Central London Congestion Charging Scheme Congestion Charging in London 21 April 2006 Michèle Dix Director, Congestion Charging Division Michèle Dix Director,

Slides:



Advertisements
Similar presentations
Changing Travel Behaviour Phil Goodwin Centre for Transport and Society, UWE Bristol.
Advertisements

IPPR Conference - 26 October 2005 Building a consensus on national road pricing: the challenges ahead Session 3 The next steps for London Dick Halle Transport.
Smarter Travel Programmes– Financial impacts for Transport for London COLIN BUCHANAN
Getting Started with Congestion Pricing A Workshop for Local Partners Federal Highway Administration Office of Operations.
1 Road pricing in the UK Ian Drummond Head of Road Pricing Framework Division Department for Transport United Kingdom Ian Drummond Head of Road Pricing.
Accidents and Air Quality Models for EMME/2 Marwan AL-Azzawi.
WCTRS seminar on Green Urban Transport in China, Shanghai, September 11th to 13th 2010 Policies to reduce car use – lessons from Britain Roger Mackett.
Restricted © Siemens AG 2013 All rights reserved.Answers for infrastructure and cities. WORLD CLASS? London’s Transport: Progress and Future Challenges.
Enhanced analytical decision support tools The Scheme level Final workshop of the DISTILLATE programme Great Minster House, London Tuesday 22 nd January.
West London Transit – One Track Mind or Broad Vision?
CONGESTION PRICING Traffic Solution or Tax Scheme?
Congestion targets & Road pricing Steve Gooding Director, Roads Performance and Strategy Steve Gooding Director, Roads Performance and Strategy.
Ewan Anderson, Fore Consulting Limited.  Two examples of recent projects:  Harlow Grange, Harrogate (124 dwellings).  Clifton Gate, York (3,400 dwellings).
Humber Bridge Review Results from the HUMBER ESTUARY TRANSPORT MODEL.
A Very Big Experiment Congestion Charging in London Peter Jones Transport Studies Group University of Westminster.
A Brief Comparison on Traffic System Between London and Shanghai Allen Liu, Shanghai Feb. 16 th 2012.
The London Congestion Charge. Facts Traffic speed in central London had fallen more that 20% since the 1960s (14.2 mph to 10mph) I n 1998 drivers in inner.
Bring Back the Tram! Steve Miller Transport for London.
Urban Transport in the Developing World. Elements of Urban Transport Sector Urban public transport: Urban public transport: On-street systems (for buses,
Paul Roberts – TIF Technical Manager Presentation to the TPS – 3 June 2009.
SafeZone Martin Baker Road Safety Team Leader Poole Borough Council Kevin Jones UK Product Sales Manager Siemens.
London Transport Policy, Planning and Strategies Towards clean and sustainable transport By Lucy Hayward-Speight, TfL Principal Policy Advisor.
Seminar 23rd November 2001 Other Policies: Demand Management & Highway Investment Professor Marcial Echenique.
Odysa ® Experiences with an individual “green wave” Marcel Willekens / Arjan Bezemer / Kristiaan Langelaar.
RAC Foundation Pricing, planning and new technology. Are they alternatives? Sir Christopher Foster RAC Foundation for Motoring 23July 2004 To the Conference.
Joint Transport Forum I Rapid Transit Line 2 Our Future Transport I West of England Sub Region.
Ultra at Heathrow & beyond BASE April 2013 Presentation by Adam Ruddle, Key Account Manager, Ultra Global PRT.
BTRE GUEST SEMINAR Canberra, Australia 19 July 2007 « Recent Road Pricing Experience» Jack Short Secretary General International Transport Forum
TRANSPORT INNOVATION FUND Stephen McFarlane Regional & Local Transport Delivery - DfT.
GeniUS! Challenge #4 - Utilising footfall & transport 15/3/12 Andy D’Agorne.
 Scotland’s National Transport Strategy A Consultation.
Central London Congestion Charging David Hutchinson GREATER LONDON AUTHORITY International Union of Air Pollution Prevention and Environmental Protection.
London’s Congestion Charging Scheme Presentation by Karen Akins to TRB Pricing Committee January 15, 2002.
Arriva in Southend Kevin Hawkins Commercial Director.
