WAAS Test Program Overview & In-service Monitoring Tom McHugh, ATO-P (ACB-430) DOT/FAA W.J.H. Technical Center WAAS Technical Director

Slides:



Advertisements
Similar presentations
Agenda Item 6 GNSS Operations Ross Bowie, NAV CANADA Rapporteur, Operational WG Navigation Systems Panel Thank you… Good morning… I am ... and member.
Advertisements

SYSTEM-WIDE PROCESS CONTROLS UPGRADE Detroit Water & Sewerage Department.
4 th AOR W/S on GNSS Kuala Lumpur, Malaysia Dec. 8-10, 2012 Multi-GNSS Augmentation by L1-SAIF Signal: Preliminary Results Multi-GNSS Augmentation by L1-SAIF.
Wide Area Augmentation System (WAAS)
Chapter 19: Network Management Business Data Communications, 5e.
The leading pioneer in GPS technology The StarFire Global Satellite Based Augmentation System Ron Hatch NavCom Technology, Inc.
Presented to: By: Date: Federal Aviation Administration WAAS NOTAM SYSTEM UPDATE SBAS Workshop Gary Bobik, NOTAM procedures June 22, 2005.
Aviation Benefits of GNSS Augmentation Workshop on "GNSS Applications for Human Benefit and Development“ Prague, Czech Republic September 2010 Jeffrey.
Chapter 19: Network Management Business Data Communications, 4e.
GLOBAL POSITIONING SYSTEM FOR ENVIRONMENTAL MANAGEMENT.
1 ITC242 – Introduction to Data Communications Week 12 Topic 18 Chapter 19 Network Management.
Workshop EGNOS KRAKÓW GNSS RECEIVER TESTING TECHNIQUES IN A LABORATORY ENVIRONMENT Institute of Radar Technology Military University of Technology.
Antenna Baseline Measurement System 29 January 2010 Mark Phillips, Research Assistant Ohio University, Athens OH Research Intern Naval Research Laboratory.
Absolute Receiver Autonomous Integrity Monitoring (ARAIM)
Wide Area Augmentation System (WAAS) E. Douglas Aguilar CAPT, USAF.
Introduction to Software Testing
Patrick Caldwell Chris Kellar. Overview  Basic Concepts  History  Structure  Applications  Communication  Typical Sources of Error.
Satellite-Based Augmentation Systems (SBAS) Combined Performance
Aviation Considerations for Multi-Constellation GNSS Leo Eldredge, GNSS Group Federal Aviation Administration (FAA) December 2008 Federal Aviation Administration.
Aviation Benefits of GNSS Augmentation Workshop on the Applications of GNSS Chisinau, Moldova May 2010 Jeffrey Auerbach Advisor on GNSS Affairs Office.
A Recipe for Success in Implementing CBTC on an Operating Transit System Presented by: Dr. Alan F. Rumsey, P.Eng, FIRSE March 12, 2014 Communications-Based.
Software Testing Verification and validation planning Software inspections Software Inspection vs. Testing Automated static analysis Cleanroom software.
RECOMP Avionics Communication Modem Peter de Waard and Peter Gillick Thales UK Research and Technology.
SVY 207: Lecture 4 GPS Description and Signal Structure
Semantic Knowledge Bases and Be Informed for the FAA Dr. Brand Niemann Director and Senior Enterprise Architect – Data Scientist Semantic Community
Standard WBS Version 1.0 WBS2-3.pptPage 1 Standard Work Breakdown Structure Legend = Decomposes to lower level WBS elements 4.0 Implementation 4.0 Implementation.
1 Reconfigurable Environment For Analysis and Test of Software Systems (REATSS) Dan McCaugherty /19/2004.
Reliability Andy Jensen Sandy Cabadas.  Understanding Reliability and its issues can help one solve them in relatable areas of computing Thesis.
Presented to: SBAS Technical Interoperability Working Group Date: 21 June 2005 Federal Aviation Administration Certification of the Wide Area Augmentation.
Consulting and Technology Technical Excellence. Pragmatic Solutions. Proven Delivery Dr. Frank Zimmermann November 2006 The Galileo System - Predicting.
