Microsoft Project – Tutorial 4 Assigning Resources to Tasks Switch to the Gantt Chart View Then click the Assign Resources button on the Standard toolbar.

Slides:



Advertisements
Similar presentations
Microsoft Project Tutorial for Chapters 6 & 7
Advertisements

PERTEMUAN 3 PPSI Microsoft Project Presentation. What is a Gantt Chart? A Gantt Chart is a visual tool to help Plan, Manage, and Track a project or projects.
MS Project Tutorial EMEN. Entering Project Properties Choose File Properties Click the Summary tab You can now enter general information about the project.
Overview Lesson 1. Objectives Step-by-Step: Start Excel 1.Click the Start menu, and then click All Programs. 2.On the list of programs, click Microsoft.
OPSM 639, C. Akkan Before starting this section SAVE AS YOUR EXISTING MS PROJECT FILE AS -part3-1 -part3-1.
Review. Microsoft Office Excel 2013 provides powerful tools to organize, analyze, manage, and share information Locations where work is done are cells,
McGraw-Hill/Irwin © The McGraw-Hill Companies, All Rights Reserved Creating Gantt Charts With Microsoft Project Technology Plug-In T12.
| | Tel: | | Computer Training & Personal Development Microsoft Office Project 2003 Intermediate.
Creating a Document with a Table, Chart, and Watermark
Project Information: Customizing and Printing Lesson 7.
Projmgmt-1/18 DePaul University Evaluating Schedule In MicroSoft Project Instructor: David A. Lash.
Project Plan Optimization Lesson 13. Skills Matrix SkillsMatrix Skill Make time and date adjustments Adjust fiscal year settings within Microsoft Project.
Project Basics Lesson 1. Skills Matrix SkillsMatrix Skill Start Microsoft Project Standard Create a project planOpen a new project plan Specify a start.
Access - Project 1 l What Is a Database? –A Collection of Data –Organized in a manner to allow: »Access »Retrieval »Use of That Data.
Managing Grades with Excel Viewing Help To view Help 1.Open Excel on your computer. 2.In the top right hand corner of the Excel Screen type in the.
Projmgmt-1/23 DePaul University Tracking the Progress of Your Project In MicroSoft Project Instructor: David A. Lash.
Office 2003 Introductory Concepts and Techniques M i c r o s o f t Access Project 1 Creating and Using a Database.
Microsoft Excel 2010 Chapter 8
Office 2003 Introductory Concepts and Techniques M i c r o s o f t Access Web Feature Sharing Data among Applications.
Microsoft Project Presentation By Corey Johnson 10/11/00.
Project Plan Formatting – Fundamentals Lesson 6. Skills Matrix SkillsMatrix Skill Format a Gantt ChartModify the Gantt Chart using the Bar Styles dialog.
Copyright © Software Process Group 1 Software Process Group Microsoft Project Tutorial Steve Meyers
SWE 466- Resources Tutorial # 2. So far… TasksMilestones Summary Tasks Duration of the tasks.
Tracking progress on tasks and assignments TUTORIAL # 3.
Refining Your Project Plan Lesson 4. Skills Matrix SkillsMatrix Skill Apply a task calendar to an individual task Change task typesChange scheduling formula.
Microsoft Project – Tutorial 2 Project Goal network company computers to easily share resources within a time frame of three months and within a budget.
Evaluation#3 MS Project Objectived u In this lab you will learn: – how to add the resources into tasks. –How to review resource assignment information.
Working with a Database
PowerPoint. Basic Vocabulary Slide - Presentation - Slide layout – ► ► ► ► a single page in PowerPoint all the slides for a speech all the slides for.
Microsoft Official Academic Course, Microsoft Word 2013
Lecture 1 Saima Gul. What is a Project? A Project is a job that has a beginning and an end (time), a specified outcome ( scope) at a stated level of quality.
Chapter 6 Generating Form Letters, Mailing Labels, and a Directory
Advanced Project Plan Formatting Lesson 14. Skills Matrix SkillsMatrix Skill Customize the calendar view Format bar styles for tasks in the Calendar view.
Fourth R Inc. 1 WELCOME TO MICROSOFT OFFICE PROJECT 2003 INTERMEDIATE COURSE.
Office 2003 Advanced Concepts and Techniques M i c r o s o f t Access Project 6 Switchboards, PivotTables, and PivotCharts.
Ahmad Al-Ghoul. Learning Objectives Explain what a Microsoft Project environment and Project Server. Describe how to use the Ribbon, Quick Access Toolbar.
Lesson: 3 Word Processors After lesson 3, you will be able to: Perform basic tasks in a word processor. Edit and format text. Work with tables and pictures.
MS Project Tutorial 1 Goal: Introduce you to the basic idea of MS Project The basic idea is to answer the following questions and record the answers as.
Microsoft Office 2007 Access Chapter 6 Using Macros, Switchboards, PivotTables, and PivotCharts.
Analyzing Financial Data Lesson 9. 2 Lesson objectives  To discuss some of the tools QuickBooks gives you for analyzing financial data: QuickReports,
Microsoft Publisher 2010 Chapter 7 Advanced Formatting and Merging Publications with Data.
TUTORIAL 5 INSTRUCTOR: HANIF ULLAH ID: OFFICE #: 2029 DATE: 18/11/2012 Introduction to MS Project 2007.
Advanced Project Plan Tracking Lesson 15. Skills Matrix SkillsMatrix Skill Record actual start, finish, and duration values of tasks Enter actual start.
Microsoft Project – Tutorial 4 Leveling Overallocations In some cases, a resource could be assigned more work in a given time period than it has working.
Office 2003 Post-Advanced Concepts and Techniques M i c r o s o f t Access Project 7 Advanced Report and Form Techniques.
TUTORIAL 9 INSTRUCTOR: HANIF ULLAH ID: OFFICE #: 2029 DATE: 22/04/2012 Introduction to MS Project 2007.
TUTORIAL 8 INSTRUCTOR: HANIF ULLAH ID: OFFICE #: 2029 DATE: 15/04/2012 Introduction to MS Project 2007.
Microsoft Access 2010 Chapter 8 Advanced Form Techniques.
Microsoft Project – Tutorial 4 Assigning Resources and Costs we will now add resource management information and project cost data to our project a cost.
Microsoft Project – Tutorial 4 Work, Duration and Units work = duration * units units are Resources open LAN-4-2 save it with your initials as usual click.
Key Applications Module Lesson 17 — Organizing Worksheets Computer Literacy BASICS.
Return to the FastCourse Excel 2007 Level 1 book page Lesson 1: Exploring Excel 2007.
Microsoft Access – Tutorial 3 Performing Calculations copy the HighWageAmounts query and paste it name it HighWageAmountsWithBonus and open it in Design.
Work with Tables and Database Records Lesson 3. NAVIGATING AMONG RECORDS Access users who prefer using the keyboard to navigate records can press keys.
Project Plan Tracking – Fundamentals Lesson 8. Skills Matrix SkillsMatrix Skill Establish a project baseline Track a project as scheduled.
Microsoft Project – Tutorial 4 Material Costs so far we have entered work resources into our project open LAN-4-3-YourInitials (or the one I have put in.
Microsoft Project 2010 ® Tutorial 4: Assigning Resources and Costs.
Parallon Business Solutions Microsoft Project Server 2010 Project Server 2010 Concepts of Working with Tasks.
Microsoft Project 2010 ® Tutorial 5: Tracking Progress and Closing the Project.
Microsoft Project – Tutorial 3 Creating a Report open LAN-3 from the tutorials folder save the file as LAN-3-your initials click Reports > Reports double-click.
Resource and Task Assignments Lesson 3 © 2014, John Wiley & Sons, Inc.Microsoft Official Academic Course, Microsoft Project Microsoft Project 2013.
Excel Chapter 1 Creating a Worksheet and an Embedded Chart
© 2008 Prentice HallAppendix A -1 Introduction to Project Management Appendix Microsoft Project Tutorial Information Systems Project Management: A Process.
Application Extension 10a
Microsoft Project 101: How to Build a Project Plan
Project Management Skills.
In this tutorial you will:
Project Management Skills
ELC 347 project management
Information System Analysis
Presentation transcript:

