PRESENTATION ON CIVIL WORKS

Slides:



Advertisements
Similar presentations
BY DR. VIJAY P. SINGH SPECIAL STATE PROJECT DIRECTOR SSA/RMSA DELHI Role of Principals/Vice Principals (HoS) in Implementing SSA and RMSA.
Advertisements

MONITORING FUND MANAGEMENT SCHEME Today’s Software for tomorrow YOJNA.
OVERVIEW OF CIVIL WORKS IN ODISHA STATE BY C. GANAPATHY, SENIOR CONSULTANT, TSG.
Effective and Innovative Effective and Innovative Leadership LeadershipforPrincipals/Vice-Principals 1.
Benefits of having Optimal Technical Staffing & Supervision Structure for SSA Civil Works Sarva Shiksha Abhiyan Mission Gujarat.
IMPLEMENTATION OF WHOLE SCHOOL DEVELOPMENT PLAN IN SCHOOLS OF GUJARAT
Environmental Assessment Survey of School Building.
SCHOOL MAPPI NG PRESENTATION BY SATISH GIROTRA Senior Consultant, TSG, EDCIL.
CUMULATIVE PROGRESS (PHYSICAL STATUS) State:DELHI S. No.Activities Targets till date (Units) Cumulative Completed (Units) Cumulative In Progress (Units)
NRHM DISTRICT ACTION PLANS PARTICIPATORY & EVIDENCE BASED PLANNING PROCESS.
Reconstruction of Earthquake Damaged Rural Houses (REDRH)
WELCOME. DISTBPLAPLSCHAW SOUTH WEST DHALAI NORTH TOTAL SANITATION CAMPAIGN IN TRIPURA.
By Satish Girotra Implementation of school infrastructure.
Build and maintain democratic and decentralized local government institutions that are capable to participate in the development of social and economic.
SUB COMMITTEE ON DISTRICT PLANNING PROCESS. 2  The DPCs are weak bodies with little professional support to guide & monitor planning process except in.
National Mental Health Programme. Govt of India integrated mental health with other health services at rural level. It is being implemented since 1982.
Water, Sanitation and Hygiene (WASH) in All Schools
Department of Drinking Water and Sanitation, Ministry of Rural Development, GoI Total Sanitation Campaign(TSC) Workshop on Strengthening Local Self Governance.
GOALS & OBJECTIVES UNIVERSALISATION OF ELEMENTARY EDUCATION STRONG COMMUNITY PARTICIPATION – INVOLVING SMCs IN BUILDING CONSTRUCTION PROCESS BUILDINGS.
Water Services Trust Fund Training Workshop for Field Monitors Team Hierarchy, Communication within the Field Monitors Team & Communication with the WSTF.
WELCOME. WHY SANITATION ? WORLDWIDE 3.4 MILLION PEOPLE DIE DUE TO WATER RELATED DISEASES 2.2 MILLION DIE EACH YEAR DUE TO DIARRHOEAL DISEASES ALONE SOUTH.
WELCOME TO TRAINING PROGRAMME FOR CONSULTANTS’ SERVICES FOR 3 rd PARTY QUALITY CONTROL AND QUALITY ASSURANCE G. PRABHAKAR.
EdCIL, Technical Support Group (SSA), New Delhi Presentation on Financial Management Assessment Tool 30th Quarterly Review Meeting of Finance Controllers.
Civil Works, SSA, Assam Every School Beautiful Every Child In School Every Child Learning A xom Sarba Siksha Abhijan Mission.
National Seminar on “Addressing Equity Issues in Educat ion” Community Involvement Towards Greater Equity - Andhra Pradesh Experience Rajiv Vidya Mission.
GRAM VIKAS- AN OVERVIEW. LOCATION OF WORK 19 districts 38,397 families 542 habitations 200,000 people.
Implementation of FM Action Plan and Monthly Expenditure Plan Group-I M.P,Jharkand,U.P.,Gujarat, Chattisgarh,Nagaland,Chandigarh, Daman&Diu Shri Ved Praksh.
SCHOOL INFRASTRUCTURE SURVEY
Roles & Functions of the three levels of Rural Local Government in WATSAN Programme Arvind kumar REGIONAL WATSAN COORDINATOR B-TAST ( DFID- SWASTH)
Industrial Engineering Roles In Industry
Water Services Trust Fund The Urban Projects Concept (UPC) Implementation Workshop Role and Responsibilities of Field Monitors David Njue, Investment.
NATIONAL SCHOOL HEALTH EDUCATION PROGRAMME (SHEP) IN GHANA BY CYNTHIA BOSUMTWI-SAM.
LIFE THIRD COUNTRIES Development and Implementation of an Integrated System for the Control and Monitoring of the Urban Wastewater Treatment Plants in.
