LSM733-PRODUCTION OPERATIONS MANAGEMENT By: OSMAN BIN SAIF LECTURE 24 1.

Slides:



Advertisements
Similar presentations
Lean Manufacturing.
Advertisements

JIT, TPS, and Lean Operations
Operations Management
Lean Supply Chains Chapter Fourteen McGraw-Hill/Irwin
16 - 1© 2011 Pearson Education, Inc. publishing as Prentice Hall 16 JIT and Lean Operations PowerPoint presentation to accompany Heizer and Render Operations.
JIT, TPS, and Lean Operations
Lean Operations (JIT) Module
Lean Systems Defined Just-in-time (JIT): an older name for lean systems Toyota Production System (TPS): another name for lean systems, specifically as.
Just-in-Time and Lean Systems
Operations Management Just-in-Time Systems Supplement 12
Just-in-time.
Just-In-Time Philosophy
CSUN - Prof. David Shternberg
Class 12: Chapter 8: Lean Systems Class 12 Agenda –Review Exam question challenges –Review Grade Sheet –Discuss Classroom Performance Process –Comments.
Chapter 7 – Just-in-Time and Lean Systems Operations Management by R. Dan Reid & Nada R. Sander s 2 nd Edition © Wiley 2005 PowerPoint Presentation by.
© 2008 Prentice Hall, Inc.16 – 1 Operations Management Chapter 16 – JIT and Lean Operations PowerPoint presentation to accompany Heizer/Render Principles.
© 2006 Prentice Hall, Inc.16 – 1 Operations Management Just-in-Time and Lean Production Systems Just-in-Time and Lean Production Systems © 2006 Prentice.
JIT/Lean Operations Good production systems require that managers address three issues that are pervasive and fundamental to operations management: eliminate.
Chapter 16 - Lean Systems Focus on operations strategy, process, technology, quality, capacity, layout, supply chains, and inventory. Operations systems.
S12-1 Operations Management Just-in-Time and Lean Production Systems Chapter 16.
JIT and Lean Operations
JIT/Lean Production Chapter 13.
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Lean Systems Operations Management Chapter 16 Roberta Russell.
Transparency Masters to accompany Heizer/Render – Principles of Operations Management, 5e, and Operations Management, 7e © 2004 by Prentice Hall, Inc.,
Benefits of Lean Manufacturing: To benefit from Lean Manufacturing, the processes must be maintained consistently and correctly. Everyone involved must.
1 1 Slide Just-in-Time and Lean Production Systems Professor Ahmadi.
Operations Management BA 301 – Spring 2003 Just-in-Time Systems Supplement 12.
Operations Management
1 Chapter 16 Just-In-Time Systems. 2 JIT/Lean Production Just-in-time: Repetitive production system in which processing and movement of materials and.
JIT and Lean Operations
Transparency Masters to accompany Heizer/Render – Principles of Operations Management, 5e, and Operations Management, 7e © 2004 by Prentice Hall, Inc.,
JIT/Lean Production Chapter 13. Copyright © 2013 Pearson Education, Inc. publishing as Prentice Hall Define Just-in-Time.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. JIT and Lean Operations.
Just-in-Time (JIT) and Lean Systems Chapter 7. MGMT 326 Foundations of Operations Introduction Strategy Quality Assurance Facilities Planning & Control.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 15 JIT and Lean Operations.
The philosophy of JIT can be traced back to Henry Ford, but formalized JIT originated in Japan as the Toyota Production System. W. Edwards Deming’s lesson.
MBA.782.J.I.T.CAJ Operations Management Just-In-Time J.I.T. Philosophy Characteristics of J.I.T. J.I.T. in Services J.I.T. Implementation Issues.
© 2004 by Prentice Hall, Inc., Upper Saddle River, N.J Operations Management Just-in-Time and Lean Systems Chapter 16.
© 1997 Prentice-Hall, Inc Principles of Operations Management Just-In-Time Systems Chapter 11.
Just-in-Time and Lean Production Systems
PowerPoint presentation to accompany Operations Management, 6E (Heizer & Render) © 2001 by Prentice Hall, Inc., Upper Saddle River, N.J S12-1 Operations.
JIT – Just-In-Time Production
ISEN 315 Spring 2011 Dr. Gary Gaukler. Push and Pull Production Control “Push” system: Determines when and how much to produce based on forecasts of future.
JIT and Lean Operations
Lecture 27 Just-in-Time Manufacturing
16 - 1© 2011 Pearson Education, Inc. publishing as Prentice Hall 16 JIT and Lean Operations PowerPoint presentation to accompany Heizer and Render Operations.
MGT 563 OPERATIONS STRATEGIES Dr. Aneel SALMAN Department of Management Sciences COMSATS Institute of Information Technology, Islamabad.
Just-in-Time and Lean Systems
LSM733-PRODUCTION OPERATIONS MANAGEMENT By: OSMAN BIN SAIF LECTURE 25 1.
© 2008 Prentice Hall, Inc.16 – 1 Operations Management Chapter 16 – JIT and Lean Operations Presented by :- Robin Shweiki Supervised by: Dr Yousef abu.
“Without the Cost of Waste …”
The philosophy of JIT can be traced back to Henry Ford, but formalized JIT originated in Japan as the Toyota Production System. W. Edwards Deming’s lesson.
Lean Production and the Just-in-Time Philosophy. Lean Production Elimination of All Waste – Waste is Anything that Does Not Add Value to Product. Continuous.
1 What is JIT Inventory? The minimum amount of inventory necessary to keep a perfect system running smoothly Objective is to minimize the stock of parts.
Lecture 28 Just-in-Time Manufacturing (Continued)
JIT and Lean Operations Group Members:. JIT/Lean Production Just-in-time (JIT): A highly coordinated processing system in which goods move through the.
CHAPTER 15 LEAN SYSTEM. THE CONCEPTS Operation systems that are designed to create efficient processes by taking a total system perspective Known as zero.
Just In Time ….. Just in Time Philosophy Salient features  The notion of waste in any operating system  JIT as a philosophy of elimination of waste.
Best Performing Consulting Organization by “JIT & Lean Manufacturing” Adding Value In Totality !!
16-1 McGraw-Hill/Irwin Operations Management, Seventh Edition, by William J. Stevenson Copyright © 2002 by The McGraw-Hill Companies, Inc. All rights reserved.
16 - 1© 2011 Pearson Education 16 JIT, Lean Operations, and the Toyota Production System PowerPoint presentation to accompany Heizer and Render Operations.
JIT/Lean Production Chapter 13.
JIT and Lean Operations
Slide 16.1 Just-In-Time & Waste Reduction. Slide 14.2 What is Just-in-Time?   Management philosophy of continuous and forced problem solving  are needed.
Operations Management
Operations Management
JIT, TPS, and Lean Operations
JIT, TPS, and Lean Operations
Chapter 16 JIT, TPS, and Lean Operations.
Operations Management
Presentation transcript:

LSM733-PRODUCTION OPERATIONS MANAGEMENT By: OSMAN BIN SAIF LECTURE 24 1

Summary of last Session  Lot-Sizing Techniques  Extensions of MRP  Material Requirements Planning II (MRP II)  Closed-Loop MRP  Capacity Planning  MRP In Services  Distribution Resource Planning (DRP) 2

Summary of last Session (Contd.)  Enterprise Resource Planning (ERP)  Advantages and Disadvantages of ERP Systems  ERP in the Service Sector 3

Agenda for this Session Chapter: JIT and Lean Operations  Global Company Profile: Toyota Motor Corporation  Just-in-Time, the Toyota Production System, and Lean Operations  Eliminate Waste  Remove Variability  Improve Throughput 4

Agenda for this Session (Contd.)  Just-in-Time  JIT Partnerships  Concerns of Suppliers  JIT Layout  Distance Reduction  Increased Flexibility  Impact on Employees  Reduced Space and Inventory 5

Agenda for this Session (Contd.)  JIT Inventory  Reduce Variability  Reduce Inventory  Reduce Lot Sizes  Reduce Setup Costs  JIT Scheduling  Level Schedules 6

CHAPTER : JIT, Lean Operations 7

Toyota Motor Corporation  Largest vehicle manufacturer in the world with annual sales of over 9 million vehicles  Success due to two techniques, JIT and TPS  Continual problem solving is central to JIT  Eliminating excess inventory makes problems immediately evident 8

