Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.

Slides:



Advertisements
Similar presentations
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Advertisements

Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Proposal to Change the UNC AQ ‘Backstop Date’ to accommodate the 2010 Seasonal Normal Review DESC – 2nd October 2009 NOTE: Instances where TBC is stated.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
UNC Modification Proposal Revised Timescales for LDZ Shrinkage Arrangements Simon Trivella – 25 th September 2008 Distribution Workstream.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Project Nexus Workgroup 9 th September Background During detailed design a number of areas have been identified that require clarification with.
Operating Margins. 2 Competitive Provision of Operating Margins Change to National Grid Gas’s Transporter Licence which:  Introduced Special Condition.
DESC Action DE0301 & DE0302 (New Project Nexus Allocation Algorithm) 4th April 2012.
AQ Overview.  Annual Quantity (AQ) is a value held for each meter point that reflects the expectation as to the volume of gas that a meter point will.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Amendments to NTS Shrinkage Reporting Process Nick Reeves.
“Introduction of a New Shipper Obligation in Relation to the Procurement of Gas Below the Gas Safety Monitors” Transmission Workstream 4 th Jan 2007 Chris.
UNC Mod 392/ IGT Mod 040 Proposal to amend Annex A of the CSEP NExA table, by replacing the current version of the AQ table August 2011.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Mod 0333: Update of default System Marginal Prices Review Group August 2010 Transmission Workstream 07/10/2010.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
UNC (Urgent) Modification Proposal 0044: “Revised Emergency Cash-out & Curtailment Arrangements” UNC Transmission Workstream 11 th August 2005.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
OPNs & LDZ Demand Forecasts Chris Shanley & Nick Reeves.
Review Group Modification Proposal Introduction of Enduring NTS Exit Capacity Arrangements.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Proposer: Hayley Burden Panel Date: 17th April : Mod Title: Imbalance Charge amendments required to align the UNC with the Network Code on Gas.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Emergency Cashout Prices and Emergency Curtailment Quantity (ECQ) Adjustment Ritchard Hewitt Gas Code Development Manager.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Agency Charging Statement Overview of Consultation 11 th February 2008.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Dato - Dok.nr.1 User Group on balancing 12 September 2013 Energinet.dk.
Demand Side Investment Planning Transmission Planning Code Workshop 2 1 st May 2008.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Exit Capacity Release Methodology Statement - ExCR Transmission Workstream – 5 th Feb 2009.
UNC Modification Proposal 0380 Periodic Annual Quantity Calculation Calculation of Daily Supply Point Capacity Alan Raper – DNCMF 26 th September 2011.
MOD Proposal 0224 Facilitating the use of AMR in the Daily Metered Elective Regime 28 May 2009 Code User Pays Services.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
European Developments Transmission Workgroup 3 rd May 2012.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
DN Interruption Reform Transmission Workstream Mark Freeman 5 th April 2007.
EU Phase 2 Delivery & UK Link Programme; Impacts on Gemini Process European Workgroup 1 st May 2014.
UNC Modification Proposal 0097: Modification to release aggregated ex-post information for pipeline interconnector offtake flows Christiane Sykes E.ON.
FGO: ASA Service Line Review
UNC Modification Proposal 0202 National Grid Distribution
Review of Demand Estimation Times for Modification Proposal 461
EU Implementation Programme
Transmission Workstream 4th July 2007
Rebecca Knight Mod 644 UIG Analysis.
Proposer: National Grid NTS Panel Date: 17th April 2014
Publication of Zonal Flex Data
UNC Mod 392/ IGT Mod 040 Proposal to amend Annex A of the CSEP NExA table, by replacing the current version of the AQ table August 2011.
Modification proposal 330
Proposer: Debbie Brace Panel Date: 20th March 2014
Transmission Workstream - EU 3rd Package Update
Nexus Workgroup Mod 0473 Presentation
Mod 0489 EU Balancing Code - Information Provision changes required to align the UNC with the EU Code Debbie Brace 25th April 2014.
Presentation transcript:

Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight line. Mod 0489 EU Balancing Code - Information Provision changes required to align the UNC with the EU Code Debbie Brace 3 rd April 2014

Content  EU Gas Balancing Code sets out the information to be provided by Transmission System Operators (TSOs) to Network Users and the obligations of the Transmission System Operator (TSO), Distribution System Operator (DSO) & Forecasting party in this area.  GB regime provides information in line with the EU Code. However, there are some impacts:  1. Non Daily Metered Allocation (NDMA)  2. NDMA Accuracy report  3. Initial allocation 2

