IASPEI 2009 The Comprehensive Nuclear-Test-Ban Treaty Development of the Seismic Networks of the International Monitoring System Lassina Zerbo Director,

Slides:



Advertisements
Similar presentations
International Data Centre Preparatory Commission for the Comprehensive Nuclear-Test-Ban Treaty Organization 1 Processing of the new Infrasound Arrays on.
Advertisements

Monitoring for managing Mediterranean Marine Protected Areas MedPAN network regional experience-sharing workshop Monitoring for managing Mediterranean.
1 NGA Regional Bio-Terrorism Conference Boston, Massachusetts January 12-13, 2004.
10 th COP / 26 th MOP; Paris, France; November, th ORM Meeting Report & Recommendations Report from the 9 th Meeting of the Ozone Research.
November 2012 Istanbul, Turkey C. Neagoe, L.M. Manea and C. Ionescu National Institute for Earth Physics, Magurele-Ilfov, Romania.
Rethinking Array Seismology in Nuclear-Test-Ban Treaty Monitoring Steven J. Gibbons Workshop on Arrays in Global Seismology, Raleigh, North Carolina, May.
19 February 2008 IDC/SQT/STPage 1 Building Capacity to Sustain a Geophysical Monitoring Network Presented at: IRIS/NSF Out of Africa Workshop Boston, MA,
Emergency Management Working Group January
Continuity of Operations Planning COOP Overview for Leadership (Date)
Navigating the New NICET Certification Model
Office of Health Care Access (OHCA) Outpatient Surgery Data Reporting Webinar Olga Armah Christopher Wyvill Srini Chalikonda Omar Lyn 5/11/2015.
Bob Woodward, Bob Busby, Katrin Hafner, and David Simpson
THE ZAMBIAN SEISMIC NETWORK 2009 IRIS/ORFEUS METADATA WORKSHOP BEING HELD IN NOVEMBER IN CAIRO, EGYPT FROM 8-17 NOVEMBER 2009 By A Mulowezi.
Aristotelis Botzios-Valaskakis MSc Mechanical Engineer Division of Development Programmes Building Energy Performance Reliable Predictions ESCO’s point.
11 the best Customer satisfaction enhancement plan N. Jerry Simonoff Director, IT Investment & Enterprise Solutions CIO-CAO.
| 1 Guido de Wilt DG TREN D4 EUROPEAN POLICY REGARDING MICRO-CHP EUROPEAN COMMISSION.
1/10Worshop Applied Antineutrino Physics, APC Lab, Dec International Monitoring of Nuclear Test Technologies In Use Legal basis of the international.
1 THE THIRD ENERGY PACKAGE – THE ENERGY COMMUNITY APPROACH Energy Community Secretariat 20 th Forum of the Croatian Energy Association and WEC National.
1 Mr. Makane Faye Officer-in-charge ICT Policy & Development Section and E-Application Section ICTs, Science & Technology Division United Nations Economic.
08 October 2015 M. Ammar Mehdi Introduction to Human Resource Management & SSG-16 Actions 4 th Steering Committee on Competence of Human.
8-13 January 2012, Bangkok, Thailand Institute of Seismology, National Academy of Sciences, Kyrgyz Republic.
The Australian National Seismic Network (ANSN)
Infrasound Workshop De Bilt, Netherlands October 2002 Infrasound Processing at the IDC and its Near-term Development Petr Firbas International Data.
D McCormack, CTBT Infvrasound, KNMI Netherlands 29 October 2002 Towards Characterization of Infrasound Signals David A McCormack CTBT Verification Office.
The Vienna Convention Trust Fund for The Vienna Convention Trust Fund for Research and Systematic Observation (UNEP/OzL/Conv.ResMgr/9/2)
RESPONSIBLE PERSON TRAINING. Review of § Emergency Evacuations.
From the Installation and Certification Group to the Engineering and Development Section Patrick Grenard Chief, Engineering & Development, IMS Vienna International.
Managing Waveform Data and Related Metadata for Seismic Networks OBSERVATIONAL NETWORK OF THE KAZAKHSTAN NATIONAL NUCLEAR CENTER (KAZNET) 8-13 January.
November 2008Infrasound Technology Workshop, BermudaPage 1 Presented to: Infrasound Technology Workshop Bermuda PTS Portable Infrasound Array John Coyne,
Infrasound Workshop De Bilt, Netherlands October 2002 Current Status of Infrasound Processing at the IDC Nicolas Brachet International Data Centre/Waveform.
ITW2008: P. Campus, R. Oldfield Bermuda, 3-7 November 2008 The recently installed IMS Infrasound Station IS51, Bermuda Paola Campus Comprehensive Nuclear-Test-Ban.
ITW2007: P. Campus Tokyo, November 2007 The IMS Infrasound Network: detection of a large variety of events, including volcanic eruptions Dr. Paola.