India GAGAN – Adoption within Asia Pacific Region Plan/Opportunities.
Page 1 SQM: SBAS Workshop ZETA ASSOCIATES 21 June 2005.
GNSS Receiver - Software Radio Concept František Vejražka Czech Technical University in Prague Faculty of Electrical Engineering.
FAA GNSS Evolutionary Architecture Study
10/7/ Innovative Solutions International Satellite Navigation Division ION NTM 01 Capabilities of the WAAS and EGNOS For Time Transfer SBAS, an Alternate.
High Accuracy Nationwide Differential Global Positioning System (HA-NDGPS) UPDATE Jim Arnold September, 2009.
Satellite Navigation Program Federal Aviation Administration.
Space Engineering 2 © Dr. X Wu, Space Engineering 2 Lecture 1.
Common Questions - Global Positioning System Devices
FAA Satellite Navigation – Status Briefing 1 Federal Aviation Administration January 5, 2007.
IS-GNSS 2014 Jeju, South Korea Oct. 22, 2014 MSAS Status Takeyasu Sakai Electronic Navigation Research Institute, Japan Takeyasu Sakai Electronic Navigation.
NAVSTAR GPS Mike Mickelson KD8DZ 08 Dec GPS BASICS.
Ionospheric Integrity Lessons from the WIPP Todd Walter Stanford University Todd Walter Stanford University
Present and Future of China Satellite-Based Augmentation System China Satellite Navigation Office February 2014.
DRAFT WAAS Integrity Resolution Process Pat Reddan 22 June 2005 ZETA ASSOCIATES.
11 CLUSTERING AND AVAILABILITY Chapter 11. Chapter 11: CLUSTERING AND AVAILABILITY2 OVERVIEW  Describe the clustering capabilities of Microsoft Windows.
The Wide Area Augmentation System (WAAS) Todd Walter Stanford University Todd Walter Stanford University
Network design Topic 6 Testing and documentation.
The Global Positioning System. Early Satellite Systems Satellite Surveying started more than 30 years ago. Now, High accuracy could be achieved in real.
Space-Based Navigation Systems
F E D E R A L A V I A T I O N A D M I N I S T R A T I O N A I R T R A F F I C O R G A N I Z A T I O N 1 FAA Satellite Navigation Program Update Dan Salvano.
Purpose: The purpose of CMM Integration is to provide guidance for improving your organization’s processes and your ability to manage the development,
1 Overview of Maintenance CPRE 416-Software Evolution and Maintenance-Lecture 3.
Satellite Navigation Program
DeSIRE Workshop, Pisa, 25-26/11/2002 1/7 A Case Study in Air Traffic Control Alberto Pasquini Deep Blue Srl.
Remote integrity monitoring of DGPS by use of AIS infrastructure
Briefer: John Charles Angermayer Briefer: John Charles AngermayerESC/GA Electronic Systems Center Hanscom AFB, MA Date: 5 Oct 2004 Date: 5 Oct 2004 Briefer:
Using Data Collection Tools in Flight Training Kris Rockwell Hybrid Learning Systems AICC Phoenix February, 2004.
SwCDR (Peer) Review 1 UCB MAVEN Particles and Fields Flight Software Critical Design Review Peter R. Harvey.
PRESENTATION SATRACK DIPTI ON SUBMITTED BY : EC (3) BBDESGI
PBN Performance Based Navigation
Chapter 19: Network Management
GPS - Global Positioning System
Agenda Item 6 GNSS Development Status and Future Work Eric Chatre, EC/ESA Rapporteur Technical WG, GNSS Panel Thank you… Good morning… I am ... and.
EUROPEAN COMMISSION Satellite-Based Augmentation Systems (SBAS) Combined Performance International Committee on GNSS (ICG-4) Working Group A Saint Petersburg,
Introduction to Software Testing
The Status of Dual-Frequency Multi-Constellation SBAS Trial by Japan
Standards.
OU BATTLECARD: WebLogic Server 12c
Presentation transcript:

WAAS Test Program Overview & In-service Monitoring Tom McHugh, ATO-P (ACB-430) DOT/FAA W.J.H. Technical Center WAAS Technical Director (609)