London Congestion Charging. Central London Congestion Charging Zone.
Congestion Charging London
TRANSPORT The Cambridge Futures response to the Draft Structure Plan Dr Tony Hargreaves, Cambridge Futures.
Client Name Here - In Title Master Slide Data Requirements to Support Road Pricing Analyses Johanna Zmud, Ph.D. NuStats Partners, LP Expert Forum on Road.
Civil and Environmental Engineering 1 Norway’s toll rings: Full scale implementations of urban pricing Dr. Terje Tretvik - SINTEF, Norway IMPRINT-EUROPE.
1 20 January 2006 Swedish Road Administration First impressions of congestion charging in Stockholm Jenny Källström, Analysis and Society division  Background.
Considering land use as a transport policy tool: A London perspective Isabel Dedring, Transport for London IMPACTS Vienna, March 2006.
Social Costs P Q S (mc) d msc Congestion Charges.
W. Suchorzewski, WUT, th November 2005 REVENUE Revenue Use from Transport Pricing 5FP – DGTREN Urban case studies – Warsaw Warsaw.
Renaissance Southend Ltd Southend Borough Council Buses In-Depth Scrutiny 12 December 2007 Mike Lambert – Chief Executive.
Freeway Congestion In The Washington Region Presentation to National Capital Region Transportation Planning Board February 15, 2006 Item # 9.
Road pricing. Why ? What is it ? How might it be introduced ? Where and when ? How might it work? Why ? What is it ? How might it be introduced ? Where.
1. Variety of modes (types) of transport (public and private) 2. Density of transport networks more nodes and.
PARKING STRATEGY POLICY DEVELOPMENT Transportation & Asset Management Environment & Regeneration Scrutiny Committee 28 February 2007.
Central London Congestion Charging Scheme and London Low Emission Zone What charging can do for the environment 29 March 2007 Michéle Dix Director, Congestion.
Congestion Charging and Air Quality in central London 12 November 2004 Charles Buckingham Monitoring Manager, Congestion Charging Division, Transport for.
DEPARTMENT FOR TRANSPORT, LOCAL GOVERNMENT AND THE REGIONS Key Transport Facts: Trend 1: Growth in passenger transport and freight compared with.
Urban Sprawl Government notices problems in the 1980s –Urban sprawl –Car ownership rising (1960: 113/ : 422/1000) –Little housing for low income.
The Stockholm trials – Emme/2 as a tool for designing a congestion charges system 1.The trials and the congestion charges system 2.Observed effects 3.Transportation.
IPART’s review of CityRail’s regulatory framework – stakeholder roundtable 31 July 2008.
Congestion Management for China’s Transit Metropolis Cities by Professors P. Jones, D. Turner and B. Heydecker of UCL. January 2015 Workshop Beijing.
Submission Document went to cabinet … Planning for the Future Core Strategy and Urban Core Plan (the Plan) is a key planning document and sets out the.
The Proposed London Low Emission Zone
The London Congestion Charge Past, present and future… Lauren Sager Weinstein Chief of Staff, Finance and Planning Transport for London.
What Part Does Transportation and Land Use Play in Tackling Climate Change & Greenhouse Gas Emissions? Gordon Garry Director of Research and Analysis,
Impacts of Free Public Transport – An Evaluation Framework Oded Cats Yusak Susilo Jonas Eliasson.
Land Transport Infrastructure Integration. TfL’s purpose Meet the rising expectations of our customers and users Plan ahead to meet the challenges of.
Travel in the Twenty-First Century: Peak Car and beyond David Metz Centre for Transport Studies University College London.
Improving London’s air quality Joanne McCartney Deputy Mayor of London 1 st June 2016.
HS2 - What tests should be applied in evaluating the final business case ? Chris Nash.
Congestion Charging: An idea that makes sense?
Congestion The state of being overcrowded, clogged, overloaded with traffic or people.
EXTERNALITIES AND MARKET INEFFICIENCY
Traffic Management in Singapore
DEPARTMENT FOR TRANSPORT, LOCAL GOVERNMENT AND THE REGIONS
Improving London’s air quality
Presentation transcript:

Central London Congestion Charging Scheme Congestion Charging in London 21 April 2006 Michèle Dix Director, Congestion Charging Division Michèle Dix Director, Congestion Charging Division

Contents 1.The Central London Scheme 2.Its impacts 3.Would it be suitable elsewhere?

Where is the Congestion Charging zone? Central London only

The Central London Scheme 40% of England’s congestion is in London Central London was the most congested area with average all day speeds of less than 9mph Despite 85% public transport usage, vehicular traffic was still a major problem in Central London The congestion persisted throughout the day –it was not a ‘peak’ commuter problem To tackle this and using the most reliable technology available at the time, an area charging scheme covering the whole working day was developed

Camera enforcement

T 123 ABC Charge payment Daily, weekly, monthly or annual payment, for individual vehicle registration number Flat charge of £8 per day (was £5 up to 4 July 2005) Monday - Friday 7am pm Payment available up until midnight, but charge rises to £10 after 10pm

29% 22% 14% 5% <1% Total payment 106,000 / day £8 16,000 £ ,000 Fleet £7 Payment channels

Impacts of the Scheme

Results are all for the £5 Charge The impacts of the £8 charge (which started on July 4 th 2005) are being monitored Initial findings are that traffic levels & charges/payments are in line with our forecasts – early monitoring was affected by the London bombings

Impacts (with £5 charge) Congestion in charging zone down 30% Traffic entering charging zone reduced by 18% - with cars down 33% Bus patronage up, reliability and journey time improved Little or no change in number of trips to central area - 50 – 60% moved to public transport, 20 – 30% divert round zone, 15 – 25% other adaptations Net revenues £100m per year

Total traffic entering the charging zone During charging hours Feb / Mar 2002 Spring 2002 Autumn 2002 Jan 2003 Feb / Mar 2003 Spring 2003 Autumn 2003 Spring 2004 Autumn 2004 Before ChargeWith Charge

Business impacts Broadly neutral impact on overall business performance in the charging zone – no overall impact on employment, number of businesses, turnover, commercial rents or profitability. Professional services benefiting from improved mobility Retail sales declined around late 2002 and recovered by Autumn Growth slowing now but reflect wider economic factors, as charging has been a consistent factor since February However Retail sector remains concerned

46% 10% 15% 12% 3% 4% Influences on business performance Source: TfL Telephone Business Survey, Autumn 2003

Environmental Impacts Reduced emissions in the zone: Nitrogen oxides (NOx) down 16% - 12 % due to CC, rest due to engine improvements Particulate matter (PM10) down 16% - 12% due to CC, rest due to engine improvements Carbon Dioxide (CO2) down 19%

Support for the scheme Prior to the introduction of the London congestion charge public opinion was equivocal After introduction, public opinion shifted decisively in favour of the scheme, with opposition levels falling Support Neither Oppose Pre-CC Post-CC

Would the Central London Scheme be suitable elsewhere Is this type of scheme suitable elsewhere in London and in other cities? Does one size fit all? Are the problems in central London the same elsewhere? Is the congestion as persistent or the traffic mix the same? Would a different way of charging be more appropriate With new technology now available could more flexible schemes be developed? TfL has faced some of these issues itself in developing congestion charging further within London

Developments We have examined: Other areas where congestion is currently a problem and which will get worse with increasing travel demands New technologies to improve the way in which we charge; not only in the existing area, but for application elsewhere Worked with the DfT in looking at the possibilities for a national distance-based charging scheme using satellite tracking technology

Existing traffic congestion The main road network runs at capacity in specific locations at specific time In particular congestion is seen along strategic routes and in outer London town centres Saturday pm off peak IT IS graphWeekday am peak IT IS graph

Future transport trends Notes: Includes planned schemes and major infrastructure projects i.e. CTRL, CrossRail, River Crossings, and Intermediate Transit Schemes, plus Congestion Charging Western Extension. Shows the projected increase in public transport if car trips remain at current levels. Shows the projected increase in car trips taking into account population growth and car ownership/household at current levels. Work is ongoing to further validate and understand recent and projected trend in car trips. Possible Impact of policies to limit car trips Projected increase in public transport trips 10.8m 7.6m Projected increase in car trips

Western Extension

Potential Benefits of Wider Road User Charging in London Distance based charging (2005 prices, values and deterrents), weekdays only All motor vehicles charged except buses, coaches and taxis AreaChargesChanges in traffic flow Base congestion mins/km Change in congestion Central60p/km Working day -18%2.3-32% Inner30p/km Working day -20%1.0-40% Outer15p/km Peaks only -17%0.7-40% … this would facilitate economic growth and the London Plan

Technologies for Road user Charging London trials of alternative road user charging technologies have shown: Improved cameras plus ANPR effective solution available now for simple charging schemes. Tag and beacon technology for use in sensitive urban areas for more flexible charging eg charging by direction or time of day could be developed in short term (by 2009). Satellite and mobile phone location systems for ‘specific’ link based distance based charging need further development for affordable and accurate use in urban areas (beyond 2010).

Possible Timeline and Charging Basis 2006 CC Now Single zone Camera/ANPR 2009 Single zone Tags with Camera/ANPR Incentivised Tag take up 2010? Other Congestion Areas Across London Tags with Camera/ANPR Beyond 2010? GPS-based RUC across London Incentivised OBU take-up 2009/10 Re-procurement of extended central zone scheme Options: 1. Single flat rate £8 charge per day 2. Charge by: time of entry/exit direction of travel class of vehicle Charge: £8 charge per day Variable charges? By: centre route bridge time of entry/exit direction of travel class of vehicle Example charge? Rates: Central: 60p/km Inner: 30p/km Outer: 15p/km Non-equipped vehicles pay unattractive flat rate