Institute of Geophysical Research of the National Nuclear Center of RK Kazakhstan National monitoring system of nuclear explosions and earthquakes Mikhailova.
BNL Tier 1 Service Planning & Monitoring Bruce G. Gibbard GDB 5-6 August 2006.
Tsunami warning agreements with the CTBTO Presented at the Eighth meeting of the Working Group on Tsunamis and Other Hazards Related to Sea-Level Warning.
1 Research and systematic observation Introductory presentation by the UNFCCC secretariat Olga Pilifosova Workshop on the preparation of fourth national.
Problems Faced at some Field Installations at the IMS Infrasound Stations Infrasound Workshop – Tokyo – November 2007 Stefi Stefanova Installation and.
WorkSource Tracking System (WTS) Gathering statistics on flow volume and the universal service activities of WorkSource customers. November 2002.
CISN: Draft Plans for Funding Sources: OES/FEMA/ANSS/Others CISN-PMG Sacramento 10/19/2004.
Infrasound Workshop San Diego, USA October 2003 Infrasound Processing at the IDC and its Near-term Development P. Firbas, N. Brachet International.
Statistics related to the Excessive Deficit Procedure (EDP) - Main facts and recent relevant events Luca Ascoli Head of Unit C3 Public Finance.
STATUS of the International Data Center and International Monitoring System Network of the PTS Florian Haslinger IMS Seismic Monitoring Section Preparatory.
Project Management Birutė Markevičiūtė Joint Technical Secretariat Lead Partner Seminar 13 October 2008, Riga.
Comprehensive Planning Grant Program Status Update Laura Arbuckle, Administrator Division of Intergovernmental Relations Wisconsin Towns Association December.
Welcome back HA03 - IMS Hydroacoustic station installation Robinson Crusoe Island, Juan Fernadez Archipelago, Chile, March 2014 Georgios Haralabus, Jerry.
DESCRIPTION OF THE MONITORING AND EVALUATION SYSTEM IN POLAND Action Plan and the Two-year NRN Operational Plans.
Islamic Republic of Iran Country Report of the Islamic Republic of Iran STATISTICAL CENTRE OF IRAN By: Dr. Adel Azar Head, Statistical Centre of Iran
Information Security Measures Confidentiality IntegrityAccessibility Information cannot be available or disclosed to unauthorized persons, entities or.
Update on the NADP Atmospheric Mercury Initiative Developing a new coordinated and collaborative approach to atmospheric mercury monitoring A Briefing.
Infrasound Technology Workshop Bermuda, 2008 Enhancements to the CTBTO operational automatic infrasound processing system David Brown, Nicolas Brachet,
Creating Dynamic Value: Program Marketing and Two-Tiered Solicitation and Selection TRB Representatives / Annual RAC Meeting July 22-26, 2012.
November 2007Infrasound Technology Workshop, Tokyo, JapanPage 1 Presented to: Infrasound Technology Workshop Tokyo, Japan PTS Experimental Infrasound Array.
Update on the Richland Creek Reservoir and Water Supply Program Paulding County, Georgia Board of Commissioners Workshop Briefing October 13, 2015.
SwCDR (Peer) Review 1 UCB MAVEN Particles and Fields Flight Software Critical Design Review Peter R. Harvey.
Information Security tools for records managers Frank Rankin.
Station Operator support for a GCI VSAT link Efren Abaya Head GCI &Networks Operations Unit Operations Section, IDC Division Preparatory Commission for.
Neeraj Kumar Negi Senior Evaluation Officer GEF Independent Evaluation Office March 11 th 2015 Performance Measurement in GEF.
International Data Centre October 2015Page 1 Progressive Commissioning Jerry Carter, Senior Scientist W. Randy Bell, Director Gerhard Graham, Coordinator.
Capacity Building in: GEO Strategic Plan 2016 – 2025 and Work Programme 2016 Andiswa Mlisa GEO Secretariat Workshop on Capacity Building and Developing.
Base Maintenance Contract (BMC) Industry Day Participants
MR. BruCE MUTEGI SEISMOLOGIST Mr. Daniel Mutua ICT Technologist
The International Monitoring System:
In Young Suh Division of Nuclear Security
The Nuclear Test Ban: Technical Opportunities for the Trump Administration Stephen Herzog, Yale University United States Strategic.
SCHS and Health Statistics
Report from the 9th Meeting of the Ozone Research Managers of the Parties to the Vienna Convention for the Protection of the Ozone Layer Michael J. Kurylo.
Washington and the Test-Ban:
Regional WIGOS Centre Tokyo
WIGOS regulatory and guidance material
The WIGOS Pre-Operational Phase
Presentation transcript:

IASPEI 2009 The Comprehensive Nuclear-Test-Ban Treaty Development of the Seismic Networks of the International Monitoring System Lassina Zerbo Director, International Data Centre Preparatory Commission for the Comprehensive Nuclear-Test-Ban Treaty Organisation Provisional Technical Secretariat Vienna International Centre P.O. Box 1200 A-1400 ViennaIASPEI Cape Town, South Africa AUSTRIA 11 January 2009

IASPEI 2009 IMS Seismic Networks 50 primary stations sending data to Vienna in real time, continuous mode 30 array stations 19 3-C stations 1 to be determined 120 auxiliary stations ready to respond to requests from IDC to help characterize the detected event 7 array stations C stations 1 to be determined

IASPEI 2009

New low seismic noise model Processes Site surveys Site preparation Installation Certification Post-certification Activities

IASPEI 2009 Seismic Noise at PS26 Torodi, Niger

IASPEI 2009 PS26 Torodi, Niger

IASPEI 2009 International Monitoring System Division The IMS equipment (GCI Communication topologies) IMS station IDC Vienna NDC IMS station IDC Vienna NDC BASIC Topology INDEPENDENT Topology NDC fully controls data flow to IDC

IASPEI 2009 Page 8 Primary Seismic Network

IASPEI 2009 Page 9 Auxiliary Seismic Network

IASPEI 2009 Page 10 Hydroacoustic Network

IASPEI 2009 Page 11 Infrasound Network

IASPEI 2009 IMS Seismic and Hydro Networks 98% of data availability 11 hydroacoustic stations 6 hydrophone stations 5 T-phase stations (essentially seismic sensors) 97% timely data availability Calibrated stations Standardized stations

CTBT on Funding of Operation and Maintenance Article IV (Verification) of the Treaty: 19.For facilities … in Tables 1-A, 2-A, 3 and 4 of Annex 1 to the Protocol [ie Primary stations], … the Organization.. shall meet the costs of: (b)Operating and maintaining International Monitoring System facilities… (c) Transmitting International Monitoring System data 20.For auxiliary network seismic stations.. the Organization,.. shall meet the costs only of: (a)Transmitting data..; (b)Authenticating data …; (c)Upgrading stations to the required technical standard…; (d)If necessary, establishing new stations

AUTOMATION SUPPORT MAINT LOGISTIC INFRASTRUTURE OFFICE NDC STATION IDC SOH Monitoring Tracking OPERATIONS ENGINEERING International Monitoring System ENGINEERING GROUP INSTALLATION CERTIFICATION GROUP GCI OPERATION CENTER MONITORING FACILITIES OPERATIONS UNIT NETWORK & SYSTEM OPERATIONS UNIT AUTOMATION & INFORMATION Operational Concept

IMS Operational Requirements Levels of Operations Entry-into-Force (EIF) Provisional Operations Enhanced Operations (System-Wide Performance Test) EIF annual availability requirements Primary waveform stations: 97% timely data availability 98% overall data availability Radionuclide stations: 95% data availability Auxiliary seismic stations: 90% data availability Communication link availability specification of contract 99.5% Int. Cooperation Workshop, Abuja November - 1 December %

IMS Provisional Operations Verification System is in Provisional Operations Scope and period defined by Commission (CTBT/PC-19/1/Annex II P12-19): - Provisional Operations does not provide for verification - Protect the investment; efficient and effective utilization - Allow build up, testing and evaluation - ‘Best Effort’ within available resources e.g. normal working hours - Provide for Performance Testing in cooperation with station operators and NDCs. - The Provisional Operations Status is linked to the Current Status of the CTBT…… November - 1 December 2006

May 2008 IDC/SA/SIPage 17 Network processing in context

Provisional Technical Secretariat Page 18 Map of all the events included in the IDC REBs since February 2000 around the Korean peninsula 9 Oct 2006 event 16 Apr 2002 event 9 Oct 2006 event (presumed explosion) 16 Apr 2002 event (presumed earthquake)

Provisional Technical Secretariat Page 19 Summary on IDC Secure Website

Provisional Technical Secretariat Page 20 Seismic signals recorded in South Korea (KSRS) for 9 Oct 2006 event (left) and 16 Apr 2002 event (right) 9 October April 2002 (presumed earthquake) More explosion-like More earthquake-like -But in general, discrimination of (especially small) explosions from earthquakes is a complex task.

Provisional Technical Secretariat Page 21 Animated motion of the emitted gas from 9 to 30 October 2006 (0-30m altitude) Thank you