Some Basic UVM Info 425 acres of maintained acreage.. Central Steam Plant Central Chilled Water Plant Back Up Boilers Research.

Slides:



Advertisements
Similar presentations
* A chiller capable of producing water temperatures of low 40s on the evaporator side and above 135° on the condenser side.
Advertisements

A Decade of Moooovn Utilities Forward at UVM David C. Blatchly, EI Project Engineer The University of Vermont - UVM.
UCSD Medical Center - Hillcrest Campus Case Study Gerry White Facilities Design & Construction University of California, San Diego.
New Technology Improves Efficiency of Universitys Energy Infrastructure Frank Brewer Associate Vice President for Facilities Management University of Maryland.
Geoexchange at CMU Regional public higher education institution 3 campuses in Grand Junction, CO. Main campus 78 acres and 1.5 million s.f. under.
Lindbergh Field International Airport New Terminal Bill Mahoney LSW Engineers.
New York Life Building 20 West Ninth Street Mike Thome Hoss & Brown.
April 23, 2015Committee for Sustainability Building Systems and Energy Use Drexel University April 24, 2008.
Installation of New CHP system at the Old Aberdeen Campus.
Pentagon Washington, D.C. UMCS contract for modernization of the Pentagon Scope includes: Design, engineering and commissioning of the Building Operations.
Learning Outcomes Upon completion of this training one should be able to: Identify open loop and closed loop campus-type hydronic water system applications.
Consulting + Engineering + Technology + Construction Page 1 5/1/2015 Sharp Grossmont Hospital Pre-Bid Phasing of Early Utilities Sharp Grossmont Hospital.
Welcome To Our 14 th Annual All Hands Meeting Sal Chiarelli, Director of Physical Plant, 9/16/2014.
Worcester Polytechnic Institute Gordon Library and Fuller Laboratory B.N. Tripathi Senior Vice President CES/Way.
ENERGY EFFICIENCY FOR END-USERS.  CSU Chancellors office coordinates the efforts to accomplish the goals established by Assembly Bill 32 for green house.
COMBINED HEAT & POWER J.R. Simplot Mountain Home, Idaho.
UTSW Thermal Energy Plants, Power Generation and Electrical System What do we do to meet the Emission Reduction, Energy usage Reduction and Electrical.
Team 2: Kelly Foster Chad Mills Lirjon Llusho Dave Rosso September 30, 2009.
CWS 70ºF CWR 80ºF Cooling Tower Humid air Out with heat Dry air In Central Energy Plant A/C Unit Work EMCS 404 Chilled Water Supply 40ºF Chilled Water.
UTC’s Central Energy Plant Humid air Out with heat Central Energy
COGENERATION Allison M. Selk 12/8/04 CBE 562.
SAU Energy Talking Points SAU per square foot energy cost of $1.20 is among the most efficient in the state. District Heating and Cooling Systems save.
Utility Planning For North Campus Upgrades Area in and around Cook Physical Science Building Sal Chiarelli, Director of Physical Plant November 15, 2007.
UTSW Thermal Energy Plants, Power Generation and Electrical System What do we do to meet the Emission Reduction, Energy usage Reduction and Electrical.
POWER GENERATION TECHNOLOGIES
Integration of Mechanical System Redesign Geothermal Heat Pump Redesign Wesley S. Lawson Architectural Engineering Mechanical Option Pennsylvania State.
Garrison Oak Technical Park Economic Update Economic Update June 26, 2015.
UVM -IBM Energy Collaboration Meeting 3/19/12. Salvatore Chiarelli Director Of Physical Plant UVM 284 East Avenue, Burlington VT (802) (802)
Transitioning to a Cleaner Energy Supply. Catalyzing climate solutions …in the lab …in the classroom…on our campus.
Charles F. Hurley Building Case Study B.J. Mohammadipour Bureau of State Office Buildings.
CNN Center John Hester Turner Properties, Inc.. CNN Center Built in ,583,000 square feet on 18 floors Five structures joined by a common atrium.
Auraria Higher Education Center Case Study John Ismert & Frank Ellis Auraria Higher Education Center Facilities Management.
Cogeneration at UC July 18, Welcome 3 Transformation of the Power Plant POWER PLANT CENTER OF CAMPUS CENTRAL UTILITY PLANT 2007.
UVM UTILITY SYSTEM MASTER PLANNING IDEA CONFERENCE International District Energy Association Sal Chiarelli, Director of Physical Plant, UVM February 2006.
1 Steam to Hot Water Conversion The University of British Columbia Paul Holt Director, Generation & Distribution.
1 Medical Office Building. 2 Occupancy – 400 persons 8 a.m. – 5 p.m. Monday - Friday Building Characteristics Three stories 40,000 square feet (200’ x.
Foothill College & Space Science Center Bill Kelly Viron Energy Services (510) ext 13,
Technology details, potential and experiences of Trigeneration
University Medical Center of Princeton David Bodnar Construction Management 2010 Senior Thesis.
Name of Building(s) or Project Speaker(s) Organization(s)
Marriott Corporate Headquarters
Phoenix Convention Center Phoenix, Arizona District or Distributed Integrated EnergyDistrict Heating and Cooling Robert McMillin Siemens Industry, Inc.
Salvatore Chiarelli Director Of Physical Plant UVM 284 East Avenue, Burlington VT (802) (802) fax
Lecture Objectives: Finish boilers and furnaces Start with thermal storage systems.
Solar Energy. How it Works  Solar thermal devices use direct heat from the sun, concentrating it in some manner to produce heat at useful temperatures.
Architectural Engineering Senior Thesis Mechanical System Redesign Saint Joseph Medical Center Chris Nicolais.
Whitman-Hanson Regional High School Energy Efficient Systems: HVAC All fans and pumps are VFD controlled with fully reactive controls Condensing gas-fired.
11. 2 Steam Energy Energy that comes from the push of steam.
Generating Electricity
File reference:Author/Dept:Creation date:Classification: D?Keeping:Page: ‹#› / Water Reduction Efforts BF Goodrich Fort Wayne Facility.
Physical Plant 2015 All Hands Meeting Sal Chiarelli, Director of Physical Plant, UVM October 8, 2015.
Utah State University Logan Utah. Founded 1888 as a Land Grant Institution Host City – Logan, Utah (48,ooo+ population) ~ 15,000 Students (~ 28,700 students.
Welcome. GRU South Energy Center Anderson Illustration Association, Inc Phase 1 – 500,000 sf – 192 beds Build out – 3 M sf - 1,200 beds Shands.
PSP Thermal stations. Thermal plant Electric power generation system block diagram Electric power generation system block diagram Steam station Major.
Kansas City International Airport Michael Glasker, P.E. George Butler Associates, Inc.
Thermal Energy Storage Thermal energy storage (TES) systems heat or cool a storage medium and then use that hot or cold medium for heat transfer at a later.
Campus Energy Use Intelligent Infrastructure for Energy Efficiency May 25, 2007 Peter Cooper Dept of Facilities, Manager of Sustainable Engineering and.
DISTRICT HEATING District heating is an infrastructure which allows heat generated in a centralized location to be distributed to residential homes and.
Chilled Water Plant Overview From Project Concept To Operation July 26, 2007.
Hilario J. Negrón (787) ext 3223 (787) Measuring Operational Efficiency.
Ross Parkman PE Ryan Wester PE Central Chiller Plant Experience Big Ten and Friends Mechanical and Energy Engineering Conference October 1, 2013.
Association of Energy Engineers Randy Haines, CEM, CLEP, CMVP Energy Manager, Jefferson April 20, 2016.
Green Labs Symposium | March 15, 2016 Travis Wanat, Senior project manager Department of Facilities Efficient building design and operation Fueling high.
Cogeneration at UC March 09, Welcome Central Utility Plant.
WAYNE STATE UNIVERSITY
Energy Savings Projects
UMCP Learning Objectives
FRESNO COUNTY WEST ANNEX JAIL
Presentation on Cogeneration and District Cooling Plant
Michigan Energy Summit | April 25, 2019
Presentation transcript:

Some Basic UVM Info 425 acres of maintained acreage.. Central Steam Plant Central Chilled Water Plant Back Up Boilers Research to Day Care Multi Campus, CRF, Morgan Horse Farm, Spear Street, Maple Research etc Over 5.7 Million Square Feet, 5.2 On Main Campus, Over 200 Buildings 70,000 Control Points On Johnson and Honeywell Systems Delta V Boiler Controls Some Software We Use In PPD. FAMIS, KRONOS, School Dude Utility, Tiscor, Code Blue,

Concrete Trench Box /Field Fabricated System

(3) 50,000 Gallon Oil Tanks

Pre-Engineered/Pre-Insulated System

 CHILLED WATER LOOP (HSRF):  More efficient chilled water generation/distribution  Reduction in HSRF Electric usage  Existing Chillers will provide both load shed and redundancy for medical school

Plant & Infrastructure Project Costs Simpson to Gutterson (Phase III) $ 1,800, MH N1 (103) to Harris w/ feeds to U-Heights $ 3,100, MH N6 to MH N3 (thru Davis Center Site) $ 3,200, MH N3 to MH N1 $ 1,587, Austin to Millis $ 325, Chiller Plant & Infrastructure: to BH, RTT & Old Mill/Lafayette $ 11,850, Chilled Water Infrastructure: Davis Site & Connection to Davis: $ 1,750, Votey to Perkins $ 400, Jeffords Steam & CHW; Loop to HSRF $ 3,800, N. Campus Steam and Chilled (Phase I) $ 2,200, Totals $ 30,000,000

RESULTS BETWEEN 2003 – 2010 THE CAMPUS GREW BY 500,000 SQFT FY 2003 Energy Cost ~ $10 Million FY 2008 Energy Cost ~ $15 Million FY 2010 Energy Cost ~ $14 Million FY 2010 Break Down (All buildings) Electric – $8.4M Natural Gas – $3.7M Water/Sewer – $1.6M Fuel Oil/Propane – $150K

–Lower life cycle costs –Operating cost reduction of about 30% –Allows optimum system configuration for the Central Heat Plant System –Reduction of peak electrical power –Substantially lower costs for the future –Less construction time for future buildings –Allows cooling of historical buildings –Lower emissions - better environment-regionally –Consolidated chemical treatment –Consolidated noise generating equipment Major Advantages of Centralized Cooling System

Steam and Chilled Water Vault

Cooling Tower Footings

Cooling Tower Structure

Some Piping Work

York Chiller

Computerized Control System