The New Building Standards System Completion certificates.

Slides:



Advertisements
Similar presentations
AUDITS 29 th November 2011 Marriott Hotel, Leeds Presentation by Robert Jopling BEng, CEng, MICE Member of Scottish Registration Board.
Advertisements

Avoiding Common Errors with Corporate Registries Filings ► Common Errors To Avoid With All Documents; ► Specific Errors By Document Type; and ► Search.
Australian Building Codes Board Disability (Access to Premises – Buildings) Standards 2010 Awareness Seminars.
Incorporation of Co Operative Societies
Subcontractors بسم الله الرحمن الرحيم Islamic university in Gaza Collage of Engineering Postgraduate program Construction Management Prepared by: Eng.
Changes in Planning Law Relating to Retention Planning Permission
Loan/Grant Administration. Types of Financing Highly concessional Hardened terms Intermediate terms Ordinary terms.
Conversation on the Chemical Facility Anti-Terrorism Standards (CFATS) and Critical Infrastructure Protection Chemical-Terrorism Vulnerability Information.
LEGISLATION OVERVIEW & PROCEDURES Douglas Walker Chairman Scottish Registration Board Structural Engineers Registration Ltd.
OVERSIGHT & COMPLIANCE BRANCH (OCB) INVOICE PAYMENTS February 16,
Recap Share (Definition) Classes of Shares – Ordinary Shares – Preference Shares – Redeemable Preference Shares Share Capital – Nominal or Authorized Capital.
ISLAMIC UNIVERSITY OF GAZA FACULTY OF ENGINEERING CIVIL ENGINEERING DEPARTMENT 20. Claim, Disputes and Arbitration [Construction Contract Administration]
WORK HEALTH AND SAFETY ACT IMPLICATIONS FOR SMALL BUSINESS
LEGISLATION OVERVIEW & PROCEDURES Douglas Walker Chairman Scottish Registration Board Structural Engineers Registration Ltd.
UWE Planning Enforcement Conference 29 February 2012 Polly Reynolds, Associate Lawyers & Parliamentary Agents.
Regulation 16B As referenced in Approved Document B 2006.
SELECT Scheme Provider Certification of Construction (Electrical Installations to BS 7671)
About ACE Purpose of ACE ACE exists to represent its members’ interests to clients, both government and private sector, and stakeholder organisations,
PLANNING COMMITTEE TRAINING REASONS FOR DECISIONS & CONDITIONS 15 DECEMBER 2011.
Sustainable Development & Planning Controls. Control: Planning Service The first Planning Act was in The main principles of that Act are now contained.
Form NYIMG0039 (Rev. 11/11/10). Regulation 194: Producer Compensation Transparency New rule imposes mandatory compensation disclosure requirements on.
APPRAISAL OF THE HEADTEACHER GOVERNORS’ BRIEFING
SHEPPARD ROBSON IN-HOUSE TRAINING TECHNICAL SEMINAR The Construction (Design & Management) Regulations CDM.
Health and Safety Executive Health and Safety Executive Construction (Design and Management) Regulations 2007 July 2010.
Part of the BRE Trust Approved Certifiers of Design: Section 6 (Energy) BRE Scotland.
NEBOSH LEVEL 6 NATIONAL DIPLOMA MODULE A: MANAGEMENT OF HS LESSON 9 : CRIMINAL LAW Part One: HASAWA 1974.
1 Exemption Procedure for Non-compliances at Aerodromes Module - 8 AERODROME CERTIFICATION COURSE October 15Module -8.
CPSC Testing and Certification Requirements Applicable to Consumer Fireworks Presented by the American Fireworks Standards Laboratory February 18, 2010.
Lecture 4. OUTCOMES What must the equity plan include?. What must affirmative action measures include? Which factors are taken into account in determining.
ISO / IEC : 2012 Conformity assessment – Requirements for the operation of various types of bodies performing inspection.
Welcome Revisions of Chapter WAC Sections -035 and -036 Rule advisory committee workshop #5 Lacey, WA October 28, 2009.
General Condition THE EMPLOYER Construction Law Supervised By : Dr. Kamalain Shaath Prepared By : Eng. Fawzy El.farra.
Code Officials and the Code Process.  To design the interior of the building in conjunction with codes, standards and federal regulations required in.
Round up of other planning news Graham Withers, Development Management “If anyone comes to me with an idea for new planning legislation I am going to shoot.
The new VicSmart process and provisions. What is VicSmart? VicSmart is a fast planning permit process A decision is expected to be made in 10 days All.
Main Requirements on Different Stages of the Licensing Process for New Nuclear Facilities Module 4.5/1 Design Geoff Vaughan University of Central Lancashire,
7 Plant, Materials and Workmanship. 7.1Manner of Execution The Contractor shall carry out the manufacture of Plant, the production and manufacture of.
ENVIRONMENTAL PERMITTING 1 Environmental Law. Environmental Permitting 2 Environmental Permitting (England and Wales) Regulations 2007 introduced a new.
Why do I Have Miners’ Rights? 4 The Act gives miners and their representatives many rights because Congress wanted to encourage them to take an active,
APPRAISAL OF THE HEADTEACHER GOVERNORS’ BRIEFING.
Industrial Employment (Standing Orders) Act,1946 The Labour Investigation Committee, in its Report, at p. 113 (1946) had observed "An industrial worker.
Conditions Of Contract For Construction Conditions Of Contract For Construction Presented BY : Arch. INA’AM J. El TAWIL FIDIC 1999Conditions of Contract.
RULES GOVERNING PRIVATE MEMBERS’ LEGISLATIVE PROPOSALS Presentation by NA Table to Committee on Private Members’ Legislative Proposals and Special Petitions.
Detention and Questioning under PACE When a suspect is arrested the basic procedure is that they should be taken as soon as practicable to a designated*
Bath and North East Somerset Council Planning Enforcement Training Olwen Dutton Partner, Bevan Brittan.
Angela Beazer Solicitor TCs AND STCs: ASSESSING WHAT MAY BE “CONTRARY TO THE INTERESTS OF AVIATION SAFETY”
CABLING SYSTEM WARRANTY REGISTRATION. PURPOSE OF CABLING REGISTRATION.
ENGINEER Engineer Duties: Carry out the duties assigned in the contract.Carry out the duties assigned in the contract. Engineer's staff shall include qualified.
Code Officials and the Code Process.  Concentrates on the code process as a whole.  Different type of code officials  Various steps that are taken.
Managing Fire Safety In Common Parts of Flats and Mixed Use Buildings Simon Gibbins Merseyside Fire and Rescue Service.
Change Orders, Extras and Claims Presented by Geoffrey Cantello, City of Ottawa.
Animal Raising Claims in the Labeling of Meat and Poultry Products October 14, 2008 United States Department of Agriculture Food Safety and Inspection.
Building Act Post Moratorium Reforms Occupancy Certification System Department of Lands, Planning and the Environment May 2016.
Phillipa Silcock Using and discharging conditions.
1 24. “(1) The Certification Council may grant accreditation to certification service provider, its cryptography services, electronic signature or advanced.
Contestability in Connections Contestability Working Group Meeting NIE/SONI Joint Presentation 9 September
Mike Ellis Executive Director – Property + Projects
EIA approval process, Management plan and Monitoring
(Auditing & Accounting) Bill, 2003
Administration of a FIDIC Contract - Project Control
Temporary Works Co-ordination
Project Development and Managing your Build Agenda
Unit-3 Structure and Formation of Bank and Financial Institutions
Data Protection Act and Computer Misuse Act ANSWERS.
North of Tyne Community Led Local Development
IECEx ExTAG Training Workshop 29th September
SAIMM Mining Charter 2017 Breakfast
Insurance, Liability and Indemnity issues for Assigned Certifiers
About ACE Purpose of ACE Values
FIRE UPGRADES OF EXISTING BUILDINGS
Presentation transcript:

The New Building Standards System Completion certificates

Same intention as currently, but presented differently now made explicit by having applicant submit the completion certificate verifier must accept if satisfied

Completion certificate for what? After construction; demolition; provision of services, fittings or equipment; conversion After work required by a notice

Submitting completion certificate Must be submitted by the ‘relevant person’, who is - the person doing work for themselves the person for whom a contractor is doing the work and where the above fail to submit, the owner

Accepting completion certificate 1 Verifier must accept if, after reasonable enquiry, satisfied that – The work was carried out in accordance with the building warrant and - for construction and conversion, the building as constructed/converted complies with the building regulations

Accepting completion certificate 2 for the provision of services, fittings or equipment, the services, fittings or equipment provided comply with the building regulations The requirement for demolition is that the work was in accordance with the building warrant

Rejection of completion certificate Apart from normal reasons of non- compliance, must have sufficient information – e.g. a SAP rating for dwellings now required at this stage When rejecting, must notify the owner if the submission is by someone else

Certification of construction A completion certificate submission may be accompanied by a certificate from an approved certifier of construction Certification is that specified construction complies with the building regulations

Offences – completion 1 Certifier issuing, knowingly or recklessly, certificate which is false or misleading (in a material particular *) Submission of a completion certificate, knowingly or recklessly, which is false or misleading* Acceptance by a verifier of a completion certificate containing a statement known to be false*

Offences – completion 2 Occupation or use of a building knowing no completion certificate has been accepted, or without regard to whether a completion certificate has been accepted (Note – does not apply to alterations)

Temporary occupation or use Before a completion certificate has been accepted, a verifier may grant a relevant person permission for temporary occupation or use A time limit must be set (may be extended on further application)

Continuing requirements – limited in completion certificates A continuing requirement may only be applied to an acceptance of a completion certificate when a warrant was not obtained when it should have beenA continuing requirement may only be applied to an acceptance of a completion certificate when a warrant was not obtained when it should have been (Note continuing requirements, and consultation, covered elsewhere)(Note continuing requirements, and consultation, covered elsewhere)

Completion certificates – multiple buildings on warrant The relevant person must submit a separate completion certificate for each dwelling covered by a warrant For non-dwellings, either a separate completion certificate may be issued for each building covered by warrant or a single completion certificate covering all the buildings

Multiple buildings - limitations For buildings containing multiple dwellings, the first completion certificate may only be accepted when all the communal areas are complete For sites with multiple dwellings, the last completion certificate may only be accepted when all communal matters covered by warrant are complete

Deemed decisions and appeals An appeal to the sheriff is allowed when a verifier rejects a completion certificate a verifier imposes a continuing requirement (only applies when no warrant obtained) Period for deemed decision is 14 days