Microsoft Project – Tutorial 4 Assigning Resources to Tasks Switch to the Gantt Chart View Then click the Assign Resources button on the Standard toolbar (it looks like two people) Click task 2 (Document Current Environment) Click your name (or my name) on the Assign Resources dialog box and click the Assign button on the Standard toolbar Roll over the column to the left of your name and drag to task 3 (Conduct Needs Analysis) in the Task Entry Table

Microsoft Project – Tutorial 4 Assigning Resources to Tasks select task 6 (Build RFP) use the Control Key to assign Emily King and yourself to the task at the same time you can also apply resource units to a task we have five General Labour units available click task 13 (Install Software) select General Labour from the Assign Resources dialog box type 200 in the Units column and Assign it you have assigned two General Labour units to this task

Microsoft Project – Tutorial 4 Graphing Resources you can also view resources in a graph select all the resources in the Assign Resources dialog box (shift or drag) click Graphs and switch the view to Remaining Availability zoom in and out of the graph

Microsoft Project – Tutorial 4 Assigning a new Cost Rate table remember that we set up two cost rate tables for General Labour as it is a specialized task, we want to assign the higher one to the task Install Software click Task Usage on the View Bar click General Labour assigned to task 13 click the Go to Selected Task button to jump to task 13 double-click General Labour to view the Assignment Information Dialog Box and click the General tab change the Cost Rate table to B

Microsoft Project – Tutorial 4 Assigning Resources using a Split Screen switch to the Gantt View click Task 3 (Conduct needs Analysis) click Window > Split right-click on the lower window and select Resources and Predecessors you can see the Resource Information for this task switch to the Resource Work view select task 7 (Gather Vendor Bids) click in the Resource Name column and select yourself click Okay

