The Australian Energy Regulator Expenditure Forecast Assessment Guidelines Applications of Economic Benchmarking Techniques 6 June 2013.

Slides:



Advertisements
Similar presentations
Nuttall Consulting. Purpose overview of the form and use of the AERs repex tool Not Detailed reference material on the underlying spreadsheets Defence.
Advertisements

Purpose overview of the form and use of the AER’s augex tool Not
Managerial Accounting: An Introduction To Concepts, Methods, And Uses Chapter 6 Financial Modeling for Short-Term Decision Making Maher, Stickney and Weil.
The Australian Energy Regulator Expenditure Forecast Assessment Guidelines Opex base-step-trend 8 May 2013.
Better Regulation workshop on Rate of Return Guidelines
Presentation Subject Header Connected for Success Appendix C- Audit Requirements Economic Benchmarking Backcast Data Template.
The Australian Energy Regulator Expenditure Forecast Assessment Guidelines General discussion of draft guidelines 2 September 2013.
TNSP Outputs for Use in Economic Benchmarking AER Economic Benchmarking Workshop #2 14 March 2013 Denis Lawrence and John Kain.
Trends in Infrastructure Investment Eighth ACCC Conference Sanctuary Cove, 27 July 2007 Jeff Balchin Director.
Benchmarking and efficiency mechanisms Stephen Clark - A/GM Connections & Development Transend Networks.
The Australian Energy Regulator Public Forum April 29 Expenditure incentive guidelines Presentation on key issues.
Capital Budgeting and Financial Planning
The Australian Energy Regulator Expenditure Forecast Assessment Guidelines Interactions with incentive frameworks.
Systems Analysis and Design 9th Edition
Better Regulation Expenditure Forecast Assessment Guideline 12 February 2013.
Chapter 12 - Forecasting Forecasting is important in the business decision-making process in which a current choice or decision has future implications:
RPI-X: Forecasting costs Regulation and Competition John Cubbin.
The Australian Energy Regulator Expenditure Forecast Assessment Guidelines Expenditure assessment guideline and process 13 June 2013.
The Australian Energy Regulator SA Electricity distribution determination 2015–2020 Consumer/stakeholder forum 3 September 2014.
Introduction ► This slide deck provides a suggested framework for the financial evaluation of an investment project. When evaluating any such project,
1 Draft Statement of Regulatory Principles Consultation ‘Fostering a Stable Investment Environment’ Philip Gall, Manager/Regulatory Affairs TransGrid March.
The Australian Energy Regulator Expenditure Forecast Assessment Guideline Category analysis Connections and Customer Driven Works.
Better Regulation workshop transmission outputs and environmental factors.
Unit 5 An introduction to accounting
VENCorp Revenue Proposal 1 July 2008 to 30 June 2014 Initial Public Forum Presentation.
Investigation into evidence for economies of scale in the water and sewerage industry in England and Wales Presentation of Findings Water UK City Conference,
Draft decisions Access Arrangements for APT Allgas and Envestra (Qld) Warwick Anderson General Manager, Network Regulation 1 March 2011 Public.
Copyright © 2008 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin 12 Financial and Cost- Volume-Profit Models.
Better Regulation: Expenditure assessment and incentives 29 April 2013.
The Australian Energy Regulator. Today’s agenda Presentations from : ◦AER – Sebastian Roberts, General Manager Networks ◦Consumer challenge panel – Robyn.
Productivity-based Regulation: The New Zealand Experience Presentation to 8 th ACCC Regulatory Conference 26 July 2007 Denis Lawrence.
Australian Energy Regulator Predetermination conference: AER draft decisions on NSW electricity distribution regulatory proposals December 2014.
The Australian Energy Regulator SA electricity distribution determination 2015–2020 Framework and approach Presentation to the Energy Consumers’ Council.
