STFC Technology undulator manufacture and measurement James Rochford On behalf of the Helical collaboration.

Slides:



Advertisements
Similar presentations
T Bradshaw On behalf of the SCU group 1 Status of the Superconducting Undulator Development in the UK Superconducting Undulator Workshop, Rutherford Appleton.
Advertisements

MICE RF and Coupling Coil Module Outstanding Issues Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting October 26, 2004.
Interim Design Amy Eckerle Andrew Whittington Philip Witherspoon Team 16.
STFC Technology Helical Undulator Status and 2009 Progress Dr Owen Taylor On behalf of the Helical collaboration Collaboration members ASTEC: J.A. Clarke,
STFC Technology undulator manufacture and measurement James Rochford On behalf of the Helical collaboration Nov 2008.
Magnet Cooldown Scheme 17 th February 2012 Roy Preece (STFC RAL)
ILC prototype undulator project ILC positron source meeting 31 st Jan – 2 rd feb Beijing James Rochford For the HeLiCal Collaboration.
4m Undulator Design Concepts Amanda J Brummitt CCLRC RAL On behalf of the HeLiCal Collaboration.
Undulator R & D Jim Clarke STFC Daresbury Laboratory, UK BAW-2 SLAC Jan 2011.
Status of the UK Superconducting Undulator Studies Jim Clarke ASTeC, STFC Daresbury Laboratory FLS 2012, March 2012.
MICE Superconducting Solenoids: Status and Update RAL: T W Bradshaw M Courthold J Rochford M Hills D Baynham Oxford: J Cobb W Lau S Yang MICE.
Spectrometer Solenoid Design and Procurement Review Steve Virostek Mike Green Mike Zisman Lawrence Berkeley National Lab MICE Collaboration Meeting October.
23 October 2005MICE Meeting at RAL1 MICE Tracker Magnets, 4 K Coolers, and Magnet Coupling during a Quench Michael A. Green Lawrence Berkeley Laboratory.
1 Quench study Yury Ivanyushenkov, Elwyn Baynham, Tom Bradshaw, Amanda Brummitt, Steve Carr, Andrew Lintern, James Rochford STFC Technology RAL HeLiCal.
Spectrometer Solenoid Update Steve Virostek - LBNL MICE Video Conference #129 February 25, 2010.
9 June 2006MICE CM-15 Fermilab1 Progress on the MICE Cooling Channel and Tracker Magnets since CM-14 Michael A. Green Lawrence Berkeley Laboratory.
STFC Technology Target wheel eddy current modelling James Rochford On behalf of the Helical collaboration.
Spectrometer Solenoid Fabrication & Testing Update Steve Virostek Lawrence Berkeley National Lab MICE CM24 at RAL June 1, 2009.
1 Presented at ColUSM by D. Ramos on behalf of the Cold Collimator Feasibility Study Working Group Longitudinal.
ILC Main Linac Superconducting Cryogen Free Splittable Quadrupole Progress Report V. Kashikhin for Superconducting Magnet Team.
MCTF Alexander Zlobin MUTAC Meeting 8-10 April MCTF Magnet and HTS Conductor R&D.
BNG Industrial experience on Superconducting Undulators C. Boffo, T. Gehrard, B. Schraut, J. Steinmann, W. Walter, Babcock Noell GmbH T. Baumbach, S. Casalbuoni,
Construction of Wendelstein 7-X Max-Planck-Institut für Plasmaphysik
R&D Status and Plan on The Cryostat N. Ohuchi, K. Tsuchiya, A. Terashima, H. Hisamatsu, M. Masuzawa, T. Okamura, H. Hayano 1.STF-Cryostat Design 2.Construction.
Status of CEPC Detector magnet
1 Progress On The Design And Manufacture Of The New Stator Geoff Barber Imperial College.
24 January 2014 LARP VTF Follow-up Meeting P. Kovach VTF 1 LARP Vertical Test Facility Vertical Dewar Design, Magnet Prep And Installation Paul Kovach.
Task 6: Short Period Nb 3 Sn Superconducting Helical Undulator Dr Owen Taylor Institutes Science and Technology Facilities Council (STFC) UK –Daresbury.
HPS Collaboration Meeting JLAB, May Tracker Design Status M.Oriunno, SLAC.
Arnaud Vande Craen (TE-MSC) 27/02/20131 EUCARD : ESAC Review – CEA Saclay.
Spectrometer Solenoids MICO 214 Steve Virostek LBNL February 6, 2013.
