transfer from coils to cooling system, (4) heat transfer experiments; identify a common set of thermal design criteria

Name Event Date Name Event Date 13 CERN F. Zimmermann & W. ScandaleHHH, CARE Meeting, Paris. April 17-18, 2007 WP2: Novel Methods for Accelerator Beam Instrumentation (ABI)

Name Event Date Name Event Date 14 CERN F. Zimmermann & W. ScandaleHHH, CARE Meeting, Paris. April 17-18, th ABI workshop 27 participants: 6 CERN, 7 DESY, 5 GSI, 1 CEA, 2 RAL, 2 Globes Electronics, 3 Kyocera, 1 FNAL 27 participants: 6 CERN, 7 DESY, 5 GSI, 1 CEA, 2 RAL, 2 Globes Electronics, 3 Kyocera, 1 FNAL topics: BPM sensors, BPM electronics, cold BPMs topics: BPM sensors, BPM electronics, cold BPMs proceedings almost ready, will be published as CARE-Conf HHH proceedings almost ready, will be published as CARE-Conf HHH

Name Event Date Name Event Date 15 CERN F. Zimmermann & W. ScandaleHHH, CARE Meeting, Paris. April 17-18, 2007 planned ABI workshop End of 2007: HHH-ABI annual workshop on Tools for Diagnostic Systems at High-Intensity (Pre-) Accelerators; Emittance Preservation and Measurements in the Accelerator Chain, GSI, Germany End of 2007: HHH-ABI annual workshop on Tools for Diagnostic Systems at High-Intensity (Pre-) Accelerators; Emittance Preservation and Measurements in the Accelerator Chain, GSI, Germany

Name Event Date Name Event Date 16 CERN F. Zimmermann & W. ScandaleHHH, CARE Meeting, Paris. April 17-18, 2007 WP3: Accelerator Physics and synchrotron Design (APD)

Name Event Date Name Event Date 17 CERN F. Zimmermann & W. ScandaleHHH, CARE Meeting, Paris. April 17-18, 2007 CERN Courier 2, 2007

Name Event Date Name Event Date 18 CERN F. Zimmermann & W. ScandaleHHH, CARE Meeting, Paris. April 17-18, 2007 LHC upgrade parameters parameter 25 ns, smaller  * 50 ns, long transverse emittance 3.75 protons per bunch bunch spacing 2550 beam current longitudinal profile GaussFlat rms bunch length beta* at IP1& full crossing angle Piwinski parameter peak luminosity events per crossing initial lumi lifetime effective luminosity (T turnaround =5 h) e-c heat SEY=1.4(1.3) 1.04 (0.59)0.36 (0.1) SR heat load K image current heat gas-s. 100 h (10 h)  b 0.06 (0.56)0.09 (0.9) D0 + crabwire comp. two LHC upgrade scenarios developed at LUMI’06: 25 ns and 50 ns spacing

Name Event Date Name Event Date 19 CERN F. Zimmermann & W. ScandaleHHH, CARE Meeting, Paris. April 17-18, 2007 upgrade bunch structures 25 ns 50 ns nominal 25 ns ultimate & 25-ns upgrade 50-ns upgrade, no 50 ns 50-ns upgrade with 25-ns collisions in LHCb 25 ns new alternative! new baseline!

Name Event Date Name Event Date 20 CERN F. Zimmermann & W. ScandaleHHH, CARE Meeting, Paris. April 17-18, ns spacing 50 ns spacing luminosity evolution average luminosity initial luminosity peak may not be useful for physics

Name Event Date Name Event Date 21 CERN F. Zimmermann & W. ScandaleHHH, CARE Meeting, Paris. April 17-18, ns spacing 50 ns spacing event pile up

Name Event Date Name Event Date 22 CERN F. Zimmermann & W. ScandaleHHH, CARE Meeting, Paris. April 17-18, ns, low  *, with leveling 50 ns, long bunches, with leveling events/crossing run time N/A 2.5 h av. luminosity N/A 2.6x10 34 s -1 cm -2 events/crossing run time 2.5 h 14.8 h av. luminosity 2.6x10 34 s -1 cm x10 34 s -1 cm -2 events/crossing7575 run time 9.9 h 26.4 h av. luminosity 2.6x10 34 s -1 cm x10 34 s -1 cm -2 assuming 5 h turn-around time

Name Event Date Name Event Date 23 CERN F. Zimmermann & W. ScandaleHHH, CARE Meeting, Paris. April 17-18, ns spacing 50 ns spacing luminosity evolution with leveling average luminosity 150 events / crossing

Name Event Date Name Event Date 24 CERN F. Zimmermann & W. ScandaleHHH, CARE Meeting, Paris. April 17-18, 2007 dynamic  squeeze for 50-ns option  N 150

Name Event Date Name Event Date 25 CERN F. Zimmermann & W. ScandaleHHH, CARE Meeting, Paris. April 17-18, 2007 dynamic bunch length change for 50-ns option we might also reduce the charge/bunch and go for shorter bunches