Income Benchmark Applied Inclusive Growth Analytics Course June 29, 2009 Leonardo Garrido.
BSc Economics and related programmes Economics of Competition and Regulation EC 3015 Week 9: Costs in Price Cap Regulation.
The Australian Energy Regulator Economic benchmarking TNSP outputs data.
The Australian Energy Regulator Public Forum NSW electricity distribution & transmission revenue proposals July 2014.
The Australian Energy Regulator Expenditure Forecast Assessment Guidelines Auditing requirements for RINs and economic benchmarking data 9 October 2013.
Better Regulation workshop distribution outputs and environmental factors.
Getting Ready! Potential issues for consumers Ergon Distribution Network Regulatory Proposal Bev Hughson, Consumer Challenge Panel (CCP) 2 September 2014.
The Australian Energy Regulator Expenditure Forecast Assessment Guideline Category analysis Connections and Customer Driven Works.
Modeling the Market Process: A Review of the Basics Chapter 2 © 2004 Thomson Learning/South-Western.
The Australian Energy Regulator Economic benchmarking DNSP outputs and environmental factors.
Getting Ready! Potential issues for consumers Queensland Distribution Network Regulatory Proposals Bev Hughson, Consumer Challenge Panel (CCP) 8 August.
Modeling the Market Process: A Review of the Basics Chapter 2 © 2007 Thomson Learning/South-WesternCallan and Thomas, Environmental Economics and Management,
Better regulation workshop Economic benchmarking inputs.
Public Forum 10 December 2014 SAPN Regulatory Proposal Bev Hughson Consumer Challenge Panel Member.
PRESENTATION ON FINANCIAL COMPONENT OF A BUSINESS PLAN BY AHMeD Hussain Khan.
Copyright  2006 McGraw-Hill Australia Pty Ltd PPTs t/a Management Accounting: Information for managing and creating value 4e Slides prepared by Kim Langfield-Smith.
15 October 2013 Briefing on draft s 56G report on the effectiveness of information disclosure regulation at Christchurch Airport.
Briefing for financial market analysts 30 April 2013 Draft report on the effectiveness of information disclosure regulation at Auckland Airport.
Default price-quality paths for gas pipeline services Briefing on the Commission’s final decision for financial market analysts 28 February 2013.
Capex Regulation in Australian NEM NZ Commerce Commission workshop – March 2010.
Benchmarking for Improved Water Utility Performance.
Transmission Pricing Webinar 12 October Agenda for Webinar Introductions Purpose Potential Areas of Change – Overview –Revenue Proposal –Business.
Comparison of Estimation Methods for Agricultural Productivity Yu Sheng ABARES the Superlative vs. the Quantity- based Index Approach August 2015.
Gas Stakeholder meeting for the IM review and DPP reset 8 December 2015.
Economic Benchmarking vs Financial Incentives – an alternative to incentivising performance in the gas industry? Ashley Muldrew, Gas Speak 2015.
The Australian Energy Regulator Economic benchmarking Input data.
Top-down models of operating and capital expenditure.
The Australian Energy Regulator SA electricity distribution determination 2015–2020 Framework and approach 20 November 2013.
Examples of capital expenditure models. Overview 2 Capex models developed and used by a number of regulators internationally Most commonly used as part.
Revised draft decision: Initial default price-quality paths for gas pipeline services Briefing for financial market analysts 24 October 2012.
Initial observations on the Initial Observations Nathan Strong Chair, ENA Default Price Path Working Group.
Draft Decision on the Reset of Prices for Electricity Distribution Businesses Presentation to Market Analysts 19 July 2011.
Profitability Analysis
Forecasting Methods Dr. T. T. Kachwala.
Question and answer session
Gas default price-quality path reset 2017
THE COST OF CAPITAL.
Presentation transcript:

The Australian Energy Regulator Expenditure Forecast Assessment Guidelines Applications of Economic Benchmarking Techniques 6 June 2013

Agenda 1:30 Introduction 1:50 Total expenditure applications 2:50 Break 3:00 Opex applications 3:50 Break 4:00 Data, model validation and timeframe 4:55 Summary & next steps 2

Where are we today? 3 DateSubject 13 MarchDNSP outputs and environmental factors 14 MarchTNSP outputs and environmental variables 20 MarchNSP inputs 30 AprilMeasurement – DNSP outputs and environmental variables 2 MayMeasurement – TNSP outputs and environmental variables 7 MayMeasurement - NSP inputs 6 JuneApplications of economic benchmarking techniques 13 JuneScope of the guideline and expenditure setting process

Context for today Today is the final economic benchmarking workshop In response to questions raised early on in the process this workshop will provide clarity on the proposed application of EBT After this workshop, in light of submissions and workshop discussions, the team will develop the draft guidelines 4

Objectives for today (1) Take stakeholders through the models sent around on Wednesday last week Seek stakeholder views on how EBT can be used:  in the first pass to diagnose an expenditure proposal  to test whether an NSP is responding to the incentive framework 5

6 Objectives for today (2) Seek stakeholder views on how EBT can be used:  to test and estimate base year opex  to measure the opex rate of change Seek stakeholder views on:  data  testing and validation process  timeframes

Respond to stakeholder questions (ENA, Grid Australia) ◦Testing and validation process ◦Timeframes for data, governance, public reporting ◦AER’s presumption of future productivity gains ◦Opex assessment decision tree proposed by ENA will be addressed in workshop on process next week —>WACC? Our initial position is to use the most recently determined WACC 7 Objectives for today (3)

Applications – total expenditure 8

Total expenditure applications Instead of a technical model review, today’s workshop is structured around the potential applications of EBT ◦First pass — diagnosing drivers of productivity ◦Is an NSP responding to the incentive framework? After presentation, we hope to have a structured discussion about the role of EBT in answering these questions 9

Total cost assessment - overview Data Scope of the Model Technique overview (e.g., MTFP, DEA) Benchmarking results How to test whether an NSP is responding to the incentive framework? ‘First pass’ assessment — implications for the assessment of an NSP’s expenditure proposal 10

Dataset ◦13 hypothetical NSPs ◦Six years of data ◦Two outputs and four inputs Scope ◦The model is merely illustrative ◦The model does not:  Identify a preferred input-output specification  Undertake sensitivity analysis  Consider appropriate benchmarks  Test alternative benchmarks 11 Dataset and scope

Index-number-based method that calculates weighted average output relative to weighted average input MTFP allows comparison of both productivity levels and growth rates In the Model, it has been used as a primary tool to examine overall cost efficiency (or productivity) In practice, a holistic approach to the use of benchmarking method may be adopted 12 MTFP

Non-parametric approach that uses linear programming to estimate an efficient industry frontier It can provide decomposition of cost efficiency into sources such as technical efficiency and allocative efficiency In the Model, it has been used to cross-check MTFP results and examine potential sources of cost inefficiency In practice, it can be used jointly with other methods to directly inform regulatory decisions ◦ 13 DEA

Illustration of efficiency concepts 14 Capital input Opex A C Isocost line C 0 Locus of minimum input- use points to produce given output Q 1 A’ A” Isocost line C 1 O

NSP-1: aggregate output, input and TFP indexes 15

16 NSP-8: aggregate output, input and TFP indexes

Incentive implications EB results may be used to review whether an NSP is responding to the incentive framework An NSP may not be responding to the incentive framework where it: ◦performs poorly compared to its peers; and ◦has failed to improve over time (by catching up with and improving along with the frontier) 17

18 TFP comparative performance

First–pass assessment EB results provide a high-level review of: ◦relative efficiency of historical NSP expenditure (in terms of total costs) ◦trend efficiency and productivity growth They can be used to calculate the path of total costs using an aggregate rate-of-cost-escalation formula ◦ The rate of change captures output growth and input price change net of potential productivity and efficiency gain ◦ This provides a reference set of total cost forecasts to compare the NSP’s forecast expenditure under BBM 19

TC rate-of-change calculation In the Model, the annual rate of productivity and efficiency growth over the forecast regulatory period is assumed to be the sum of: an efficiency improvement factor – The NSP-specific overall cost inefficiency is assumed to be gradually removed over the next 20 years; a productivity growth factor based on observed industry productivity change In regulatory practice, careful consideration of potential productivity and efficiency changes that can be achieved by individual NSPs over the forecast regulatory period is important 20

21 Comparing total cost forecasts

TC benchmarking outcomes 22

Implications for the assessment of expenditure proposal If EB results suggest that: ◦an NSP appears to be relatively inefficient in relation to historical expenditure; and/or ◦its proposed forecasts are materially higher than what is required by an NSP with strong incentives to operate efficiently; and If this finding is supported by other high- level assessment results (e.g., category analysis) Then further investigation into proposed expenditure may be required 23

First pass ◦How should the AER account for finding that a firm is not close to the frontier in assessing a regulatory proposal? ◦Is the TFP change expected in the forecast period relevant? ◦Total cost rate of change – over what period is it reasonable to expect to see efficiency catch up on the capital stock? 24 Discussion points (1)