Test Program Structure WAAS Test Program –Contractor Testing Design Qualification Production Acceptance Analysis & Simulation –FAA Testing Operational Test & Evaluation Shakedown Testing –Testing of Upgrades In-service Monitoring –Performance Evaluation –WIPP Off-line Monitoring –Anomaly Detection & Resolution

Test Challenges The WAAS test program was structured on historic FAA processes used for developing and fielding new systems –Some of those processes are not applicable outside of the FAA Those processes required tailoring because they were not designed for SBASs SBASs have unique features that require innovation in the test program –Integrity performance numbers that cannot be proven by test or demonstration –Performance is a function of the constellation and the ionosphere which are outside the control of the SBAS –SBASs are single systems with geographically distributed components The navigation service in the immediate vicinity of the component is not directly tied to that component –Difficult (nearly impossible) to make corrections to the DO-229 –Access to GEOs SBASs are new –The FAA was still learning how to build and test WAAS while we were doing it –How SBASs work is generally not well understood by all stakeholders

System Test and Monitoring Facilities WAAS reference stations (WRS) IP multicast their data onto the WAAS network Real time one-way access to that data is provided to: –The WAAS prime contractor's facility in Fullerton CA –The FAA Technical Center in Atlantic City NJ FAATC also forwards the measurement data to NOAA/NGS for incorporation into the CORS network –The Mike Monroney Aeronautical Center in OKC Access to the real time measurement data allows WAAS master station equipment in the prime contractor's facility to function as if it were operational –WAAS Shadow System –Extensively used for system level testing –Currently WAAS has 5 shadow systems in the Fullerton facility Independent measurement data from the FAA National Satellite Test Bed is also fed from FAATC to the Raytheon facility in Fullerton CA

Contractor Testing Contractor testing –Hardware Subsystem –Factory acceptance –Site acceptance COTS –OEM vendor data and testing –Software FAA required processes (FAA-STD-026) RTCA DO-178B –System Algorithm validation and tuning Comparison runs Build verification testing System integration and stability testing Design qualification tests –60 Day Stability & Performance Test Regression tests Service volume modeling Safety analyses Reliability analyses

Test Capabilities / Tools All measurement data is always recorded Simulations can be generated from that recorded data –Modified or un-modified –Test Support Software (TSS) used for unit and configuration item level software testing Sim C&V –Off-line version of WAAS corrections and verification subsystem master station software Much quicker than real time –Created from the operational software code using compile time switches –Can repeatedly test WAAS performance on any recorded data set Algorithm implementation validation Anomaly resolution Regression testing Traceability maintained in a DORS database

Service Volume Modeling (SVM) Tools MITRE SVM Stanford University SVM Raytheon SVM Volpe Service Prediction NOTAMS Tool FAATC Coverage and Airport Availability Tools Raytheon Service Monitoring System (SMS)

Upgrade Testing Scope of testing is dependent on the nature of the upgrade –Standard testing DO-178B objective satisfaction Requirements change verification Shadow system stability testing Build validation testing Cutover testing –Unique testing Algorithm validation HMI analysis Comparison run tests Integration and checkout of new hardware

FAA Testing (in support of IOC) Operational Test and Evaluation –Flight testing 8 locations spread over the LPV service area 40 approaches per location –Static testing Simulate aircraft at each of the WAAS and NSTB reference stations by applying the WAAS corrections to the receiver measurements 24/7 1 Hz for the entire 60 day test –FAATC has been monitoring WAAS performance 24/7 since November 1998 –Degraded operations simulated major system failures Shakedown Testing –Demonstrates that the operators and maintainers were sufficiently proficient to operate the system

FAA In-service Monitoring (continuous and upgrades) Three types of in-service monitoring –WAAS PAN Report (Quarterly) WAAS user service performance Availability and coverage Accuracy Outages Anomaly reporting –GPS PAN Report (Quarterly) Civilian GPS performance –WIPP off-line monitoring Broadcast ephemeris accuracy statistics Antenna multipath environment Signal Quality Monitoring (SQM) Periodic antenna position survey updates GPS failure rate statistics