Toyota Motor Corporation  Central to TPS is a continuing effort to produce products under ideal conditions  Respect for people is fundamental  Small building but high levels of production  Subassemblies are transferred to the assembly line on a JIT basis  High quality and low assembly time per vehicle 9

Just-In-Time, TPS, and Lean Operations  JIT is a philosophy of continuous and forced problem solving via a focus on throughput and reduced inventory  TPS emphasizes continuous improvement, respect for people, and standard work practices  Lean production supplies the customer with their exact wants when the customer wants it without waste 10

Just-In-Time, TPS, and Lean Operations  JIT emphasizes forced problem solving  TPS emphasizes employee learning and empowerment in an assembly-line environment  Lean operations emphasize understanding the customer 11

Eliminate Waste  Waste is anything that does not add value from the customer point of view  Storage, inspection, delay, waiting in queues, and defective products do not add value and are 100% waste 12

Ohno’s Seven Wastes  Overproduction  Queues  Transportation  Inventory  Motion  Overprocessing  Defective products 13

Eliminate Waste  Other resources such as energy, water, and air are often wasted  Efficient, ethical, and socially responsible production minimizes inputs, reduces waste  Traditional “housekeeping” has been expanded to the 5 Ss 14

The 5 Ss  Sort/segregate – when in doubt, throw it out  Simplify/straighten – methods analysis tools  Shine/sweep – clean daily  Standardize – remove variations from processes  Sustain/self-discipline – review work and recognize progress 15

The 5 Ss  Sort/segregate – when in doubt, throw it out  Simplify/straighten – methods analysis tools  Shine/sweep – clean daily  Standardize – remove variations from processes  Sustain/self-discipline – review work and recognize progress Two additional Ss  Safety – build in good practices  Support/maintenance – reduce variability and unplanned downtime 16

Remove Variability  JIT systems require managers to reduce variability caused by both internal and external factors  Variability is any deviation from the optimum process  Inventory hides variability  Less variability results in less waste 17

Sources of Variability 1.Incomplete or inaccurate drawings or specifications 2.Poor production processes resulting in incorrect quantities, late, or non- conforming units 3.Unknown customer demands 18

Sources of Variability 1.Incomplete or inaccurate drawings or specifications 2.Poor production processes resulting in incorrect quantities, late, or non- conforming units 3.Unknown customer demands Both JIT and inventory reduction are effective tools in identifying causes of variability 19

Improve Throughput  The time it takes to move an order from receipt to delivery  The time between the arrival of raw materials and the shipping of the finished order is called manufacturing cycle time  A pull system increases throughput 20

Improve Throughput  By pulling material in small lots, inventory cushions are removed, exposing problems and emphasizing continual improvement  Manufacturing cycle time is reduced  Push systems dump orders on the downstream stations regardless of the need 21

Just-In-Time (JIT) Powerful strategy for improving operations Materials arrive where they are needed when they are needed Identifying problems and driving out waste reduces costs and variability and improves throughput Requires a meaningful buyer-supplier relationship 22

JIT and Competitive Advantage Figure

JIT and Competitive Advantage Figure

JIT Partnerships  JIT partnerships exist when a supplier and purchaser work together to remove waste and drive down costs  Four goals of JIT partnerships are:  Removal of unnecessary activities  Removal of in-plant inventory  Removal of in-transit inventory  Improved quality and reliability 25

JIT Partnerships Figure

Concerns of Suppliers  Diversification – ties to only one customer increases risk  Scheduling – don’t believe customers can create a smooth schedule  Changes – short lead times mean engineering or specification changes can create problems  Quality – limited by capital budgets, processes, or technology  Lot sizes – small lot sizes may transfer costs to suppliers 27

JIT Layout Table 16.1 Reduce waste due to movement JIT Layout Tactics Build work cells for families of products Include a large number operations in a small area Minimize distance Design little space for inventory Improve employee communication Use poka-yoke devices Build flexible or movable equipment Cross-train workers to add flexibility 28

Distance Reduction  Large lots and long production lines with single-purpose machinery are being replaced by smaller flexible cells  Often U-shaped for shorter paths and improved communication  Often using group technology concepts 29

Increased Flexibility  Cells designed to be rearranged as volume or designs change  Applicable in office environments as well as production settings  Facilitates both product and process improvement 30