3 1. NDMA

NDM Forecast (aka NDMA) Methodology  EU Code Article 42 - Information obligations of the forecasting party(-ies) The methodology for the forecast of a shipper’s non daily metered offtakes shall be based on a statistical demand model, with each non daily metered off-take assigned with a load profile, consisting of a formula of the variation in gas demand versus variables such as temperature, day of week, customer type and holiday seasons. The methodology shall be subject to consultation before its adoption.  Uniform Network Code Section H A "Short Term Demand Model" is a mathematical model established by the Transporters on the basis of historic demand and other data, which estimates (at a given time) for an LDZ and the Total System and for any Day demand, by reference to data including: (a) forecasts of temperature and wind speeds for the Gas Flow Day or the remainder thereof; (b) recorded temperature and wind speeds for the Preceding Day and (where relevant) the Gas Flow Day up to the time of forecasting; and (c) actual demand (assessed by reference to gas flows at NTS/LDZ Offtakes adjusted for estimated changes in LDZ stock) for the Preceding Day and (where relevant) the Gas Flow Day up to the time of forecasting. 4

NDM Forecast Requirement  36.1 (a) – “ On gas day D-1, the transmission system operator shall provide the shippers with a non daily metered derived forecast for gas day D no later than 12:00UTC or, when daylight saving time is applied, 11:00UTC.”  36.1 (b) – “ On gas day D, the transmission system operator shall provide the shippers with a minimum of two updates of the forecast of their non daily metered off-takes  36.2 The first update shall be provided no later than 13:00 UTC (winter time) or 12:00 UTC (daylight saving).  36.3 The time of the second update provision shall be defined upon approval by the national regulatory authority and published by the transmission system operator….. 5

6 NDMA Process  Non-Daily Metered Allocation Process (NDMA)  Gemini calculates the NDMA using LDZ demand forecasts and weather forecasts UNC (Required by time)NG NTS Run Time EU Balancing CodeCompliant *D-1: 14:00D-1: 13:05D-1: 12:00 D-1: 18:00D-1: 16:00 D-1: 02:00D-1: 00:00 D: 12:00D: 10:00D: 13:00 (latest) D: 15:00D: 13:002 nd to be agreed with NRA D: 18:00D: 16:00 D: 21:30D: 20:45 D: 02:00D: 00:00 * Affected UNC time due to EU Balancing Code

Current UNC NDMA Inputs 7 Input Temperature, Wind Speed, Demand (Future & Historic)

Future – Project Nexus  The proposed Project Nexus Modifications change the NDMA process but the timings of the NDMA are not being changed  The proposed Project Nexus changes aim to increase the accuracy of the future NDMA process amongst other things 8

9 NDMA – Proposed Solution  Keep the existing UNC D-1 14:00 and add an additional NDMA publication at D-1 12:00  Is this agreeable?  Default NDMA forecast methodology proposed to mitigate any missing input data (current process or post Nexus) - use last available NDMA data item  Is this suitable?

10 2. NDMA Accuracy Report

NDMA Accuracy Report Article 42. Information obligations of the forecasting party(-ies)  A report on the accuracy of a shipper’s non daily metered off-takes shall be published by the forecasting party at least every two years. 11

Accuracy Report – Proposed Solution (1)  Report should be published annually - consisting of 12- months of data  Is an annual publication suitable?  The report should show a daily comparison of NDMA forecasts to the D+1 (initial) & D+5 (final) allocations  Is there a preference for D+1 or D+5, or both?  Proposed that the NDMA forecasts at D-1 14:00, D 12:00 & D18:00 be used  Are these NDMAs the right ones to use? 12

Example of data to be collated  As explained the report could contain comparisons between:  D-1 14:00 forecast and D + 1 allocation & D + 5 allocation  D 12:00 forecast and D + 1 allocation & D + 5 allocation  D 18:00 forecast and D + 1 allocation & D + 5 allocation  For example:

Accuracy Report – Proposed Solution (2)  Xoserve to provide a high level commentary within the report (summary of the relevant information, findings and advice)  Is this agreeable?  Proposed that the report is published on NG and /or Xoserve website  Is there a preference for either website, or both? 14

15 3. Initial Allocations

3. Initial Allocation  EU Code requires that “no later than the end of gas day D+1, the TSO shall provide each shipper with an initial allocation for it’s inputs and off-takes on day D and an initial daily imbalance quantity”  UNC mod required to change timing stated in E1.6.2 to provide data before end of 1 st day after gas day rather than 2 nd day after gas day as stated in UNC  We do not believe that any system changes are required as the info is already provided in line with EU 16

Any questions  Any Questions? For further information please contact me on or 17