Development Requirement/Tools Brown Bag Luncheon Series Site Due Diligence Jarrod Likar and Tim McDonough.

Slides:



Advertisements
Similar presentations
Museum Presentation Intermuseum Conservation Association.
Advertisements

The three most important considerations for development of wind farms are: LAND with good to excellent wind resource CONTRACT to sell electricity produced.
Evaluating Standards for Site Certification Presented to: American Public Power Association Presented by: Robert M. Ady, President Ady International Company.
OCPS SCHOOL SITE SELECTION PROCESS
Omega & Associates Engineering Ltd. Chilliwack Providing professional services to our clients with quality, cost effective AND innovative engineering solutions.
CREW CAMP ENVIRONMENTAL REVIEW L. David Glatt, P.E. North Dakota Department of Health Environmental Health Section.
Capital Improvement Program City of Snoqualmie Public Works Department.
Wakulla County Sewer Project Eutaw Utilities Presentation April 7, 2011.
Call Before you dig Safe digging is no accident. Alberta Damage Prevention Council.
Wastewater Collection Options for Lakota Beach Area Sub-Basin Special Meeting June 27, 2001 John Bowman Lakehaven Utility District (253)
PROPOSITION 218 IMPACTS ON UTILITY USER FEES Case Study City of Dixon Sewer Rate Repeal of 2007.
Department of Public Works Public Hearing – FY 2015 – 2019 Recommended Capital Improvement Program Budget April 28, 2014.
Drainage Rights Dr. Matt Helmers Assistant Professor and Extension Agricultural Engineer Department of Agricultural and Biosystems Engineering Iowa State.
Facilities & Campus Planning North Pleasant Street Improvement Plan Faculty Senate – February 28, 2008.
Collection Systems for Community Wastewater Systems CAWPCA Spring Meeting April 26, 2013 Dave Prickett, PE.
Anne Arundel County Department of Public Works. OBJECTIVE MINIMIZE OR ELIMIINATE FLOODING FROM FREQUENT SMALL STORMS Storms of 1- to 2-year frequency.
January 30, 2014 Luke Lortie, EIT Jerry Auge, PE
 Prepared for  City of Palm Coast, Florida  April 28, 2015 Stormwater Detention Facilities for City-Wide Stormwater Management Master Plan.
Approved Due Diligence Scope Property Survey Topographic Survey Geotechnical Exploration Streams and Wetlands Threatened & Endangered Species Cultural.
February 9,2009 Rob Hartman Brent Remsberg. Development Process Due DiligenceEntitlements Infrastructure DesignConstruction.
Highways 5/16/99 Intersection Realignment. Project Team Lindsey Thomann- Project Manager Jessica Young- Project Engineer Erik Dolmseth- Project Engineer/Client.
1 Innovative Use of Administrative Order Authority Management, Operation and Maintenance (MOM) Program.
Engineering and Technical Plans Description, process and standards Dh 2005.
Rapid Assessment A quick evaluation of a disaster/emergency impacted area.
State Financing Programs for Brownfield Redevelopment.
2014 Budget Department Presentations Infrastructure Funding Options.
2015 Needs Assessment Our Strategy for Success Scott Torpie Washington State Office of Drinking Water.
Public Works Roads & Maintenance. Employees Supervisor- Perfecto “Perch” Valdez Assistant- Francisco Ruiz Coordinates: Community Detail Program (La Tuna)-
Nick Johnson, PE Senior Project Manager October 1, 2012.
Morphum Environmental Ltd Environmental Engineers and Consultants
New Stormwater Regulations “C.3” Provisions in effect Feb. 15, 2005.
Department of Public Works NPDES Low Impact Development and Green Streets Resolutions City Council August 17, 2015.
1 II. Sewer Networks and Facilities Topic. II. 12. Detention (Retention) Basins: Kinds and Structures. Sewerage Pumping Stations Detention Basins: Kinds.
Short and Long Range Water Supply Planning and Aquifer Performance Test (APT)
Stormwater… Problems & Solutions Jim Nash. A water resources commissioner Then… Unique to Michigan Initially cleared swamps and marshes Each township.
Lee County Electric Cooperative 2007 Hurricane Preparedness Activities.
TENTATIVE BUDGET PRESENTATION CITY COUNCIL PUBLIC HEARING SEPTEMBER 8, 2010.
April 21, 2015 Presented by: Heidi Springer, P.E. Brian Ginter, P.E.
STORM WATER STORAGE AND TREATMENT
1 1 City Commission Workshop for the DRAFT Basis of Design Report December 14, 2015 CRAVEN THOMPSON & ASSOCIATES, INC.
Infrastructure Update RV Travel Park expansion 13 sites exist today Plans developed by Army for 40 site expansion Expansion can be supported by existing.
Department of Public Works Approval of a Journal Voucher Amending Projects in the FY 2011 Capital Improvement Program Budget and Appropriate $125,000 in.
Department of Public Works Submittal of Comments to the County of Los Angeles on the Draft Environmental Impact Report and Proposed Alternatives for the.
Comprehensive Planning & Infrastructure Interdependence Public Services.
Jervis Inlet Resort & Spa INFRASTRUCTURE OVERVIEW.
MIAMI-DADE COUNTY REGULATORY AND ECONOMIC RESOURCE DEPT. DIVISION OF ENVIRONMENTAL RESOURCE MANAGEMENT (DERM) “THE PERMITTING PROCESS TO DISPOSE OF STORMWATER.
LPEA BAYFIELD SUBSTATION LA PLATA COUNTY LOCATION & EXTENT REVIEW March 12, 2015.
“State Road 100 MPC Lots” Comprehensive Plan Amendment & Rezoning City Council Public Hearing November 17, 2015.
DUVALL 2015 COMPREHENSIVE PLAN UPDATE and SURVEY RESULTS 9:00 – 10:30 AM Survey Results 30 minutes (Lara) Comprehensive Plan, Density and Capacity, and.
SMALL BUSINESS OPPORTUNITY FORUM Water Department 2015 Capital Program & 2016 Outlook.
Linford School Drainage Improvements 21 March 2016 City of Laramie.
City Council May 20, Streets Funding Options Options for funding: Street Maintenance Sales Tax = Approx. $2M/year Franchise/Right of Way Fees (State.
FY 2016 Water & Sewer Rates Presented by: The Department of Public Works Works.
Public Hearing – FY 2017 – 2021 Recommended Capital Improvement Program Budget April 25, 2016.
Operating Efficiencies Costs to operate and maintain the water and sewer system have not varied significantly during the first 5 years of operation.
Bancroft Elementary School School Building Committee Meeting February 24, 2010.
Conventional Facilities/Siting Jonathan Hunt Project X Machine Advisory Committee March 18-19, 2013.
Stormwater Management
2nd Street Drainage and Paving Improvements
Transportation Engineering Business Development Workshop Department M
Jefferson County SA Red Rocks Site Approval
Electricity is produced at the power station.
Distribution substations
Drainage Study Sections 30 & 34 for Development of City Wide Stormwater Management Master Plan Prepared for City of Palm Coast, Florida Prepared by March.
Land Use and Zoning Committee Special Workshop
Construction Management & Inspection
Pretreatment and Consent Orders - Helping to reach Compliance Randy Bradley, City Corporation Wastewater Operations Manager.
City of Janesville Wastewater Facility Plan Amendment Public Hearing
Montgomery County Municipal Utility District No. 8 January 4, 2019