Name Event Date Name Event Date 26 CERN F. Zimmermann & W. ScandaleHHH, CARE Meeting, Paris. April 17-18, 2007 IR upgrade optics “compact low-gradient” NbTi,  *=25 cm <75 T/m (Riccardo De Maria, Oliver Bruning) “modular low gradient” NbTi,  *=25 cm <90 T/m (Riccardo De Maria, Oliver Bruning) “low  max low-gradient” NbTi,  *=25 cm <125 T/m (Riccardo De Maria, Oliver Bruning) <125 T/m (Riccardo De Maria, Oliver Bruning) standard Nb 3 Sn upgrade,  *=25 cm ~ 200 T/m, 2 versions with different magnet parameters (Tanaji Sen et al, Emmanuel Laface, Walter Scandale) + crab-waist sextupole insertions? (LNF/FP7) early separation with  *=8 cm, Nb 3 Sn includes D0; either triplet closer to IP or Q0; being prepared for PAC’07 (Jean-Pierre Koutchouk et al) compatible with 50-ns upgrade path

Name Event Date Name Event Date 27 CERN F. Zimmermann & W. ScandaleHHH, CARE Meeting, Paris. April 17-18, 2007 crab waist scheme minimizes  at s=-x/  c focal plane realization: add sextupoles at right phase distance from IP initiated and led by LNF in the frame of FP7; first beam tests at DAFNE later in 2007 Hamiltonian

Name Event Date Name Event Date 28 CERN F. Zimmermann & W. ScandaleHHH, CARE Meeting, Paris. April 17-18, 2007 phased LHC upgrade recent CERN management decision: early IR upgrade (“phase-1”): based on NbTi magnets, implemented ~2012 recent CERN management decision: early IR upgrade (“phase-1”): based on NbTi magnets, implemented ~2012 “low-gradient” large-aperture NbTi optics solutions developed by HHH are three good candidates “low-gradient” large-aperture NbTi optics solutions developed by HHH are three good candidates IR optics selection by Lyn Evans in 2007; input from HHH studies IR optics selection by Lyn Evans in 2007; input from HHH studies more ambitious Nb 3 Sn upgrade and higher luminosity planned in a 2 nd phase more ambitious Nb 3 Sn upgrade and higher luminosity planned in a 2 nd phase

Name Event Date Name Event Date 29 CERN F. Zimmermann & W. ScandaleHHH, CARE Meeting, Paris. April 17-18, 2007 ECL2 workshop 35 participants: 16 CERN (4 AB/ABP, 1 AB/OP, 7 AB/RF, 2 AT-VAC, 2 TS), 3 German enamel industry (Eisenwerke Dueker, Wendel ), 4 US (BNL, Cornell, LBNL & SLAC), 1 KEK, others from European institutes (Astec, LNF, DESY, ANKA, U. Rostock, CELLS, U. Sannio, ESRF) 35 participants: 16 CERN (4 AB/ABP, 1 AB/OP, 7 AB/RF, 2 AT-VAC, 2 TS), 3 German enamel industry (Eisenwerke Dueker, Wendel ), 4 US (BNL, Cornell, LBNL & SLAC), 1 KEK, others from European institutes (Astec, LNF, DESY, ANKA, U. Rostock, CELLS, U. Sannio, ESRF) topics: CERN NEG coating facility, motivation, technological solutions, simulations, beam measurements, impedance, - for PS2, SPS upgrade, LHC upgrade, CLIC & ILC topics: CERN NEG coating facility, motivation, technological solutions, simulations, beam measurements, impedance, - for PS2, SPS upgrade, LHC upgrade, CLIC & ILC

Name Event Date Name Event Date 30 CERN F. Zimmermann & W. ScandaleHHH, CARE Meeting, Paris. April 17-18, 2007 slotted vacuum chamber (W. Bruns) New! enamel electrodes (F. Caspers) New! electrete inserts (F. Caspers) New! NEG coating (P. Chiggiato) ECL2: solutions against electron cloud slotted chamber enamel-based electrode

Name Event Date Name Event Date 31 CERN F. Zimmermann & W. ScandaleHHH, CARE Meeting, Paris. April 17-18, 2007 CC-2007 topics: critical review of experimental results critical review of experimental results crystal production technologies crystal production technologies application of bent crystals to LHC collimation system application of bent crystals to LHC collimation system assessment of new crystals through experiments at SPS and Tevatron assessment of new crystals through experiments at SPS and Tevatron use of crystals for diffractive physics use of crystals for diffractive physics co-sponsored by INTAS 45 participants: INFN Genova, U. Ferrara, INFN Legnaro, PNPI Gatchina, IHEP Protvino, FNAL, JINR Dubna, INFN Frascati, INFN Roma, U. Manchester, U. Texas,