Presentation Somathilaka Kindelpitiya Community Development Specialist 21 st July, 2012.
Statutory Audit of SSA Accounts for A PROGRAMME FOR UNIVERSAL ELEMENTARY EDUCATION MANUAL ON FINANCIAL MANAGEMENT AND PROCUREMENT Ministry of Human.
Environmental Assessment Survey of School Building Sarva Shiksha Abhiyan Mission Gujarat State Annexure-VI.
Karen Seay PARENTAL INVOLVEMENT 101 – Writing a compliant policy and compact We’re all in this together:  State Department of Education 
PARAMETERS, STRENGTH & ISSUES FOR LOW PERFORMING STATE BIHAR AS ON
FOURTEENTH JOINT REVIEW MISSION 18 TH TO 28 TH JULY 2011 (Recommendations)
Seminar on Village Health and Sanitation Committee A Vision under NRHM Shib Sekhar Datta
Prepared by the (Institute of Industrial Engineers – Industry Advisory Board)
WELCOME SOUTH TRIPURA. TARGETS BPL APL SCHOOLS AW/BC Approved 1,05, Survey 1,00,858 43,
ASHA Sahyogini intervention in Rajasthan by Vaidehi Agnihotri
WELCOME SOUTH TRIPURA. TARGETS BPL APL SCHOOLS AW/BC Approved 1,05, Survey 1,00,858 43, THE CAMPAIGN WAS LAUNCHED IN AUGUST 2002 BASE.
Under ICDS Scheme. ICDS Profile UNITSANCTIONEDFUNCTIONAL Dist. Level ICDS Cells21 No. of ICDS Projects148 No. of AWCs AWCs in Minority Area
Facilitating development through constitutional review FADCORP March 2014.
De-centralization: Challenges, Steps
Training on the Facilitation of Environmental & Social Management Framework (ESMF)
WELCOME. SANITATION CAMPAIGN IN SOUTH TRIPURA TARGETS BPL APL SCHOOLS AW/BC Approved 1,05, Survey During this year all schools.
BACKWARD REGIONS GRANT CAPACITY BUILDING PLAN PANCHAYATI RAJ DEPARTMENT GOVERNMENT OF ODISHA PANCHAYATI RAJ DEPARTMENT GOVERNMENT OF ODISHA.
Urban Group Presentation. Commitment and Leadership Legislate Policies Increase Allocation Sanitation Champions at different levels Sanitation as a separate.
Presentation for National Workshop/ Review Meeting of State Project Engineers/ Civil Works Coordinators Puri, Orissa Date : 16 & 17 November, 2011.
Training and Entrepreneurship Development Programme in India
Axom Sarba Siksha Abhijan Mission ASSAM Welcomes all participants of 21 st quarterly review meeting of Finance Controllers Date : 27 th & 28 th April,
Mid Day Meal Scheme MDM-PAB Meeting : Chandigarh on Ministry of HRD Government of India.
Guideline for Civil Infrastructure for AWP & B
Environmental Land Management and Rural Livelihoods Project (2013 – 2018) Project Overview Zafar Mahmudov, Project Coordinator.
ActionSoft Tool for Scheme Implementation & Monitoring.
Theory of change Contribution: 1 Standardisation of technical manual for urban utilities Condition:1 Technical standardisation of water and sanitation.
1 District: Diu Swachh Vidyalaya. 2  Construction of infrastructure is supervised by Public Works Department Engineers and monitored by the Headmaster.
World Bank Procurement Procedures Module - Technical Specifications for RTDAS Anish ….. Hydro-Informatics Expert The World Bank.
KENYA INSTITUTE OF CURRICULUM DEVELOPMENT
PRESENTATION. . The Meghalaya Administrative Training Institute, Shillong as State Nodal agency for implementing the intensive training programme “training.
Civil works component is one of the important interventions of SSA. It helps in bridging the infrastructural gaps and acts as a visible intervention to.
RVM (SSA) Ranga Reddy,AP. “Quality Education for all”
RAJIV VIDYA MISSION (SSA), ranga reddy Community Trainings & Mobilization 1.
State Disaster Management Plan
TRAINING FOR ALL DISTRICT JHAJJAR
Addressing Local Priorities in Primary Education – Issues & Perspectives Dipak Ray (OPEPA, D/O S & ME)
Introduction Introduction of the trainer
Presentation transcript:

PRESENTATION ON CIVIL WORKS ANNEXURE-III PRESENTATION ON CIVIL WORKS

PROCESS FOR EXECUTION OF CIVIL WORKS IN THE DISTRICTS ANNEXURE-III PROCESS FOR EXECUTION OF CIVIL WORKS IN THE DISTRICTS 1. PLANNING 2.QUALITY MEASURES 3.METHODOLOGY 4.CONVERGENCE

1.1.MONITORING STRUCTURE UNDER CIVIL WORK AT DISTRICT LEVEL ANNEXURE-III 1.1.MONITORING STRUCTURE UNDER CIVIL WORK AT DISTRICT LEVEL COLLECTOR-CUM SSA COMMITTEE CHAIRMAN DISTRICT PROJECT COORDINATOR SENIOR TECHNICAL CONSULTANT AT DISTRICT LEVEL TECHNICAL CONSULTANT AT EACH BLOCK . SCHOOL MANAGEMENT COMMITTEE (SMC)

1.2.PLANNING PROCESS AT DISTRICT LEVEL. ANNEXURE-III 1.2.PLANNING PROCESS AT DISTRICT LEVEL. School Management Committee (at School level) Infrastructural demands are being furnished by the SMC. Cluster Level Compilation of school wise plan and onward transmission . Block Level Compilation of cluster wise plan and transmission to District level. District Level All the Block level plans are compiled and verified with the DISE and need based proposals are submitted to SPO.

1.3.FINANCIAL FLOW CHART OF SSA FUND ANNEXURE-III 1.3.FINANCIAL FLOW CHART OF SSA FUND SSA PROJECT FUND 65% share Govt. of India 35% share State Govt. State Project Office, OPEPA District Project Office DPO (PM) SMC(school Point) BRC CRC Civil Non- Civil NPS, NUPS, ACR, Toilet, Repair, barrier free elements etc. SIG, TLM, RMG, Uniform, etc

District Project Office 1.4.MODE OF RELEASE OF FUNDS TO SMC For smooth and speedy progress of work the funds are released to the S.M.C through bank advice. Funds released in two phases i.e, 75% of the estimated costs to start up the work up to roof casting level and rest 25% is released for completion of work. Second installment is released only on receiving of utilization certificate from the SMC. Utilization certificates are prepared as per measurement recorded by block level engineers in the MB and duly check measured by District engineer there on. State Project Office District Project Office SMC

2.1.CAPACITY BUILDING Construction manual (local language / graphical representation); Leaflets explaining construction specifications and procedures (local language), Training module revised; Regular Trainings are being imparted to SMCs & Engineers to familiarize the process of construction works through community, roles & responsibilities of SMCs & Engineers. Uniform UC format, Separate SMC training on accounts maintenance conducted by Finance Consultants