Presentation transcript:

Development Requirement/Tools Brown Bag Luncheon Series Site Due Diligence Jarrod Likar and Tim McDonough

SITE SELECTION Terrain/Location Roads Drainage Water/Wastewater Private Utilities

TERRAIN/LOCATION Environmental Clearance Specific Area Plans Arroyos/LEE Lines

Environmental Site Assessment Defined by 3 Phases Phase 1 – Site and Document Review (Arch – Bio) Phase 2 – Site Investigation (Testing) Phase 3 – Remediation

Environmental Clearance

Specific Area Plan

Arroyos/LEE Lines

ROADS Survey the area Long Range Plan –MRCOG/MPO Adequate for intended use? –Volume / Size / Access Control Owner –City, County, NMDOT TIA (Traffic Impact Analysis)

Specific Area Plan

ROADS Survey the area Long Range Plan –MRCOG/MPO Adequate for intended use? –Volume / Size / Access Control Owner –City, County, NMDOT TIA (Traffic Impact Analysis)

TRAFFIC IMPACT ANALYSIS Always required by the City Estimates volumes and timing of new traffic Recommends improvements to meet traffic conditions –Signals, Additional lanes, Access limitations Based on existing projections and intended future use

DRAINAGE Historic vs. Developed On-Site vs. Off-Site A significant issue for most large sites Must allow off-site flows through site Often limited to Historic Flows Based on 100 year event (1%)

DRAINAGE Storm Sewers?? Arroyos?? –COE 404 Permit –CLOMR/LOMR On-Site Ponding/Regional –Detention / Retention Percolation/Evaporation/Transpiration

DRAINAGE Watershed Management Plans Facility Plans Drainage Management Plans Individual Grading and Drainage Plans

WATERSHED MANAGEMENT PLANS Venada WMP Montoyas WMP –Lomitas Negras WMP La Barranca WMP Black WMP Calabacillas WMP (Pending)

FACILITY PLANS

DRAINAGE MANAGEMENT PLAN

INDIVIDUAL GRADING AND DRAINAGE PLAN

WATER Flow / Pressure /Volume –Flow – Pipe Size –Pressure – Elevation –Volume – Storage/Production Fire Protection Statement of W & WW Availability –Hydraulic model Off-Site Improvements

WASTEWATER Collection & Treatment –Collection – Pipe Size –Treatment – Capacity of Treatment Facility Pretreatment Requirements Off-site Improvements

ELECTRICITY - PNM Where is access? –Transmission / Distribution Requirements –Voltage / Phase / KVA Required Upgrades –Transformers / Substation –Offsite access & Easements All Distribution Lines Underground

NATURAL GAS - NMGCo Where is access? –Transmission / Distribution Requirements –Volume Required Upgrades –Pressure Reducing Station –Offsite access & Easements

COMMUNICATIONS QWEST – CABLE ONE Where is access? Requirements Required Upgrades Options

REQUEST A DESIGN REVIEW COMMITTEE MEETING All Departments / Utilities are represented Ask Specific Questions