Impact on Employees  Employees are cross trained for flexibility and efficiency  Improved communications facilitate the passing on of important information about the process  With little or no inventory buffer, getting it right the first time is critical 31

Reduced Space and Inventory  With reduced space, inventory must be in very small lots  Units are always moving because there is no storage 32

Inventory Inventory is at the minimum level necessary to keep operations running JIT Inventory Tactics Use a pull system to move inventory Reduce lot sizes Develop just-in-time delivery systems with suppliers Deliver directly to point of use Perform to schedule Reduce setup time Use group technology Table

Reduce Variability Inventory level Process downtime Scrap Setup time Late deliveries Quality problems Figure

Inventory level Reduce Variability Scrap Setup time Late deliveries Quality problems Process downtime Figure

Reduce Lot Sizes Figure – –Inventory Time Q 2 When average order size = 100 average inventory is 50 Q 1 When average order size = 200 average inventory is

Reduce Lot Sizes  Ideal situation is to have lot sizes of one pulled from one process to the next  Often not feasible  Can use EOQ analysis to calculate desired setup time  Two key changes necessary  Improve material handling  Reduce setup time 37

Lot Size Example D=Annual demand = 400,000 units d=Daily demand = 400,000/250 = 1,600 per day p=Daily production rate = 4,000 units Q=EOQ desired = 400 H=Holding cost = $20 per unit S=Setup cost (to be determined) Q = 2DS H(1 - d/p) Q2 =Q2 =Q2 =Q2 =2DS S = = = $2.40 (Q 2 )(H)(1 - d/p) 2D (3,200,000)(0.6)800,000 Setup time = $2.40/($30/hour) = 0.08 hr = 4.8 minutes 38

Reduce Setup Costs  High setup costs encourage large lot sizes  Reducing setup costs reduces lot size and reduces average inventory  Setup time can be reduced through preparation prior to shutdown and changeover 39

Lower Setup Costs Figure 16.5 Sum of ordering and holding costs Holding cost Setup cost curves (S 1, S 2 ) T1T1T1T1 S1S1S1S1 T2T2T2T2 S2S2S2S2 Cost Lot size 40

Reduce Setup Times Figure 16.6 Use one-touch system to eliminate adjustments (save 10 minutes) Step 4 Step 5 Training operators and standardizing work procedures (save 2 minutes) Initial Setup Time Step 2 Move material closer and improve material handling (save 20 minutes) Step 1 Separate setup into preparation and actual setup, doing as much as possible while the machine/process is operating (save 30 minutes) Step 3 Standardize and improve tooling (save 15 minutes) 90 min — 60 min — 45 min — 25 min — 15 min — 13 min — — Repeat cycle until subminute setup is achieved Step 6 41

JIT Scheduling  Schedules must be communicated inside and outside the organization  Level schedules  Process frequent small batches  Freezing the schedule helps stability  Kanban  Signals used in a pull system 42

Table 16.3 Better scheduling improves performance JIT Scheduling Tactics Communicate schedules to suppliers Make level schedules Freeze part of the schedule Perform to schedule Seek one-piece-make and one-piece move Eliminate waste Produce in small lots Use kanbans Make each operation produce a perfect part JIT Scheduling 43

Level Schedules  Process frequent small batches rather than a few large batches  Make and move small lots so the level schedule is economical  “Jelly bean” scheduling  Freezing the schedule closest to the due dates can improve performance 44

Scheduling Small Lots ABCAAABBBBBC JIT Level Material-Use Approach ACAAABBBBBCCBBBBAA Large-Lot Approach Time Figure

Summary of the Session Chapter: JIT and Lean Operations  Global Company Profile: Toyota Motor Corporation  Just-in-Time, the Toyota Production System, and Lean Operations  Eliminate Waste  Remove Variability  Improve Throughput 46

Summary of the Session (Contd.)  Just-in-Time  JIT Partnerships  Concerns of Suppliers  JIT Layout  Distance Reduction  Increased Flexibility  Impact on Employees  Reduced Space and Inventory 47

Summary of the Session (Contd.)  JIT Inventory  Reduce Variability  Reduce Inventory  Reduce Lot Sizes  Reduce Setup Costs  JIT Scheduling  Level Schedules 48

THANK YOU 49