NSF Division of Astronomical Sciences AAAC October 15-16, 2009 Craig Foltz.

Slides:



Advertisements
Similar presentations
Federal Demonstration Partnership Meeting August 2010 Washington, DC.
Advertisements

OFFICE OF SCIENCE 1 Large Synoptic Survey Telescope News since the February update Astronomy & Astrophysics Advisory Committee Telecon May 2012 Fred Borcherding/Nigel.
Directorate for Mathematical and Physical Sciences Facilities and Cyberinfrastructure April 2, 2014 Advisory Committee for Cyberinfrastructure Wayne Van.
1 Guidance for the American Recovery and Reinvestment Act of 2009 By David G. Bullock, Partner Macias Gini & O’Connell LLP.
Federal Budget Process Steve Kidd and Allison Boehm Budget and Program Analysis Staff April 2009.
THE NSF BUDGET Overview of Agency Funding Processes Presented by Beth Blue National Science Foundation Office of Budget, Finance, and Award Management.
FY 2013 Request: Total R&D by Agency Budget Authority in Billions of Dollars.
FY 2012 SIG 1003G LEAD PARTNER REQUEST FOR SEALED PROPOSAL (RFSP) BIDDERS’ CONFERENCE February 7, 2011.
Mark Coles Deputy Director, Large Facility Projects Office of Budget, Finance, and Award Management National Science Foundation October 1, 2010.
Conversation with ACCORD on GSMT 21 January 2005 Michael S. Turner, Assistant Director Directorate for Mathematical & Physics Sciences National Science.
Merit Review and Proposal Preparation Mark Courtney Division of Environmental Biology
No 1 REVIEW OF ACADEMIC STRUCTURE PROPOSED GENERAL STAFF STRUCTURE 3 June 2008.
NSF Program Update Astronomy & Astrophysics Advisory Committee 13 February 2006.
Large Facility Projects (LFP) – Guidelines & Procedures Manual Jack Lightbody Interim LFP Deputy, BFA October 10, 2002 Status Report to the NSB.
Overview of the National Science Foundation (NSF) and the Major Research Instrumentation (MRI) Program Office of Integrative Activities National Science.
1 The Thirty-Meter Telescope (TMT) Richard Ellis, Steele Professor and California Institute of Technology TMT Board member Michael Bolte, Director, University.
Division of Astronomical Sciences Program Update AAAC 11 February 2008.
Introduction & Background Collective Bargaining History Agency Demographics Wage Comparisons Wage Proposal Summary of Additional Funding Action Requested.
VIRGINIA PUBLIC-PRIVATE EDUCATION FACILITIES AND INFRASTRUCURE ACT OF 2002 (PPEA) Augusta County Board of Supervisors Wednesday, January 6, 2009.
Module 22 STEPS 11, 12, 13 & 14 Washington Level and Administration Review Processes Module 22 STEPS 11, 12, 13 & 14 Washington Level and Administration.
1 1 AST Committee of Visitors February 2011 National Solar Observatory Overview Craig Foltz Program Officer NSO.
BFA Update National Science Foundation Advisory Committee for Business and Operations November 18, 2004 Tom Cooley NSF Chief Financial Officer Director,
MREFC Process Mark Coles Deputy Director, Large Facility Projects Office of Budget, Finance, and Award Management NSF June 12, 2006.
NCSX Management Overview Hutch Neilson, NCSX Project Manager NCSX Conceptual Design Review Princeton, NJ May 23, 2002.
The National Radio Astronomy Observatory is a facility of the National Science Foundation operated under cooperative agreement by Associated Universities,
Columbia River Water Management Program (CRWMP) Review of Year One Upper Crab Creek Planning Unit Meeting April 17, 2007.
Screen | 1 EPA - Drivers for Regionalisation Max Harvey Director Operations Environment Protection Authority Presentation, reference, author, date.
Water Supply Planning Initiative State Water Commission November 22, 2004.
National Science Foundation Status of the Solar-Terrestrial Research Program & SHINE Tom Bogdan (Presented by Paul Bellaire)
NSF Program Update Astronomy and Astrophysics Advisory Committee February 15, 2005.
NSF Program Update Astronomy & Astrophysics Advisory Committee 11 May 2006.
