Jennifer Livingston, P.E. ADOT – Senior Project Manager.

Slides:



Advertisements
Similar presentations
Pedestrian Considerations in Work Zones… St. Peter Main Street Reconstruct.
Advertisements

Innovative Contracting
CMGC Contracting at UDOT Program, Projects & Lessons Learned
Oklahoma Department of Transportation Susan McClune Regulatory Services.
Lander Streets and Utilities 2015 Public Meeting No. 2 McDougall & Cliff Project Area.
Dillon and Christina Project Area Lander Streets and Utilities 2015 Public Meeting No. 2.
Route 50 Widening Design/Build Project. 2  Virginia Department of Transportation  Shirley Contracting Company  Dewberry  Fairfax and Loudoun Counties.
75 Express Lanes Segment D Construction From South of Sheridan Street to North of Griffin Road Presentation to Ivanhoe Community August 27, 2014.
Utah’s Use of CMGC & Project Delivery
U.S. 33 Northern Connector Alternative
State Aid Design-Build Project Delivery for Minnesota Cities and Counties.
I-65 Added Travel Lanes Project in Tippecanoe County
SR520 Urban Partnership Project 2008 ITS Washington Annual Meeting November 12th, 2008 – Seattle Jennifer Charlebois, P.E. Tolling and Systems Project.
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Route 110 over Route 27 Design-Build Project (PIN , D900027) Town of Babylon, Suffolk County Request.
75 Express Lanes Segments A&B Construction From NW 170 Street to South of Miramar Parkway Community Meeting Presentation Tuesday April 28, 2015.
AGENDA  PROJECT HISTORY  NORTHERN SECTION UPDATE  SOUTHERN SECTION OVERVIEW  INTERCHANGES  PROJECT SCHEDULE  UPCOMING ACTIVITIES  OPEN DISCUSSION.
Phoenix International Raceway (PIR) Presented By: Nicolaas Swart Traffic Engineering & ITS Program Manager Maricopa County DOT April 26, 2006 Presented.
Chief Operating Officer Greg Johnson. 7 Million Sheets of Paper.
Office of Traffic, Safety and Technology Module 6 Specifications and Special Provisions Traffic Control Plan Development Course.
MAINTENANCE & TRAFFIC OPERATION INCIDENT MANAGEMENT.
Florida Department of Transportation District 4 TSM&O Program Advanced Transportation Management System (ATMS) Installation in South Broward County ATMS.
Design Exceptions 101 Ed Fischer, State Traffic-Roadway Engineer Mike Morrow, FHWA Field Operations Engineer Kent R. Belleque, Senior Interchange Engineer.
S.R. 144 Intersection Improvement and Road Reconstruction Project Tuesday, October 11, :30pm Presentation Neil A. Armstrong Elementary School 1000.
Determining Innovative Contracting Methods to Reduce User Costs Stuart Thompson Utah Technology Transfer Center.
March 21, 2008Westin Horton Plaza, San Diego1 ASSOCIATION OF CALIFORNIA CONSTRUCTION MANAGERS A County Office Perspective Thomas Silva: Facilities Planning.
2005 AASHTO Value Engineering Conference Using VE in Design Build Presented by: Jerry R. Blanding Innovative Contracting Engineer FHWA – NRC July 21, 2005.
Design Build, Job Contracting, or Construction Manager at Risk In early 2000 the legislators added an alternate way to accelerate construction project.
 Do you have an Interest in Math and Science?  Do you have good problem solving skills?  Do you approach problems in an analytical manner?  Can.
Dr. Ralph Ellis Click to edit Master title style Click to edit Master subtitle style 1 Dispute Review Board Value Contributions Ralph Ellis, P.E., Ph.D.
Community Development Customer Service...and more good stuff Council Goals & Objectives Prosperity 2021 Reorganization 2010 Customer Service.
Brett Hondorp Alta Planning + Design. Suggested Routes to School Details Primary Goals 1.To develop suggested route maps for 18 elementary and middle.
1 Dixie ITS Architecture Study Section ? Utah ITS History.
TH 2 – Wilton Bridge Replacement Design-Build Project S.P March 5, 2009 Todd Vonasek, P.E. Mn/DOT Project Manager PROJECT INFORMATIONAL MEETING.
I4Ultimate.com: the I-4 Ultimate website TransComm2015 Awards 9a) Website, with consultant.
The RFP: How to Manage the Process Bob Yecke Assistant Director, University Unions University of Michigan Ann Arbor.
Broward Complete Streets Technical Advisory Committee (TAC) Meeting Monday August 10, 2015.
Project Scoping Fundamentals Alan Lively Project Delivery Specialist Local Government Section April 6, 2010.
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Superstructure and Bridge Replacements in Region 9 Design-Build Project (PIN , D900020) Broome, Delaware,
Condition Assessment & Funding Needs for North Carolina’s Highway System Report to the Joint Legislative Transportation Oversight Committee December 12,
PROJECT SCOPING FOR LOCAL AGENCY FEDERAL AID PROJECTS.
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Superstructure and Bridge Replacements in Regions 2 & 9 Design-Build Project (PIN , D900022) Herkimer,
Interstate 95 Corridor Improvement Program June 20, 2012.
Purpose of Work Shop Share Ohio’s experience with a full closure reconstruction: the rationale, challenges, implementation and benefit.
WELCOME! July 31, 2012 ODOT District July 31, 2012 PURPOSE OF TONIGHT’S MEETING Introduce the project –Reconstruct I-75.
1 Some Findings on Public Outreach for Work Zones.
Elk Run Interchange Design-Build Project S.P (TH 52) Elk Run Interchange Design-Build Project S.P (TH 52) PROJECT INFORMATIONAL MEETING.
Southeast Michigan Council of Governments. Working Together to Improve Regional Operations through Traffic Incident Management Working Together to Improve.
Tom Norton, Executive Director Colorado Department of Transportation American Association of State Highway and Transportation Officials September 9, 2003.
Elk Run Interchange Design-Build Project S.P (TH 52) Elk Run Interchange Design-Build Project S.P (TH 52) PROJECT INFORMATIONAL MEETING.
Safe & Sound Bridge Improvement Program. Purpose of Meeting Introduction of Team Today’s discussion  History of Safe & Sound  DBFM to MDBB/DB split.
LACCD Building the Future THOMAS HALL Director Facilities Planning and Development.
VT 100 over the Mad River Bridge Replacement July 13, 2015.
California 511 Statewide Workshop #7 March 3-4, 2008 Caltrans “provides its travel information directly to the public, through commercial/media information.
2015 HURRICANE SEASON PREPARATIONS March 18, 2015.
Work Zone Operational Enhancements Jennifer Livingston, P.E. ADOT – Senior Project Manager.
The Importance of Public Participation and Outreach in Project Development Gary Flunoy – Business Outreach/Public Involvement Coordinator August 27, 2009.
Design-Build in Minnesota Minnesota Department of Transportation.
Washington Street Boat Landing Pergola Restoration Design-Build Project Design-Build RFQ – Pre-Submittal Meeting Jeff Lundstrom, SDOT Project Manager February.
Maintenance and Temporary Traffic Control
11 Ina Road Traffic Interchange Project Update Marana Chamber of Commerce Business Connection Luncheon May 18, 2016 Greg Byres, PE, Senior Urban Project.
Project Overview and Stakeholder Outreach
CITY OF HALLANDALE BEACH
ACEC INDIANA Environmental Business & Funding Source Conference
FOR LOCAL AGENCY FEDERAL AID PROJECTS
BUS 501 Education for Service-- snaptutorial.com.
BUS 501 Teaching Effectively-- snaptutorial.com
Florida Transportation Commission FY 2009
FOR LOCAL AGENCY FEDERAL AID PROJECTS
Walker Street Reconstruction Project 25% Design Public Hearing
Ron Hancock, PE NCDOT State Construction Engineer
Presentation transcript:

Jennifer Livingston, P.E. ADOT – Senior Project Manager

Location of State Route 68

Introduction to the Corridor  No reasonable alternate routes  Commercial trucks  Variable users  Daily commuter traffic

SR 68 Project  $42 Million reconstruction of 13.7 miles  New alignment (2-mile section)  New bridges/wildlife crossings  Truck escape ramps  440 Contract days

Design-Build vs.Traditional Contract Method  Design-Bid-Build: Design is complete before construction can begin  Design-Build: Design and construction occur simultaneously

Why Design-Build for SR 68  Importance of the corridor  Project in ADOT’s 5-year plan  Partnerships – local jurisdictions – BLM  Design-Build legislation  Support

Selection Process  Request For Qualifications (RFQ)/ Request For Proposal (RFP)  2 step process  7 firms responded to RFQ  3 firms short listed for RFP

Selection Criteria  Oral Interview  Proposal Elements  Responsiveness: Design management, quality, public relations, mitigation  Innovation: Schedule, constructibility, elimination of design exceptions  Construction: Construction management, MOT, safety

 Measures actual travel time  $400,000 incentive Camera at Milepost 2 Camera at Milepost 15 SR 68 Travel Time System

Video images from the two sets of CCTV’s are received by the computer. Travel Time is computed for each 10-minute interval. Video imaging system and tag recognition provided by Computer Recognition Systems Tel: Contact: Donald Wade or Salvatore D’Agostino SR 68 Travel Time System Golden Valley MICROWAVE One set of CCTV’s at MP 2 One set of CCTV’s at MP 12 Bullhead City Construction Office

Lane Rental  $1 M incentive

Motorist Assist Patrol (MAP)  Partnership with FHWA  Security company  Surveys  Contract requirements  Experience, tools, safety…

Quality Workmanship Program  $500,000 incentive  Based on checklist and criteria

Checklist

Conformance Criteria Workmanship Inspection Checklist Categories Checklist Performance Goals Measurement by Examination Dimensional Measurement A) Safety: Goal=97.5 Percent Conformance Safety MOT 701 SWPPP 810 Guardrail 905 GET 905 (Develop as required) B) Operability: Goal=95.0 Percent Conformance Pipes 501 Fencing 903 Signs 608 Concrete Barrier 910 Catch Basins Concrete Structures 601 Drilled Shaft 609 Electrical 732 Concrete Curb, Gutter Sidewalk 908 Rip Rap 913 Reinforcing steel tolerances Reinforcing steel cover Concrete member dimensions (Others as required) C) Durability and Appearance: Goal=90.0 Percent Conformance Grading 203 AB 303 Tack 404 Misc Structural 409 Superpave 417 Concrete Materials 1006 Concrete Curing 1006 ACFC 414 (Develop as required) D) Management: Goal=90.0 Percent Conformance Bulletin Boards Survey 925 Contractor QC (Develop as required)

Public Information Campaign –Over 25 presentations given to Kingman, Bullhead City and Laughlin civic organizations  Brochure  Project Update Newsletters  Hotline  Web page  Construction alerts  Speakers bureau

Public Information Campaign  Media coordination  TV, radio, newspaper  Elected officials  TSM committee  Site visits by local elementary students

BLM Coordinator  BLM employee on project full time  Primary responsibilities include permits and environmental concerns

Benefits of Design-Build  Helps to develop, start and finish projects early  Encourages the contractor and ADOT to build relationships and teams  Through the lane rental and travel time incentive, the contractor had a stake in keeping the traffic moving through the project

Jennifer Livingston, P.E. ADOT – Senior Project Manager