Name Event Date Name Event Date 32 CERN F. Zimmermann & W. ScandaleHHH, CARE Meeting, Paris. April 17-18, 2007 PRL article on 2006 SPS experiments published last week! including CARE acknowledgement SPS crystal collimation test

Name Event Date Name Event Date 33 CERN F. Zimmermann & W. ScandaleHHH, CARE Meeting, Paris. April 17-18, crystal experiments 7 weeks of SPS runs allocated to collaboration Goals: (1) test multi-strip crystals (2) check the effect on ions (3) verify their fragmentation and e.-m. dissociation inside the crystal, (4) test the effectiveness of crystal collimation for ILC Support: CARE-HHH, INTAS-CERN, INFN-NTA, Russian Foundation for Basic Research, CERN AB and AT Departments

Name Event Date Name Event Date 34 CERN F. Zimmermann & W. ScandaleHHH, CARE Meeting, Paris. April 17-18, 2007 APD exchanges R. De Maria (grad student) visited FNAL for 1 month in February-March to work on heat deposition in low-  region for NbTi “low-gradient” IR optics solutions R. De Maria (grad student) visited FNAL for 1 month in February-March to work on heat deposition in low-  region for NbTi “low-gradient” IR optics solutions Collaboration with N. Mokhov, US-LARP W. Scandale visited FNAL for 1 week in February to participate in Tevatron crystal experiment W. Scandale visited FNAL for 1 week in February to participate in Tevatron crystal experiment Two graduate students (U. Dorda, G. Sterbini) will participate in RHIC beam-beam compensation experiments for two weeks this June, in the frame of HHH/US-LARP collaboration Two graduate students (U. Dorda, G. Sterbini) will participate in RHIC beam-beam compensation experiments for two weeks this June, in the frame of HHH/US-LARP collaboration

Name Event Date Name Event Date 35 CERN F. Zimmermann & W. ScandaleHHH, CARE Meeting, Paris. April 17-18, 2007 planned APD workshops CARE-HHH-APD CERN-GSI bi-lateral working meeting on Collective Effects–Coordination of Theory and Experiments, CERN, Geneva, Switzerland CARE-HHH-APD CERN-GSI bi-lateral working meeting on Collective Effects–Coordination of Theory and Experiments, CERN, Geneva, Switzerland 1-5 October: CARE-HHH-APD event BEAM’07, CERN 1-5 October: CARE-HHH-APD event BEAM’07, CERN - mini-workshop on LHC Injectors Upgrade & FAIR PS2, SPS enhancements, GSI upgrades - mini-workshop on LHC Beam Parameters Upgrade beam parameters and upgrade scenarios; e.g. bunch spacing, operation with large Piwinski angle, luminosity performance - Francesco Ruggiero Memorial Symposium (Oct. 3) 7-9 November: CARE-HHH-APD workshop on LHC IR Upgrade (LUMI'07), INFN Frascati, Italy new low-beta quadrupoles, detector-integrated dipoles and quadrupoles, crab cavities, wire compensation, experience with new DAFNE IR 7-9 November: CARE-HHH-APD workshop on LHC IR Upgrade (LUMI'07), INFN Frascati, Italy new low-beta quadrupoles, detector-integrated dipoles and quadrupoles, crab cavities, wire compensation, experience with new DAFNE IR

Name Event Date Name Event Date 36 CERN F. Zimmermann & W. ScandaleHHH, CARE Meeting, Paris. April 17-18, 2007 Francesco Ruggiero Memorial Symposium Tentative speakers: S. Berg, C. Biscari, O. Bruning, W. Chou, M. Furman, K. Hirata, A. Mostacci, L. Palumbo, C. Petit-Jean-Genaz, S. Petracca, E. Picasso, W. Scandale, J. Thomashausen, F. Zimmermann,… 3 October 2007 during HHH-APD BEAM’07

Name Event Date Name Event Date 37 CERN F. Zimmermann & W. ScandaleHHH, CARE Meeting, Paris. April 17-18, 2007 Gantt chart for next 18 months AMT and ABI

Name Event Date Name Event Date 38 CERN F. Zimmermann & W. ScandaleHHH, CARE Meeting, Paris. April 17-18, 2007 Gantt chart for next 18 months APD

Name Event Date Name Event Date 39 CERN F. Zimmermann & W. ScandaleHHH, CARE Meeting, Paris. April 17-18, 2007 Conclusions Conclusions numerous high-impact workshops numerous high-impact workshops focused activities in many frontier areas focused activities in many frontier areas - crystal collimation, slim magnets, e-cloud suppression, low- angle crab cavities, beam-beam compensation, novel optics design schemes, fast cycling s.c. magnets, new beam diagnostics results benefit global accelerator community results benefit global accelerator community - code repository, s.c. database, intensity limits enhanced dissemination & training effort enhanced dissemination & training effort - mutual visits between partner labs, publications, seminars, web pages, summer students and graduate students HHH is “high-return investment for Europe” HHH is “high-return investment for Europe”