Microsoft Project – Tutorial 4 Assigning Resources using a Split Screen click the Next button to move to Task 8 add yourself and Emily King as Resources attached to this task click anywhere on the Gantt Chart View Print Preview click Task Usage on the View Bar Print Preview click Page Setup and the View tab click the checkboxes Print Row Totals… and Print Column Totals to add the totals to your printout save and close your file

Microsoft Project – Tutorial 4 Work, Duration and Units work = duration * units units are Resources open LAN-4-2 save it with your initials as usual click the Assign Resources button change Your Name to your name notice how the tasks are updated

Microsoft Project – Tutorial 4 Work, Duration and Units click task 3 and add the Receptionist to this task Project assumes that work is evenly distributed among units change the duration task duration to two weeks instead of one and click okay click task 2 and add yourself and Emily King as Resources change Emily King’s work hours to 8 notice that the overall task duration does not change as it is driven by your 32 hours of work

Microsoft Project – Tutorial 4 Work, Duration and Units click task 11 add 200 units of General Labour to this task 32 hours of work are created change the units to 400 (%) notice that the duration is halved undo and redo this if you do not see it

Microsoft Project – Tutorial 4 Effort-Driven Scheduling as seen in the previous example in effort-driven scheduling, duration usually changes when resources are added beyond the initial resource allocation however, in some cases, you will want to turn off effort driven scheduling and assign fixed duration tasks some tasks, such as meetings and seminars, should have fixed durations

Microsoft Project – Tutorial 4 Fixed Duration Tasks tasks can be changed to fixed duration click task 22 uncheck the Effort Driven checkbox in the Resource Work form in the lower window add your name as the initial resource your initial work calculation is 16 hours type the name Gabriel Mitchell as the second Resource Assignment and click okay notice that the duration does not change now 32 hours of work are assigned to this task type Maureen Hill as the third assignment again duration does not change

Microsoft Project – Tutorial 4 Fixed Duration Tasks go to the Resource Sheet on the View Bar give both Gabriel and Maureen initials, add them to the Project Management group and standard and overtime rates of $40/hour

Microsoft Project – Tutorial 4 Resource Usage View and Resource Information open LAN-4-2B save it with your initials as usual click the Resource Usage button change Your Name to your name and initials notice that you can expand and collapse Resource Information as usual click Install Cabling and click the Go to Selected Task button now you can see the resources attched to this task

Microsoft Project – Tutorial 4 Resource Usage View and Resource Information click the Select All button and the Hide Subtasks button (on the left of the Formatting Toolbar) click Project > Sort> by cost now sort by name filter your resources click All Resources and choose Overallocated Resources click the Go to Selected Task button notice that the overallocated resources are in red expand Gabrielle Mitchell and notice where the overallocations occur

Microsoft Project – Tutorial 4 Resource Usage View and Resource Information return to All Resources group resources by Resource Group Project > Group By: Reosurce Group > Customize Group by click the Group Assignments, not Resources checkbox change the field type to Assignments change the Cell background to Aqua and click okay save and close your file

Microsoft Project – Tutorial 4 Leveling Overallocations we just saw some overallocations where a resource was assigned more work in a given time period than it has working hours leveling means correcting such overallocations open LAN-4-3 save as usual change Your Name to your name filter for Overallocated Resources

Microsoft Project – Tutorial 4 Leveling Overallocations notice the yellow overallocation markers (!) View > Toolbars > Resource Management click the Resource Allocation View on the toolbar (first button) filter for Overallocated Resources Project > Sort > by name expand Gabriel Mitchell reduce his tasks Test Software (4h), Test Hardware (2h) and Test Security (2h) notice the changes

Microsoft Project – Tutorial 4 Leveling Overallocations switch to the Task Entry View on the Resource Management toolbar click the go to next task overallocation button several times until you reach task 16 notice that you are scheduled to do other tasks that day too increase the General Labour hours to 16 and decrease your own to zero you are no longer overallocated for this task

Microsoft Project – Tutorial 4 Leveling Overallocations go to task 26 notice that the same resources are assigned to tasks 26 and 27 on overlapping days double click Contract Trainer to open Resource info notice that 200% units are indicated this means that two contact trainers were to be hired however, only one was available reduce the units to 100% go back to the Resource Allocation View and notice that the Contract Trainer is now overallocated

Microsoft Project – Tutorial 4 The Leveling Tool Project includes a sophisticated leveling took it levels work resources, though not material resources does not adjust task durations, work entries or resource assignments levels by delaying or splitting tasks so that work can be completed by the assigned resource during available working time

Microsoft Project – Tutorial 4 The Leveling Tool splits tasks so that they are interrupted work starts and stops on the task so that there is a period of time when no work is being done on the task introduces delays to a project delay is the amount of time between the scheduled start of a task and the time when work actually begins on the task usually extends the project’s length as it moves tasks into time periods when a resource is available