Development Requirement/Tools Brown Bag Luncheon Series Site Due Diligence Jarrod Likar and Tim McDonough
SITE SELECTION Terrain/Location Roads Drainage Water/Wastewater Private Utilities
TERRAIN/LOCATION Environmental Clearance Specific Area Plans Arroyos/LEE Lines
Environmental Site Assessment Defined by 3 Phases Phase 1 – Site and Document Review (Arch – Bio) Phase 2 – Site Investigation (Testing) Phase 3 – Remediation
Environmental Clearance
Specific Area Plan
Arroyos/LEE Lines
ROADS Survey the area Long Range Plan –MRCOG/MPO Adequate for intended use? –Volume / Size / Access Control Owner –City, County, NMDOT TIA (Traffic Impact Analysis)
Specific Area Plan
ROADS Survey the area Long Range Plan –MRCOG/MPO Adequate for intended use? –Volume / Size / Access Control Owner –City, County, NMDOT TIA (Traffic Impact Analysis)
TRAFFIC IMPACT ANALYSIS Always required by the City Estimates volumes and timing of new traffic Recommends improvements to meet traffic conditions –Signals, Additional lanes, Access limitations Based on existing projections and intended future use
DRAINAGE Historic vs. Developed On-Site vs. Off-Site A significant issue for most large sites Must allow off-site flows through site Often limited to Historic Flows Based on 100 year event (1%)
DRAINAGE Storm Sewers?? Arroyos?? –COE 404 Permit –CLOMR/LOMR On-Site Ponding/Regional –Detention / Retention Percolation/Evaporation/Transpiration
DRAINAGE Watershed Management Plans Facility Plans Drainage Management Plans Individual Grading and Drainage Plans
WATERSHED MANAGEMENT PLANS Venada WMP Montoyas WMP –Lomitas Negras WMP La Barranca WMP Black WMP Calabacillas WMP (Pending)
FACILITY PLANS
DRAINAGE MANAGEMENT PLAN
INDIVIDUAL GRADING AND DRAINAGE PLAN
WATER Flow / Pressure /Volume –Flow – Pipe Size –Pressure – Elevation –Volume – Storage/Production Fire Protection Statement of W & WW Availability –Hydraulic model Off-Site Improvements
WASTEWATER Collection & Treatment –Collection – Pipe Size –Treatment – Capacity of Treatment Facility Pretreatment Requirements Off-site Improvements
ELECTRICITY - PNM Where is access? –Transmission / Distribution Requirements –Voltage / Phase / KVA Required Upgrades –Transformers / Substation –Offsite access & Easements All Distribution Lines Underground
NATURAL GAS - NMGCo Where is access? –Transmission / Distribution Requirements –Volume Required Upgrades –Pressure Reducing Station –Offsite access & Easements
COMMUNICATIONS QWEST – CABLE ONE Where is access? Requirements Required Upgrades Options
REQUEST A DESIGN REVIEW COMMITTEE MEETING All Departments / Utilities are represented Ask Specific Questions