Facilities Subcommittee Meeting of November 2-3, 2005 Characteristics of the Meeting: 4 of the 5 Subcommittee members attended in person; all 5 members.
American Recovery and Reinvention Act (ARRA) Dartmouth College Updates March 2009.
Commission on Teacher Credentialing Ensuring Educator Excellence 1 Biennial Report October 2008.
1 Investing in America’s Future The National Science Foundation Strategic Plan for FY Advisory Committee for Cyberinfrastructure 10/31/06 Craig.
NSF Update AAAC 8 February Update Topics FY2007 Budget Situation FY2007 Budget Situation FY2008 Request FY2008 Request Senior Review Status and.
NSF Division of Astronomical Sciences (AST) Update February 27, 2015 Patricia Knezek, Deputy Division Director, MPS/AST Jim Ulvestad, Division Director,
LIGO-G M Advanced LIGO MREFC (Construction) Proposal Submission Gary Sanders Caltech/LIGO November 2001.
NSF Program Update Astronomy & Astrophysics Advisory Committee 12 October 2006.
John Peoples for the DES Collaboration BIRP Review August 12, 2004 Tucson1 DES Management  Survey Organization  Survey Deliverables  Proposed funding.
Morris Aizenman Senior Scientist Directorate for Mathematical & Physical Sciences National Science Foundation Physics and Engineering Sciences Committee.
National Science Foundation Division of Astronomical Sciences Facility/Large Project Oversight and Role of Managing Organization Committee of Visitors.
1 Large Synoptic Survey Telescope Status Update for AAAC October 13, 2011 Nigel Sharp Division of Astronomical Sciences, NSF Kathy Turner Office of High.
“From the Ground Up: Balancing the NSF Astronomy Program” Senior Review Major Recommendations November 2006 Implications for GSMT.
Broad Beach Sand & Dune Habitat Restoration Project Broad Beach Revetment Owners August 29, 2015.
NSF – HSI Workshop 1 Introduction & NSF Overview NSF Workshop for Sponsored Project Administrators at Hispanic Serving Institutions April 13, Miami,
AST Update Astronomy and Astrophysics Advisory Committee 10 May 2007.
NSF Program Update Astronomy and Astrophysics Advisory Committee Oct 11, 2005.
Proposition 1 Workshop: the Grant Application Process July 2015.
NRC Environmental Reviews for Uranium Recovery Applicants and Licensees James Park (301)
Town of Genoa October 6, Agenda Why are we here? Background Capacity Analysis & Facilities Plan Preferred Alternative Board Direction Implementation.
June 1-5, 2009 June 8-10, 2009 Nuclear Physics at NSF NP Experiment –Structure –Heavy Ions –Symmetries –Hadrons and QCD NP Theory Particle and Nuclear.
Division of Astronomical Sciences Update (Life After the Senior Review) Astronomy and Astrophysics Advisory Committee 11 October 2007.
NOAA Fisheries Update MAFAC Meeting Paul Doremus DAA for Operations September 23, 2014.
Senior Review of NSF Facilities NOAO Users Committee October 4, 2005.
Mid-Scale Projects Vernon Pankonin Team Leader. Mid-Scale Projects Programmatic Characteristics Not a formal funding program. Collection of proposals.
Introduction and NSF Overview. Vannevar Bush And Science: The Endless Frontier.
NSF Update October 2009 Jo Ann Smith, Ph.D. Research Development Office of Research & Commercialization.
Environmental Management Division 1 NASA Headquarters Environmental Management System (EMS) Michael J. Green, PE NASA EMS Lead NASA Headquarters Washington,
Large Synoptic Survey Telescope
NSF-NAC Jim Ulvestad, Division Director, MPS/AST
SCT Project Management Issues
Ocean Observatories Initiative
Management Breakout: MREFC Budget Summary Victor L
Astronomy and Astrophysics Advisory Committee Oct 11, 2005
Unidata Policy Committee Meeting
Budget and Planning Update
Office of Research & Commercialization
Preliminary Project Execution Plan
Contract Award for the Colorado Street Bridge Suicide Mitigation Enhancements Project City Council May 20, 2019 Item # 7.
Presentation transcript:

NSF Division of Astronomical Sciences AAAC October 15-16, 2009 Craig Foltz

Summary AST Budget Overview –Retrospective look –FY 2009 & ARRA –Looking forward –Status of Senior Review implementation Changes in AST Recent Activities and Actions

MPS Budget trends

MPS budget trends (cont.)

AST Budget trends 10 year doubling

FY 2009 Budget Plan & FY 2010 Budget Request

FY2009 spending (including American Reinvestment and Recovery Act, ARRA)

ARRA Funding As shown, roughly 2/3 for grants and 1/3 for overdue facility infrastructure improvements and preconstruction activities. Quite strong restrictions; some suggested spending not permitted; funds bring additional reporting requirements. Success rate in research grants program (AAG) rose from last year’s 21% to a healthy 36%. Risk exaggerated: even if all awards were 3 years (they weren’t) and all of them came back in exactly 3 years (which they won’t), only a 15% increase, which we have seen and handled before. Yes, the funding rate will not be this high in future. Increases for CAREER (low success rate anyway) and Graduate Research Fellowships. Infrastructure improvements long overdue but the problem persists.

FY 2010 Budget Request AST Total: $250.8 M (increase of 10% over FY 2009) Facilities: $141 M (56%) –Gemini - $19.1 M –NAIC - $8.4 M –NOAO - $27.5 M –NSO -$9.1 M –NRAO - $67.1 M –UROs - $10 M Research and Education Grants: $110 M total (44%) –Roughly $45M for AAG; $37 M for instrumentation; –$25 M for special programs (AAPF, CAREER, REU, Cyberinfrastructure, NSF-wide, etc)

Budget Projections? Administration, congressional support for NSF budget doubling over 10 years. How will AST fare in this growth? Administration priorities not well aligned with AST: –“Green” energy –Climate change –Short term economic recovery But historically AST has tracked NSF R&RA quite well

AST Budget trends NSF projection

Status of Senior Review Recommendations VLBA - non-AST funding for 50% of VLBA operations or closure. –NRAO pursuing partnerships, prospects look very good GONG++ - non-AST support of operations or termination, one year after successful SDO commissioning. –NSO pursuing partnership with US Air Force Weather Agency Carry out cost reviews of all facilities –Completed by external firm, report in hand, will be working with observatories to institute (minor) cost savings over next years NAIC (next slide)

National Astronomy and Ionosphere Center (NAIC) Recommendation to ramp budget down to $8M by 2010, $4M in following years. Seek non-AST support to maintain operations or closure –NSF Atmospheric Sciences increasing contribution to operations NSF (AST, ATM) will compete the next cooperative agreement for the management and operation of NAIC. –Recommendations of the 2006 AST Senior Review are being factored into planning. –NSF expects to issue a detailed program solicitation in fall 2009, with full proposals due six months following publication. –Expected to lead to the award of a single, five-year cooperative agreement for the management and operation of NAIC for

Changes in AST FY2009 was a remarkably unusual year. The Division of Astronomical Sciences has been without a full- time Division Director for 18 months. We have been without an Deputy Division Director for 4 months. We have an open permanent PO position. We have a rotator leaving this month, a year before anticipated. Since there was no back-fill, we will soon be short 3-4 Program Officers. The added strain of ARRA was clearly felt. Interviews for DD and DDD are later this month but the most optimistic start is January 2010, probably significantly later. Permanent PO hiring has closed; IPA is now open (until November 20). New management can change the division ’ s direction. Limited staff lack the leisure for planning.

Recent Activities and Actions NRAO Cooperative Agreement with AUI extended for five years. NOAO Cooperative Agreement with AURA extended for 54 months. NSO now has its own Cooperative Agreement, also with AURA for 54 months. Gemini partnership in flux. May have budgetary consequences. MRI R 2 and ARI proposals (both ARRA) under review. ATST FDR and NSB action.

NSB Approval of ATST Construction On August 6, 2009, the National Science Board approved an award to be derived from $146,000,000 of ARRA funds and $151,928,000 of appropriated MREFC funds, in accordance with the following resolution: RESOLVED, that the National Science Board authorizes the Director at his discretion to issue an eight-year award to the Association of Universities for Research in Astronomy for a not- to-exceed amount of $297,928,000 for the construction of the Advanced Technology Solar Telescope. This award will be contingent upon the publication of a record of decision authorizing the commencement of construction.

FY 2010FY 2011FY 2012FY 2013FY 2014FY 2015FY 2016FY 2017 FY 2009 Appropriations 7, ARRA of , Proposed Funding 10,000 20,000 14,928 Total 163,000 20,000 14,928 Cumulative163,000183,000203,000223,000243,000263,000283,000297,928 Construction Cost Estimate

Construction Cost Estimate (cont.) Costs are in spent-year dollars calculated with current OMB escalators. 32.9% contingency – based on Monte Carlo simulations for 95% confidence. 32.9% contingency – based on Monte Carlo simulations for 95% confidence. Includes effect of mitigation of impact on Hawaiian Dark-Rumped Petrel, “Buy American” costs, management of National Park Special Use Permit, etc. Includes effect of mitigation of impact on Hawaiian Dark-Rumped Petrel, “Buy American” costs, management of National Park Special Use Permit, etc. Does not include costs associated with cultural mitigation. Does not include costs associated with cultural mitigation.

20 December 4, 2008AURA SOVCFeb 27, 2007AURA SOC 20 ATST Schedule Overview Site Construction NSF Cost Review NSF Panel Review Technology Development Concept & Design SDRs MREFC “Readiness” Construction Proposal Proposed Site Decision CDUP NSF PDR MREFC Panel “Exit Readiness Review” FDR/Baseline Review Site EIS Process NSB IT & C Initial Operations Initial Operations NSB

Environmental and Cultural Compliance Comprehensive site selection was based on site characteristics derived from flow-down from science drivers. 72 sites studied. Final site selected at Haleakala High Altitude Observatory (U. Hawaii), Maui. Haleakala is the only site that meets the requirements. Environmental Review and Permitting process for site: –Final EIS submitted to EPA on July 24, 2009; published on July 31. –EIS is 3116 pages long; cost >$3M. –Application for building permit (state of Hawaii process) underway; University of Hawaii leads. –More than thirty National Historic Preservation Act Section 106 consultations resulted in draft programmatic agreement currently under negotiation. Record of Decision in development. This will complete compliance requirements.

ATST Site ATST Primary Site ATST Primary Site ATST Alternate Site ATST Alternate Site MauiMaui Hawai’iHawai’i Mauna Kea Pu’u Kolekole Pu’u ’Ula’ula The Geographical Context Haleakala

ATST atop Haleakala, Maui