BNL Overview DOE Annual HEP Program Review Brookhaven National Laboratory April 17-19, 2006 Sam Aronson.

Slides:



Advertisements
Similar presentations
U.S. Department of Energy Brookhaven Science Associates BNL’s Role in High Energy Physics Thomas B.W. Kirk Associate Director for High Energy and Nuclear.
Advertisements

DOE Neutrino Program Plans
Physics Department Meeting June 19, 2008  Safety items: Mike Zarcone  DOE Emergency Management Audit next week  Department news  Budget update  Looking.
Sept. 18, 2008SLUO 2008 Annual Meeting Vision for SLAC Science Persis S. Drell Director SLAC.
Department of Energy Office of Science Yet Another Report from DOE Office of High Energy Physics Presented to SLUO September 10, 2006 Dr. Robin.
Interdisciplinary and Interagency Cooperation in High Energy Physics Barry Barish BPA 5-Nov-02.
Future Planning for SLAC Persis S. Drell. December 5, 2003SLAC Scenarios2 Scenarios Study 2003: Process  Started early in 2003  Inclusive of SLAC faculty,
Performance Evaluations: PPA InterpretationsPage 1 Interpretations on Performance Evaluation Process D. MacFarlane June 4 th, 2009.
F Accelerator Physics Center: Status FNAL Steering Group V. Shiltsev.
HEPAP and P5 Report DIET Federation Roundtable JSPS, Washington, DC; April 29, 2015 Andrew J. Lankford HEPAP Chair University of California, Irvine.
3/6/2006FY07/08 DOE Budget Briefing1 FY07/08 Budget Briefing Jonathan Dorfan Director Persis Drell Deputy Director SLAC.
M W PooleJoint DL-RAL Accelerator Workshop Jan 09 Introduction to ASTeC Programmes M W Poole Director.
Brookhaven Science Associates Office of Science U.S. Department of Energy BNL: Status and Future Plans in Nuclear & Particle Physics Sam Aronson, BNL High.
Fourth Generation Light Source for UVA Blaine Norum Department of Physics 3 May, May 2011.
Planning for Discoveries in Particle Physics Michael Witherell EPP2010 May 16, 2005.
Department of Energy Office of Science High Energy Physics Briefing to the Astronomy and Astrophysics Advisory Committee Dr. Robin Staffin Associate Director,
24 April 2015 FY 2016 Budget Request to Congress for DOE’s Office of Science Dr. Patricia M. Dehmer Acting Director, Office of Science
Physics Priorities S. Dawson July 11, 2007 Fermilab Steering Committee Meeting.
SLUO LHC Workshop: Closing RemarksPage 1 SLUO LHC Workshop: Closing Remarks David MacFarlane Associate Laboratory Directory for PPA.
Office of Science U.S. Department of Energy RHIC Users Meeting BNL; June 8, 2006 Gulshan Rai RHIC/AGS Users Meeting Gulshan Rai Program Manager for Heavy.
BROOKHAVEN SCIENCE ASSOCIATES Peter Bond Deputy Director for Science and Technology October 29, 2005 New Frontiers at RHIC Workshop.
U.S. Department of Energy Office of Science U.S. Department of Energy Office of Science High Energy Physics Advisory Panel Meeting FY 2009 Budget Request.
1.  Mission: Improve and operate accelerators, support the experimental program, and design and construct new accelerator facilities in an environmentally.
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
Light Source Reviews The BES Perspective July 23, 2002 Pedro A. Montano Materials Sciences and Engineering Basic Energy Sciences BASIC ENERGY SCIENCES.
Office of Science U.S. Department of Energy Raymond L. Orbach Director Office of Science U.S. Department of Energy Presentation to BESAC December 6, 2004.
Challenges & Issues for SBNE Nigel S. Lockyer 4/4/14.
Proposal for HCP2009 for Brookhaven National Laboratory Sally Dawson Howard Gordon.
11 DOE Office of Science High Energy Physics Program AAAC Meeting October 15, 2009 National Science Foundation Dennis Kovar Associate Director of the Office.
DESY Photon Science XFEL official start of project: 5 June 2007 FLASH upgrade to 1 GeV done, cool down started PETRA III construction started 2 July 2007.