2.2.TRAINING AT GRASS ROOT LEVEL Roles & responsibilities of SMCs & technical personnel Accounts management Choosing suitable plans Involving the community in engaging labours, buying materials & overseeing the construction Ensuring the quality of construction Post construction maintenance leading to sustainability A Documentary Film, some Training modules and leaflets prepared in local language. SMC TRAINING MASONS TRAINING Adopting cost effective technologies & Maintaining design specifications Manuals developed in local language- “Sikshya Needa”

2.3.BUILDING PLANS & DESIGNS ANNEXURE-III 2.3.BUILDING PLANS & DESIGNS SITE SPECIFIC PLAN/ DESIGNS Site specific plan with a view for future expansion. Encouragement to use of local skill and materials for cost effective. Adoption of multi hazard resistant features. FLOOD: Fixing of plinth level basing on the recorded H.F.L. Stair case to the terrace of the school in areas subjected to frequent flooding. CYCLONE : Restricted openings & its placements EARTHQUAKE : Hazard zone maps available in the Vulnerability Atlas used to decide mitigation measures. Horizontal bands at plinth level & lintel levels and vertical reinforcements provided following Codal specifications to act as a box like structure 9

2.4.MONITORING AND SUPERVISION Monthly Review Meeting held at State Project Office. Zonal Review meeting, comprising 7 to 8 district in each group is also held in every month by the State Project Engineers. Monthly Review meetings are held in District Project Office by the Collector-cum-Chairman. Weekly Review meetings are held in District Project Office of the technical personals. Meetings with SMC are also conducted by the technical personals.

2.5.THIRD PARTY EVALUTION The National Institute of Technology (NIT), Rourkela has been awarded to conduct 3rd party evaluation in 30 districts of Orissa. The evaluation work is in process.

3.1.Method of implementation of civil work at field level PRE CONSTRUCTION SMC TRAINING & FOLLOW UP DURING CIVIL CONSTRUCTIONS ENSURES Proper management of accounts & assets Cost effective decisions Meaningful participation Optimizing cost & ensuring quality Acceptable workmanship Creation of Child Friendly & Learning Environment Sustainable approach envisages raising of corpus fund & post maintenance activities

3.2. ESSENTIAL FEATURES PROVISION OF ESSENTIAL FEATURE IN BUILDING Drip Course, Plinth Protection, Rain water Drainage spouts etc. OTHER IMPORTANT BUILDING COMPONENTS Ramps with hand rail for CWSN students, fire fighting equipments are provided. ATTRACTIVE & LEARNING ENVIRONMENT Child Friendly Elements such as Swing, Slide, See- saw etc., In built learning components such as wall pictures, wall painting, grills depicting alphabets & numbers, Children’s chalk board, learning corners, verandah with a different get up etc.

3.3.QUALITY CONTROL MEASURES Various tests for materials like cement, steel, bricks, fine and coarse aggregates are conducted before and during execution of work. Workshops & Seminars for updating the technical knowledge. Manuals & Leaflets are distributed among SMCs during training for dissemination of knowledge regarding quality.

4.1.CONVERGENCE WITH GOVT DEPARTMENTS Convergence Programme : A number of convergence meetings are held with RD Department regarding provision of toilet and water supply facility to each school under the chairmanship of Collector. RWSS/TSC (Total Sanitation Campaign) have made a target to provide separate toilets for boys and girls in all school. The Technical personnel of RD & the SSA have constituted a technical taskforce for implementation of such programme timely and successfully.

4.2.CONVERGENCE FACTOR Convergence Programme : ANNEXURE-III 4.2.CONVERGENCE FACTOR Convergence Programme : Toilet & Drinking Water facilities in Rural areas are executed through EE, RD. Toilet & Drinking Water facilities in Urban areas are executed through SSA Girls’ Toilet both in Rural & Urban areas is executed through SSA Executive Engineer, RWSS is one of the member of District SSA Committee. District Project Coordinator, SSA is one of the member of the TSC Rural Urban Toilet RD SSA Girls’ Toilet Drinking Water

THANK YOU