Abstract: The Muon Ionization Cooling Experiment (MICE) is an international effort sited at Rutherford Appleton Laboratory, which will demonstrate ionization.
Spectrometer Solenoid Fabrication Status and Schedule Steve Virostek Lawrence Berkeley National Lab MICE RAL October 20, 2008.
Superconducting Corrector Magnet Progress Report P. Wanderer Superconducting Magnet Div; Dec. 15, 2007 T2K US B280 collaboration meeting.
Magnet vacuum vessel w/radiation shield and cold mass in place Magnet leads (left) and the three cryocoolers on the top of the spectrometer solenoid service.
Task 6: Short Period Nb 3 Sn Superconducting Helical Undulator Jim Clarke/George Ellwood 28/11/2012.
Helical Undulator Status Jim Clarke ASTeC, STFC Daresbury Laboratory.
Spectrometer Solenoid Fabrication Update Steve Virostek Lawrence Berkeley National Lab NFMCC at LBNL January 25, 2009.
Process Definition of the Operation Modes for Super-FRS Magnet Testing CSCY - CrYogenic department in Common System, GSI, Darmstadt Y. Xiang, F. Wamers.
NEDM Collaboration Meeting, May 19, 2008 Valve Progress Steve Williamson.
Spectrometer Solenoid Update Steve Virostek Lawrence Berkeley National Lab MICE Video Conference 120 May 7, 2009.
1 Small Coolers for MICE Michael A. Green University of Oxford Department of Physics Oxford OX1 3RH, UK MICE Collaboration Meeting RAL.
Task 6: Short Period Nb3Sn Superconducting Helical Undulator George Ellwood
Spectrometer Solenoid Design and Test Results Steve Virostek Lawrence Berkeley National Lab Spectrometer Solenoid Review November 18, 2009.
Spectrometer Solenoid Background Info Steve Virostek Lawrence Berkeley National Lab MICE Spectrometer Solenoid Review: Phone Meeting October 5, 2009.
FC Status MPB 1/20 April 2014 OXFORDRALDARESBURY V. BlackmoreV. BaylissT. Hartnett J. CobbT. BradshawS. Griffiths W. LauM. CourtholdI. Mullacrane R. PreeceA.
Mike Struik / LHC-CRI INSTRUMENTATION FEEDTHROUGH SYSTEM FOR LHC MACHINE ARC QUADRUPOLE MAGNETS. 123rd LHC Vacuum Design Meeting 19 April 1999.
Date 2007/Sept./12-14 EDR kick-off-meeting Global Design Effort 1 Cryomodule Interface definition N. Ohuchi.
MICE Coupling Coil Update Allan DeMello Lawrence Berkeley National Laboratory Illinois Institute of Technology June 17, 2013 June 17, 2013.
MICE Spectrometer Solenoid Recovery Review - December 3-4, Steve Virostek MICE Spectrometer Solenoid Design and Assembly.
MICE CC Magnet Cryostat Design Overview Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory MICE CC Cryostat Design Review LBNL, February.
Bruno Vullierme Sept LHC-CC09 - 3rd LHC Crab Cavity Workshop Slide 1 CRAB CAVITY INTEGRATION CRYOGENICS INSTALLATION.
Superconducting Cryogen Free Splittable Quadrupole for Linear Accelerators Progress Report V. Kashikhin for the FNAL Superconducting Magnet Team (presented.
FC Status CM39 1/20 June 2014 OXFORDRALDARESBURY V. BlackmoreV. BaylissT. Hartnett J. CobbT. BradshawS. Griffiths W. LauM. CourtholdI. Mullacrane R. PreeceA.
Helical Undulator Programme J Rochford T Bradshaw On behalf of the HeLiCal collaboration.
SRF Operating Experience at JLab
Results from the cold test of the first QD0 prototype
Panda Solenoid Content Interface Box Cold Mass Layout Cooling Lines
MQXC Nb-Ti 120mm 120T/m 2m models
MICE Meeting at RAL, Oct-23, 2005
Yury Ivanyushenkov for the UK heLiCal Collaboration
AEGIS Magnet System.
Challenges of vacuum chambers with adjustable gap for SC undulators
Task 6: Short Period Nb3Sn Superconducting Helical Undulator
Small Coolers for MICE MICE Collaboration Meeting RAL Michael A. Green
Technical Summary - ANL
Updated concept of the CBM dipole magnet
Alignment of Main Linac Cryomodule (MLC)
Cryomodule Assembly Plan
as a prototype for Super c-tau factory
Presentation transcript:

STFC Technology undulator manufacture and measurement James Rochford On behalf of the Helical collaboration

2 Slide title Scope of presentation Current status Where we are at the moment Plans for the coming months Prototype design, manufacture, testing 4m Module design Magnet Testing and integration Assembly of 4m module First tests of the final prototype Introduction Undulator specification

3 Slide title Magnet manufacturing spec Following a pretty extensive R&D programme and modelling study the following specification was developed for the undulators: Undulator Period11.5 mm Field on Axis0.86 T Peak field homogeneity <1% Winding bore >6mm Undulator Length147 m Nominal current 215A Critical current ~270A Manufacturing tolerances winding concentricity20um winding tolerances 100um straightness100um NbTi wire Cu:Sc ratio 0.9 Winding blocck9 layers 7 wire ribbon This defines the shortest period undulator we could build with a realistic operating margin.

4 Slide title 4m Prototype 150m of undulator Module length Vacuum considerations <4m Collimation <4m Magnet R&D 2m section realistic Minimise number of modules 2 magnet sections per module Cryogenic system Magnets Bath cooled Re condensing system utilising a thermo siphon

5 Slide title Magnet manufacture

6 Slide title Magnet testing Field maps along the length of the undulator Current leads LHe undulator Stepper motor Screw mechanism Bx By Carbon fibre Tube thermal contraction~0 Consistency of logging systemSine wave pitch of – mm R(um) Particle Trajectories analysis – SPECTRA within expectations Quench testing both magnets deliver nominal field 7 th February 14 th February

7 Slide title 4m module assembly 4 meter module assembly Straightness 250um Axis alignment 1mm Condensing pot Current leads HTS leads

8 Slide title 4m module testing 1 Vac vessel closed Ln2 precooling Logging system connected First run of complete system early Sept.

9 Slide title Successful cool down and fill 4m module testing 2 Liquid-condensate Liquid-fill Fill start

10 Slide title 4m module testing 3 The 1st cool down was successful Filled system successfully Siphon operation seems good However had serious problem Large heat leak evident Rapid boil off of liquid Loss of vacuum in magnet bore (Beam tube) Liquid helium leak into magnet bore System not stable enough to put current into the magnets System had to be warmed

11 Slide title Current status Upon warming Found no leaks at 300K all <10e-10 into magnet bore Found very small leaks between He vessel –insulating vacuum <1e-8 – copper conflate seals Clear we had a cryogenic leak ! Had to remove magnets Complete strip down of the prototype

12 Slide title Current status Cryogenic leak testing Created a large open Liquid nitrogen bath To immerse magnets whilst leak testing Initially found a leak at the indium seal between magnets Fixed this by modifying the clamp arrangement Much more worryingly seem to have a leak through the magnet structure, on magnet 1 and magnet 2

13 Slide title Current status Suspected leak path The leak is strange Not at a normal interface Seems to be through the magnet torturous path through resin along copper bore to point where the magnets join Have some ideas on how to fix this There is a possibility that the bore tube has ruptured somewhere, this is really bad news! but the delay times in the leak response indicate the solder leak is much more probable Leak path Leak rate 2e-4 level on magnet 1 Leak rate 2e-7 level on magnet 2

14 Slide title Current status Further tests Tests are hard to perform Difficult to localise leak seen on magnet 2 may just be presence of leak on magnet 1 close by More tests planned to try to isolate leaks

15 Slide title Future plans Confirm leaks Confident we can fix the leak with sty cast Will check this by cooling with LN2 as for leak tests described earlier Repeat prototype build with an additional step Once the magnets are integrated in the vac vessel We will cool using the LN2 circuit and leak check prior to connecting the turret If ok we will proceed with the build Finish Rebuild of prototype Hopefully by Christmas Next cool down Power magnets to nominal current This will probably be in the new year Stability tests Warm up Bore heater tests More quench tests of magnet 2