US LHC Accelerator Research Program Jim Strait For the BNL-FNAL-LBNL LHC Accelerator Collaboration DOE Meeting 18 April 2003 brookhaven - fermilab - berkeley.
P5 Meeting - Jan , US LHC The Role of the LHC in US HEP Dan Green US CMS Program Manager January 28, 2003.
1 BNL LARP Accelerator Physics Program Resources BNL role in national program BNL Accelerator Physics Program.
Director’s Comments on the BNL Strategic Plan RHIC/AGS Users Meeting May 29, 2008 Steve Vigdor, filling in for Sam Aronson.
J. Strait Fermilab 16 October 2006 Consideration on LHC upgrade from A US perspective.
Summary Comments and Discussion Pier Oddone 40 th Anniversary Users’ Meeting June 8, 2007.
Brookhaven Science Associates U.S. Department of Energy Brookhaven National Laboratory A brief overview P.D. Bond.
Welcome and Presentation of Charge Steve Holmes Accelerator Advisory Committee ( May 10-12, 2005.
International Design Study for a Neutrino Factory in the 5 Year Plan A. Bross NFMCC CM January 15, A. Bross NFMCC CM January 15, 2009.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Strategic Planning John Hill Experimental Facilities Division Director NSLS-II EFAC May 5 th 2008.
Department of Energy Office of Science  FY 2007 Request for Office of Science is 14% above FY 2006 Appropriation  FY 2007 Request for HEP is 8% above.
Jefferson Lab’s Enabling Technologies: A Call for Strategic Planning W. OREN JLAB Engineering Division 9 February 2012.
News Y2K June 25, Summary of June 12 Face-to-Face Meeting.
Budget Outlook Glen Crawford P5 Meeting Sep
P5 Report: The Particle Physics Roadmap 1 A. Seiden Fermilab May 14, 2007.
SLAC and ILC Jonathan Dorfan, Director LCFOA, SLAC May 1, 2006 Particle & Particle Astrophysics.
ILC 2007 Global Design Effort 1 Planning Damping Rings Activities in the Engineering Design Phase Andy Wolski Cockcroft Institute/University of Liverpool.
DESY. Status and Perspectives in Particle Physics Albrecht Wagner Chair of the DESY Directorate.
BNL Overview DOE Annual HEP Program Review Brookhaven National Laboratory April 17-19, 2006 Sam Aronson.
Steering Group Meeting 10:30 – 12:30 am CDT Monday, July 23, 2007 Y2K.
Nigel Lockyer Fermilab Operations Review 16 th -18 th May 2016 Fermilab in the Context of the DOE Mission.
Eric Prebys, Fermilab Program Director, LARP July 10, 2012.
1 AGS RSVP Review 4-5 November 2004 Management Issues Philip Pile Collider-Accelerator Department 4 Feb 2004.
DETECTOR RESEARCH AND DEVELOPMENT Fred Borcherding 1.
Nigel Lockyer Fermilab Operations Review 16 th -18 th May 2016 Fermilab in the Context of the DOE Mission.
CMS Crosscut Operations and Research, Theory, Computing, University Involvement C. Young and B. Zhou.
Brookhaven Science Associates 2006 RHIC & AGS Annual Users’ Meeting June 5-9, 2006 Sam Aronson Interim Director.
CPAD Instrumentation Frontier Meeting October 5-7, 2015 Glen Crawford, Helmut Marsiske Office of Science, U.S. Department of Energy DOE Office of High.
CPM 2012, Fermilab D. MacFarlane & N. Holtkamp The Snowmass process and SLAC plans for HEP.
Fundamental aspects of muon beams submitted to Accelerator R&D panel for GARD funding consideration by J.P.Delahaye/SLAC & Robert D. Ryne/LBNL.
Fermilab Budget Briefing FY 2014 Intensity Frontier Proton Research KA Breakout February 28, 2013 Office of High Energy Physics Germantown, MD.
1 CF lab review ; September 16-19, 2013, H.Weerts Budget and Activity Summary Slides with budget numbers and FTE summaries/activity for FY14 through FY16.
FNAL SCRF Review R. Kephart. What is this Review? FNAL has argued that SCRF technology is an “enabling” accelerator technology (much like superconducting.
Jefferson Lab Overview
LHC Science Goals & Objectives
Introduction to ASTeC Programmes
BigPanDA Technical Interchange Meeting July 20, 2017 Hong Ma
Yet Another Report from DOE Office of High Energy Physics
Introduction to Jefferson Lab
Preliminary Project Execution Plan
Presentation transcript:

BNL Overview DOE Annual HEP Program Review Brookhaven National Laboratory April 17-19, 2006 Sam Aronson

April 18, 2006 S. Aronson 2/8 BNL Overview n The state of the Lab: The CFN is in construction NSLS II preparing for CD1 RHIC II preparing for CD0 n The state of HENP: NP – its health is a key to a healthy HEP program! –RHIC is operating –EBIS is in construction –e-cooling R&D is under way –Detector upgrades are under way HEP –You’re here to assess that…

April 18, 2006 S. Aronson 3/8 Glossary n AARD – Advanced Accelerator R&D Group n ATF – Accelerator Test Facility n CFN – Center for Functional Nanomaterials n DETF – Dark Energy Task Force (HEPAP) n EBIS – Electron Beam Ion Source n FFAG – Fixed-focus Alternating Gradient n LSST – Large Synoptic Survey Telescope n NSLS II – National Synchrotron Light Source 3 rd generation facility n NuSAG – Neutrino Science Assessment Group n QCDOC – Quantum Chromodynamics on a Chip n RHIC II – Relativistic Heavy Ion Collider luminosity upgrade project n RSVP – Rare Symmetry Violating Processes Project n SMD – Superconducting Magnet Division VLB O – Very Long Baseline Neutrino Oscillation Experiment n WFO – work for others

April 18, 2006 S. Aronson 4/8 The state of HEP n Reorganized experimental groups post-RSVP Collider physics –US-ATLAS, D0 –ILC Detector R&D (with Instrumentation Div.) Fixed target & non-accelerator based physics –Neutrinos: MINOS, reactor  13, very long baseline –Cosmology, astrophysics: LSST Strong theory & accelerator groups –High Energy Theory –Advanced Accelerator R&D (key to Muon Collaboration) –Accelerator Test Facility (HEP, BES) –Superconducting Magnet Division (NP, HEP, WFO) Broad R&D programs –Accelerators: AARD, ATF, SMD –Detectors: ILC, LHC upgrade, astronomical (Physics, Instrumentation)

April 18, 2006 S. Aronson 5/8 HEP Overview n Physics: staff ~ 220, HEP staff ~ 90, 60% ATLAS, 40% everything else ATLAS, D0, Theory, MINOS,  13, VLB O, LSST, ATF, AARD, ILC n Superconducting Magnet Division: staff ~ 50 Accelerator and Magnet R&D: LARP, ILC n Instrumentation Division: staff ~ 50 (mostly Lab-funded) ATLAS, ILC, LSST n Collider-Accelerator: staff ~ 370 (mostly NP-funded) Neutrino R&D (with FNAL), AGS (if g-2) ~$28M/yr in Budget Authority

April 18, 2006 S. Aronson 6/8 Current/near-term issues to focus on n ATLAS Staffing Research Program funding Travel funding Computing Infrastructure n SMD Core competencies Survivability options ALD Review in June n Theory Staffing n LSST DETF  P5 New research group n Neutrinos Decision on Daya Bay Join VLB O study w/ FNAL (g-2)  P5 Funding n AARD HEPAP Subpanel R&D review n ATF Staffing

April 18, 2006 S. Aronson 7/8 Broader issues to focus on n Alignment with national goals n Health of current efforts n Viability of path forward SMD is an important health & viability case n Right-sizing the BNL HEP effort Balancing scientific vs. technical personnel Balancing core effort vs. project effort

April 18, 2006 S. Aronson 8/8 Final thoughts (until tomorrow) n Lots of material yet to be presented Some of the important themes, especially in the experimental program are new since the last review n Keep in mind the broad issues BNL (as well as DOE) can benefit from your opinion on whether this program makes sense as a package (as well as from detailed technical assessments)

April 18, 2006 S. Aronson 9/8 Summary n The BNL HEP program is in excellent shape < 1 year after RSVP crashed and burned Reorganized, downsized New path forward (ATLAS + neutrinos +  ) Commitments to ongoing efforts maintained (ATLAS, MINOS, D0,  -Collaboration, etc.) Emerging efforts nurtured while the national program is being mapped out (ILC, Daya Bay, LSST) All the components are scientifically very well-motivated n Issues Magnet Division scope and role Breadth of the program vs. staff size n Given the state of the national program (i.e., in flux) we think it is appropriate to be positioned as we are (i.e., pushing our funding envelope)

April 18, 2006 S. Aronson 10/8 Outlook n Near term (what could our HEP program look like at the next annual review?) n Assuming encouragements from AAR&D, DETF, P5, ILC Bigger ATLAS Research Program team; core effort ~ same size Neutrino effort slightly increased with R&D-supported (and/or LDRD-supported) staff for a serious Daya Bay effort ATF increased by 1 scientist (initially lab-supported?) Theory, AARD, LSST at ~current size Project planning in C-AD for AGS upgrade for E969 (g-2) Stabilization of SMD based on ILC R&D funding n This will eventually lead to some growth with project funds or program funds above constant effort Based on the above assumption (go-aheads on all fronts)

April 18, 2006 S. Aronson 11/8 Outlook n Longer term (2 years down the road, same assumptions) Increase of LSST effort by 1-2 FTE Growth in ILC R&D g-2 construction n Longer term (> 2 years) US HEP itself is hard to predict on that time scale, without knowing what development track ILC is on Assume ATLAS is a going research enterprise, ILC is a going R&D enterprise Neutrinos? AAR&D? LSST? g-2? If the current portfolio goes ahead as it is now, can expect some further growth in ILC effort, everything else ~flat