Discussion points (2) Is an NSP responding to the incentive framework?  The NSP’s productivity performance compares poorly to its peers (i.e. it is a long way from the efficient frontier) and it fails to catch up over time  The NSP’s productivity performance remained constant or declined over time while that of other NSPs continued to grow. Issues arising from presentation 25

Applications – operating expenditure 26

27 Opex lends itself to econometric assessment techniques Focused on inputs that can be changed in short-run ◦Econometric model able to produce top down opex forecast relevant to base year assessment ◦Rate of change potential substitute for existing opex trending method Operating expenditure applications

Opex assessment - overview Technique overview Results: ◦base-year opex efficiency ◦opex partial productivity growth rates  forecast opex rate of change Implications for the assessment of an NSP’s expenditure proposal 28

Opex cost function modelling can assess: ◦base-year efficient opex; and ◦opex partial productivity growth rates In the Model, a simple opex cost function has been estimated for illustrative purposes This follows Economic Insights (2012) Economic Insights (2012), Econometric Estimates of the Victorian Gas Distribution Businesses’ Efficiency and Future Productivity Growth, Report prepared for SP AusNet, 28 March Opex cost function modelling

30 Measuring opexefficiency Measuring opex efficiency For each NSP, predicted opex is compared with actual opex to measure opex efficiency If predicted opex >= actual opex, then opex efficiency is equal or above one If predicted opex the NSP performs relatively inefficiently after allowing for operating environment effects

31 Opex efficiency of NSPs

Are the findings supported by results from other assessment tools? For those NSPs found to be efficient, there is less need to conduct further investigations => revealed cost approach Where an NSP’s base-year opex is found to be inefficient by a wide margin, then there may be a need to undertake further investigation => adjustment to base- year opex may be warranted 32 Implications of opex efficiency

33 Measuring opex partial productivity growth rate Opex partial productivity growth rate can be derived using the parameter estimates from the modeling It is measured as the sum of: ◦technical change ◦returns-to-scale effect ◦business condition change effect (incorporating both capital changes and operating environment changes)

Forecasting opex rate of change The results informs on opex productivity and efficiency improvement potential of an NSP ◦one-off or glide-path adjustment to remove opex inefficiency ◦opex partial productivity change The AER applies a ‘base-step-trend’ opex analysis, under which base-year efficient opex is escalated for: ◦output growth; ◦opex price escalation accounting for partial opex productivity change; ◦‘step changes’ The level of recurrent opex in a year is 34

Implications for opex assessment The results provide an alternative set of opex forecasts to: ◦opex proposed by the NSP ◦Opex determined under the ‘revealed cost’ For those NSPs found to be inefficient or proposing significantly higher opex forecasts, further investigation may be required in order to explain discrepancies in opex forecasts under alternative approaches 35

Opex benchmarking outcomes 36

Econometric model of opex — focused on short run ◦What capital input and operating environmental factors are most material to opex?  DNSPs  TNSPs ◦For example — asset age, weather, outages 37 Discussion points (1)

Discussion points (2) Top down opex forecast ◦How should the AER incorporate this into its assessment of opex?  Where an NSP appears to perform well (revealed costs)?  Where an NSP doesn't appear to perform well (further review, reliance on top down forecast)? Rate of change ◦Should the AER provide all NSPs with the average technical change, or ◦should there be different rates of change for different NSPs? 38

Data and testing 39

Data EBT data requirements appear less onerous than category analysis Appears data can be extracted from existing systems (although some assumptions may have to be made) ◦opex, capex, assets, customers, reliability, weather, line length, capacity Is this a reasonable presumption? If not, what data is not readily available? 40

Timeframe Data requirements likely to be close to Economic Insights briefing note specification Our initial impression is that this can be backcast without great difficulty. Eight years desirable (ie back to 2005). It would be desirable to obtain this data this year and undertake data testing & validation early 2014 Do you see any problems with this schedule? 41

Testing and validation process 42 Once data is received, a testing and validation process would: ◦test specifications, and ◦test data Should the AER conduct such a process, or should the AER just conduct this as a matter of course during resets? If so, what should this process involve?

Summary and next steps 43