M.A.P Case Study – Scott Howell In Partnership with.

Slides:



Advertisements
Similar presentations
MODULAR BUILD - Introduction a. What is Modular Build? b. Basic Components c Standard Dimensions d. Uses Cost Competitive System.
Advertisements

37 Simpsons Walk, Horsehay, Telford, Shropshire, TF4 2PA T: M: m odular A daptation P ods.co.uk Case Study – Scott Howell In.
INSULATION THICKNESS CALCULATOR. ENERGY EFFICIENCY PERFORMANCE PRINCIPLES THE BUILDING ENVELOPE Components that constitute the building envelope are:
Electrical Safety Electrical Safety In and Around the Home NUECES COUNTY Risk Management Department.
1 Energy Efficiency By Flexx Rantoa. 2 Where to save.
 Modular Installation AMARCO MODULAR. Custom Modular Designer & Manufacturer. AMARCO means a ‘BEAUTIFUL PLACE’. When I decided on the name of the business.
Housing Policy – Meeting the needs of all of the community. Michael Kirby Chief Planning Officer Lancashire County Council.
Civil Engineering & Architecture 2.3 Residential Design.
EDT Floor Plan Design-Bathrooms1 Weekend Cabin Retreat Project Designing the Floor Plan - Bathrooms Sacramento City College EDT 300.
Unit 205: Cold water systems
FACILITIES AND PROPERTY MANAGEMENT – BEMS Plant and Equipment Operating Hours.
Unit 205: Cold water systems
Members:  Carlos López  Jessica Da Costa  Lilibeth Goncalves.
The Athletic Training Room. ► Multipurpose facility designed to accommodate a variety of athletic training needs ► Accessible to both male and female.
Equipment Installation, piping & wiring Variable Water Flow System.
Housing Services Newport City Council. Housing Registers in Newport Newport City Council transferred its stock in March The Housing Management Computer.
Reduce ! Reuse ! Recycle paper, plastics, metals !
1 Business idea: Our business idea is to design & manufacture ready modular minifactories «MOLOKONT ® » for dairy production. Productivity of minifactories.
ISH Innovation 2015 Pre-wall/flushing technology
1 HVACR116 – Trade Skills Plumbing, HVAC, Electrical Overview.
713.4.DIRECT Service Service DIRECT Construction Construction Design Design Maintenance Maintenance Lighting Lighting.
BUILDING MATERIAL BUILDING MATERIAL PALESTINE UNIVERSITY chapter No.#7 Mechanical Works Dr. Ali Ibrahim Tayeh.
Reducing manual effort of up and downloading activities at Coats Odorhei.
Construction Drawing Occupational Safety and Fundamentals
EHN1 Extension – Overhead Cranes Renovation R. Rinaldesi – EN/HE 27/11/2014.
Daily routine of an engineer Javier Oñate Lagos 27 years old.
AIA Guidelines for Design and Construction of Hospital and Healthcare Facilities Presented By: Michael A. Rogers, PE
1 Homes take DUSEL NSF Preliminary Baseline Review - April 13-15, 2010 Bob Altes Engineer- ISE Water Shield Engineering Figure Courtesy PDG and LBNL Homestake.
Housing Service Review Plan for the coming period 24 November 2014.
1Page # Machine Assembly WBS 700 By: James H. Chrzanowski January 24, 2001.
HOTEL PRIDE. The client will lease out the resort for 3 to 5 years. Resort area is of ½ Acre (23,000 Square Feet). Total construction of resort 8000 square.
POSTECH H uman S ystem D esign Lab oratory Chapter 14 LIFETIME HOMES: ACHIEVING ACCESSIBILITY FOR ALL Thu. Kim, Hee-jin.
Energy Seminar A prefabricated, non-disruptive approach to whole house energy retrofit. Stock assessment, appropriate properties and implementation. John.
Timing (minutes) Learning ObjectiveMain tasks / ProcessResources / tools 5TitleStandard Operating Procedures for Power Press Machine Slide 1 5Index 
Intake Team. Who are we? We are a team consisting of Social Workers/Social Care Co-Ordinators, Occupational Therapists and Social Care Officers. Sometimes.
.  1.Leaderships in energy and environmental design (LEED). 2.Khalifa tower Environment friendly. 3.Elevators of Khalifa tower. 4.Evacuation and fire.
Pentrellyncymer Year 5 April ‘Adventurous Activities’ in the curriculum. ‘Adventurous Activities’ in the curriculum. In the curriculum children.
Lifting with Equipment During assembly operations it may be necessary to lift or move heavy equipment. The equipment used to achieve this is covered by.
Home Inspection in Atlanta GA for New Homes high-tech-inspections.com high-tech-inspections.com North America’s premier inspection service high-tech-inspections.com.
Loft Conversions Bringing you the latest in sprayfoam insulation technology.
Hayesbrook Community Pavilion. Aims St Stephen’s Church offers a variety of activities open to the whole community including Youth Clubs (Young & Old.
Gantry Crane Gantry Crane  Rosava Engineering Group presents the Gantry Crane. We provide cranes.
Design & Integration Services at the University of Florida
THE FACTORY ACT 1948.
Abernant Lake Hotel Residential April 2017.
How Completed Interiors Are Achieved: Designing & Building
Power | Case Study The Client
SAFCOL Industrialization conference
Essem Engineers Beyond the limits…
Grab Rails: Ensuring a Simple Home Mod Doesn’t Go Wrong!
Asphalt Drum Mixing Plant Asphalt drum mix plantAsphalt drum mix plant is one of the road construction machinery.This plant is well suited for the homogenous.
Carl James Type of building use
Building energy rating (BER) means the energy use for rooms and water heating, lighting as well as ventilation on the basis of standard occupancy. For.
PGL Residential Visit Monday 20th May-Friday 24th May 2019
Year 4 Residential Buckden
Arch205 building construction Introduction
Objective 7.05: RECOGNIZE technological advances in home design
UKRAINE, KYIV REGION, BARYSHIVKA plant was put into operation in 2007
14 Crow Hill Rise, Mansfield
Poswillow Suite, Children's Dental Unit
Arch205 Materials and building construction I
Heating, Ventilation and Air Conditioning HVAC
All Africa Housing (PTY) LTD
Parker domnick hunter. Safety of Electrical and
Shugborough th- 12th May Please turn off all mobile phones.
Much Woolton Catholic Primary
Stoke Medical Centre RIBA Plan.
RIBA Plan Tom Robinson sir david Swindells Vii
Instrumental Activities of Daily Living
Monday 18th May-Friday 22nd May 2020
Presentation transcript:

M.A.P Case Study – Scott Howell In Partnership with

Case Study Scott suffers from Myotubular Myopathy, a rare condition that causes weakness and wasting of muscles, confining him to a wheelchair and leaving him unable to breathe unaided. Scott requires a ventilator and the assistance of a carer 24 hours a day. Building Components was commissioned jointly by Steve Johnston of Wirral Partnership Homes and Paul Rolfe of Wirral Council to supply suitable accommodation for four year old Scott Howell. Scott’s existing home was not suitable for conversion so an extension was proposed. Building Component’s proposal was a MAP (Modular Adaptation Pod) consisting of a bedroom and wet room. The bedroom design needed to accommodate all medical equipment Scott required, this included 30 electrical items all requiring designated power outlets.

Wet Room The wet room was designed with a level access shower which was capable of accommodating a 2.0m x 900mm shower trolley.

Manufacture The M.A.P is constructed from light weight steel to meet all current building regulations and is a structural entity, however in this instance the roof strength was increased to accommodate an electrical hoist. The hoist has a capacity of 300kg.

Manufacture The project under Building Components control split into three elements. Firstly, the internal modification to the property was undertaken by WPH due to their knowledge of the housing system. Secondly, the external groundwork and installation was carried out by BC. Thirdly, the manufacture of the M.A.P was carried out by the pod manufacturer. Work started on all three elements simultaneously, TWO weeks after planning approval was given. All three elements were completed TWO weeks later. The installation then took place on the Monday of the third week.

Installation Scott was on site to see his present arrive on the back of an articulated lorry, wrapped in a big blue plastic bag. This was accompanied by an 80 tonne crane. The lift started at 10:45am and by 12:15pm the lights were on and hot water was flowing from the sink tap.

Completion Scott moved in two days later after all of his medical equipment was installed and tested.

The Client

Contact Ray Philpin 37 Simpsons Walk Horsehay Telford Shropshire TF4 2PA Ray Philpin 37 Simpsons Walk Horsehay Telford Shropshire TF4 2PA